Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.
Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.
Fuel Upon redelivery of the Aircraft to Lessor, an adjustment will be made in respect of fuel on board on the Previous Delivery Date and the Expiry Date at the price then prevailing at the Redelivery Location.
STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:
Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.
HEATING Landlord shall furnish heat to the Premises when and as required by law, on business days from 8:00 A.M. to 6:00 P.M. Landlord shall not be responsible for the adequacy, design or capacity of the heating distribution system if the normal operation of the heat distribution system serving the Building shall fail to provide heat at reasonable temperatures or any reasonable volumes or velocities in any parts of the Premises by reason of any rearrangement of partitioning or other Alterations made or performed by or on behalf of Tenant or any person claiming through or under Tenant.
Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.
HEATING, VENTILATING AND AIR CONDITIONING The Tenant will operate and regulate those portions of the heating, ventilating, and air conditioning equipment within and serving the Leased Premises so as to maintain such reasonable conditions of temperature and humidity within the Leased Premises as are determined by the Landlord and its Architect and engineers so that no direct or indirect appropriation of the heating, ventilating and air conditioning from the other portions of the Building occurs. The Tenant shall comply with such stipulations and with all Rules and Regulations of the Landlord pertaining to the operation and regulation of such equipment. The Tenant shall immediately notify the Landlord in the event that any repairs are required to the heating, ventilating and air conditioning equipment serving the Leased Premises and shall reimburse the Landlord as part of its Proportionate Share of Operating Costs for the cost of any maintenance, repairs or replacements made by the Landlord in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises. The Landlord acknowledges that the Tenant shall not be responsible for the cost of capital repairs and capital replacements in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises provided that such capital repairs and capital replacements are not necessitated by the Tenant's incorrect or negligent use of equipment. The Tenant shall not under any circumstances go onto the roof of the Building or make any maintenance repairs or replacements to the heating, ventilating and air conditioning systems in the Building without the prior written consent of the Landlord. If the Tenant fails to comply with such stipulations and Rules and Regulations, the Landlord shall be entitled to take such steps as it deems advisable to correct such defaults (including, without limitation, entering upon the Leased Premises and assuming control of such equipment) without liability to the Tenant, and the Tenant will pay to the Landlord forthwith upon demand as Additional Rent all costs and expenses incurred by the Landlord in so doing. The Landlord represents and warrants to the Tenant that the heating, ventilating and air conditioning equipment serving the Leased Premises and required to be installed by the Landlord pursuant to Schedule "C" is and will be at the Commencement Date in good working order and condition.
Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.
Electricity 14.01 Tenant shall obtain electricity for the Demised Premises on a direct meter basis, Tenant shall be responsible for and pay to the applicable utility all charges for electricity as measured by such meter. Landlord shall not in any way be liable or responsible to Tenant for any loss or damage or expense which Tenant may sustain or incur if either the quantity or character of electric service is changed or is no longer available or suitable for Tenant’s requirements. Any additional riser or risers to supply Tenant’s electrical requirements, upon written request to Tenant, will be installed by Landlord, at the sole cost and expense of Tenant, unless, in Landlord’s reasonable judgment, the same will cause permanent damage or injury to the Building or the Demised Premises or cause or create a dangerous or hazardous condition or interfere with or disturb other tenants or occupants. In addition to the installation of such riser or risers, Landlord will also at the sole cost and expense of Tenant, install all other equipment proper and necessary in connection therewith subject to the aforesaid terms and conditions. Tenant covenants and agrees that at all times its use of electric current shall never exceed the capacity of the feeders to the Building or the risers or wiring installation which Landlord represents is sufficient for ordinary office use. It is further covenanted and agreed by the Tenant that all the aforesaid costs and expenses are chargeable and collectible as Additional Rent and shall be paid by the Tenant to the Landlord within ten (10) days after the rendering of any xxxx or statement to the Tenant therefor. Tenant shall make no alterations or additions to the electric equipment and/or appliances without the prior written consent of Landlord in each instance, which consent shall not be unreasonably withheld, conditioned or delayed. Notwithstanding anything to the contrary herein, should electric service be interrupted for a period of more than five (5) consecutive business days through the sole fault of Landlord so as to prevent Tenant from using at least seventy-five (75%) percent of the Demised Premises, Fixed Rent shall xxxxx until such service resumes and Tenant is able to resume the use of at least seventy-five (75%) percent of the Demised Premises. Should such service interruption prevent Tenant from using at least seventy-five (75%) of the Demised Premises for more than sixty (60) days and be due to the sole fault of Landlord, Tenant shall have the right to terminate this Lease by giving written notice to Landlord no later than the seventieth (70th) consecutive day and vacating no later than the ninetieth (90th) consecutive day. TIME BEING OF THE ESSENCE for Tenant as to both dates.