Common use of Computation of Period of Days, Deadline Clause in Contracts

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is not

Appears in 7 contracts

Samples: stepsonlineresources.com, paulwozniak.com, paulwozniak.com

AutoNDA by SimpleDocs

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 611 the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or 612 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 613 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 6 contracts

Samples: demo.bullformscolorado.com, demo.bullformscolorado.com, demo.bullformscolorado.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 6 contracts

Samples: lightrailhomes.com, lightrailhomes.com, media.bullseyeplus.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 55 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 56 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot 57 a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 6 contracts

Samples: www.housepad.com, formfiles.justia.com, protrain.hs.llnwd.net

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 652 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 653 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 654 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 4 contracts

Samples: www.acreschool.com, esign.com, cdn.fs.teachablecdn.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 56 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 57 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is not

Appears in 4 contracts

Samples: formfiles.justia.com, protrain.hs.llnwd.net, demo.bullformscolorado.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 672 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 673 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 674 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 3 contracts

Samples: static-cdn.edit.site, www.hiredschools.com, www.jmdenverhomes.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 53 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 54 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is not55 not a Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 3 contracts

Samples: demo.bullformscolorado.com, demo.bullformscolorado.com, demo.bullformscolorado.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 664 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 665 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 666 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 3 contracts

Samples: Irrigation Water Lease Agreement, www.archuletacounty.org, eforms.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 58 specified, e.g., three days after MEC, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday 59 or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 60 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 3 contracts

Samples: gallery-widgets.s3.us-west-2.amazonaws.com, u.realgeeks.media, esign.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 3 contracts

Samples: resources.finalsite.net, www.western-colorado-ranch.com, lightrailhomes.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 690 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 691 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 692 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 3 contracts

Samples: www.pueblo.us, www.pueblo.us, www.parkcountyco.gov

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 555 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 556 federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a 557 Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 2 contracts

Samples: cdn.cocodoc.com, protrain.hs.llnwd.net

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 55 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 56 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is not57 not a Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 2 contracts

Samples: protrain.hs.llnwd.net, demo.bullformscolorado.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 543 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 544 federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a 545 Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 2 contracts

Samples: www2.topproducerwebsite.com, protrain.hs.llnwd.net

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 52 specified, e.g., three days after MEC, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday 53 or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 54 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 2 contracts

Samples: formfiles.justia.com, u.realgeeks.media

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 669 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 670 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 671 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 2 contracts

Samples: eforms.com, formfiles.justia.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 60 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 61 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 62 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 2 contracts

Samples: montrosecounty.granicus.com, montrosecounty.granicus.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 612 the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or 613 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 614 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 2 contracts

Samples: corefinancegroup.com, asapcashhomebuyers.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 667 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 668 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 669 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 2 contracts

Samples: formfiles.justia.com, pdfliner.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 X 53 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 54 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is not55 not a Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 2 contracts

Samples: www.boulderrealestatenews.com, 1paoedzvsgu45vpdrtfhza16-wpengine.netdna-ssl.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, e.g., three days after MEC, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, Sunday 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 56 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 2 contracts

Samples: formfiles.justia.com, pdfliner.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is not56 not a Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 2 contracts

Samples: protrain.hs.llnwd.net, protrain.hs.llnwd.net

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 2 contracts

Samples: velocondos.com, www.centralparkscoop.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specifiedX 58 specified (e.g., three days after MEC), the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday 59 Sunday, or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot 60 a Saturday, Sunday, or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: highnote-backend.s3.amazonaws.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 608 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 609 federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a 610 Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: protrain.hs.llnwd.net

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified58 specified (e.g., three days after MEC), the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday 59 Sunday, or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot 60 a Saturday, Sunday, or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: static1.squarespace.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 577 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 578 federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a 579 Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: demo.bullformscolorado.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day 32 is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday 33 (Holiday), such deadline Will Will  Shall  Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be 34 checked, the deadline shall not be extended.

Appears in 1 contract

Samples: byownercolorado.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 554 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 555 federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a 556 Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: protrain.hs.llnwd.net

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is 33 excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), 34 such deadline Will Will □ Shall □ Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall 35 not be extended.

Appears in 1 contract

Samples: www.topproducerwebsite.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: f01.justanswer.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day   32 is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday 33 (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be 34 checked, the deadline shall not be extended.

Appears in 1 contract

Samples: reiwealthprofit.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 685 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 686 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 687 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: www.co.routt.co.us

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 627 the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or 628 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 629 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: s3.amazonaws.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day 🞏 🞏 32 is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday 33 (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be 34 checked, the deadline shall not be extended.

Appears in 1 contract

Samples: www.ncts.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 53 specified, e.g., three days after MEC, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline 54 falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the 55 next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: www.buyfortcollinshomes.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 571 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 572 federal or Colorado state holiday (Holiday), such deadline Will Will n Shall o Shall Not be extended to the next day that is notnot a 573 Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: Real Estate Purchase and Sales Agreement (Wells Real Estate Fund Viii Lp)

AutoNDA by SimpleDocs

Computation of Period of Days, Deadline. In computing a period of days, when the 37 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after 38 MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such 39 deadline Will Will  Shall  Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. 40 Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: www.fillanypdf.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: www.townoflyons.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 588 the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or 589 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 590 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: boulderrealestatenews.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 55 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 56 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is not

Appears in 1 contract

Samples: www.housepad.com

Computation of Period of Days, Deadline. In computing a period of days, (e.g., three days after MEC), when the 728 ending date is not 54 specified, the first day is excluded and the last day is included, included (e.g., three days after MEC. ).. If any deadline falls 729 on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the 730 next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: www.ltac.org

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 771 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 772 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 773 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: cox-education.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 716 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 717 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 718 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: formfiles.justia.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day 32 is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday 33 (Holiday), such deadline Will Will 🞏 Shall 🞏 Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be 34 checked, the deadline shall not be extended.

Appears in 1 contract

Samples: www.legalwiz.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 X 52 specified, e.g., three days after MEC, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday 53 or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 54 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: highnote-backend.s3.amazonaws.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 641 the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or 642 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 643 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: demo.bullformscolorado.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, e.g., three days after MEC, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: www.thefiteam.com

Computation of Period of Days, Deadline. In computing a period of days, when the 37 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after 38 MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such  39 deadline Will Will Shall  Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. 40 Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: www.legalwiz.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 471 the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or 472 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 473 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: montrosecounty.granicus.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 X 55 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 56 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot 57 a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: nocohometeam.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 61 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline 62 falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not □ Shall □ Shall 63 not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, 64 the deadline shall not be extended.

Appears in 1 contract

Samples: www.topproducerwebsite.com

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: armbrust-rei.com

Computation of Period of Days, Deadline. In computing a period of daysdays ( e.g., three days after MEC), when the ending 673 date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or 674 Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, Sunday or 675 Holiday. Should neither box be checked, the deadline will not be extended. 676

Appears in 1 contract

Samples: archuletacounty.org

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 59 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 60 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a 61 Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: montrosecounty.granicus.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 59 specified, e.g., three days after MEC, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline 60 falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the 61 next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: www.buyfortcollinshomes.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, 544 the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 545 federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a 546 Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: www.vaned.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the 52 first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado 53 state holiday (Holiday), such deadline Will Will  Shall  Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should 54 neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: protrain.hs.llnwd.net

Computation of Period of Days, Deadline. In computing a period of daysdays (e.g., three days after MEC), when the 544 ending date is not 54 specified, the first day is excluded and the last day is included, e.g., three days after MEC. If any deadline falls on a Saturday, 55 Sunday or 545 federal or Colorado state holiday (Holiday), such deadline Will Will Not be extended to the next day that is notnot a Saturday, 546 Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: www.riverruncolorado.com

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, included (e.g., three days after MEC). If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline x Will o Will Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline will not be extended.

Appears in 1 contract

Samples: Agreement (Farmland Partners Inc.)

Computation of Period of Days, Deadline. In computing a period of days, when the ending date is not 54 specified, the first day is excluded and the last day is included, e.g., e.g. three days after MEC. If any deadline falls on a Saturday, 55 Sunday or federal or Colorado state holiday (Holiday), such deadline Will Will Shall Shall Not be extended to the next day that is notnot a Saturday, Sunday or Holiday. Should neither box be checked, the deadline shall not be extended.

Appears in 1 contract

Samples: coownershiprealestate.com