Coil Sample Clauses

Coil. The rates are after passing on MODVAT BENEFIT to Uttarakhand Jal Sansthan. The revised price (increase/decrease) will be applicable, with respect to date of dispatch on all pipes, within valid delivery period from the date of revision in cost of Steel H.R Coils. It will be the responsibility of the supplier to furnish the details of such increase/decrease to the department latest within 30 days of release of such notification. The variation in pipe prices shall be applicable after 30 days from the date of such increase/decrease in Steel H.R. Coil price, announce by S.A.I.L. S.N. Description of Tolerance in weight As per BIS Required
AutoNDA by SimpleDocs
Coil. 2.5 and up to 3.15 mm (15mm & 20mm med. pipe) Above 3.15 and upto 5.0mm (25mm to 80mm med. & 15mm to 80mm heavy pipe) Above 3.15 (100mm to 150mm med. & heavy pipe) 01 02 03 04 05 06 1. BASE PRICE 35040 34940 36400 123600 Place : Dehradun. Supplier Witness No. 1.................................................
Coil. The rates are after passing on MODVAT BENEFIT to Uttarakhand Jal Sansthan. The revised price (increase/decrease) will be applicable, with respect to date of dispatch on all pipes, within valid delivery period from the date of revision in cost of Steel H.R Coils. It will be the responsibility of the supplier to furnish the details of such increase/decrease to the department latest within 30 days of release of such notification. S.N. Description of Tolerance in weight As per BIS Required 1 For Single Tube - 3.5% - 2% 2 For Car Load lots (for min of 18 MT) - 1.75% - 1.00% The variation in pipe prices shall be applicable after 30 days from the date of such increase/decrease in Steel H.R. Coil price, announce by S.A.I.L. The Nominal Delivery Period for the supplier is 45 days after the date of issue of Supply Order. If supplier does not supply the material under any circumstances, within delivery period, no price increase will be given to him due to increase in price of raw material beyond the stipulated period of 45 days, but if the price of raw material decreases, decreased rates will be given.
Coil. Evaporator Coil; Leak – Restriction; Header/ Dist./ Manifold; Drier; Drain Pan – Primary Only; and TXV Expansion.
Coil. The condenser coil shall be nonferrous construction with corrugated plate fines and copper piping. The coil shall be protected with integral metal guard. The refrigerant flow from the condenser shall be controlled by means of a metering orifice.
Time is Money Join Law Insider Premium to draft better contracts faster.