Construction Deflection, Defects and Changes Sample Clauses

Construction Deflection, Defects and Changes. During the course of construction of the building, certain floors may be subject to a small degree of “deflection” from construction and settling. Deflection is a condition whereby a floor is not perfectly flat. Deflection is typical in concrete construction. In this instance, such deflection, if not treated, might be noticeable to some people. Much of the practical effect of deflection can be mitigated through the use of floor coverings. Given the nature of the soil upon which the building is constructed, it is possible some further settling may occur. Deflection (and any anticipated additional settling) typically does not detract from the structural integrity of the building and Seller is not responsible to correct such deficiencies. Minor cracking, flaking or discoloration of concrete or drywall within the building floors, walls, ceilings and/or soffits and the driveways and walkways are not covered by warranty, and Seller is not responsible to correct such deficiencies.
AutoNDA by SimpleDocs

Related to Construction Deflection, Defects and Changes

  • Additional Conditions For each mediation or arbitration:

  • Environmental Conditions A Phase I environmental site assessment (or update of a previous Phase I and or Phase II environmental site assessment) and, with respect to certain Mortgage Loans, a Phase II environmental site assessment (collectively, an “ESA”) meeting ASTM requirements conducted by a reputable environmental consultant in connection with such Mortgage Loan within 12 months prior to its origination date (or an update of a previous ESA was prepared), and such ESA (i) did not identify the existence of Recognized Environmental Conditions (as such term is defined in ASTM E1527-05 or its successor, hereinafter “Environmental Condition”) at the related Mortgaged Property or the need for further investigation, or (ii) if the existence of an Environmental Condition or need for further investigation was indicated in any such ESA, then at least one of the following statements is true: (A) an amount reasonably estimated by a reputable environmental consultant to be sufficient to cover the estimated cost to cure any material noncompliance with applicable Environmental Laws or the Environmental Condition has been escrowed by the related Mortgagor and is held or controlled by the related lender; (B) if the only Environmental Condition relates to the presence of asbestos-containing materials, radon in indoor air, lead based paint or lead in drinking water, the only recommended action in the ESA is the institution of such a plan, an operations or maintenance plan has been required to be instituted by the related Mortgagor that can reasonably be expected to mitigate the identified risk; (C) the Environmental Condition identified in the related environmental report was remediated, abated or contained in all material respects prior to the date hereof, and, if and as appropriate, a no further action, completion or closure letter or its equivalent, was obtained from the applicable governmental regulatory authority (or the Environmental Condition affecting the related Mortgaged Property was otherwise listed by such governmental authority as “closed” or a reputable environmental consultant has concluded that no further action or investigation is required); (D) an environmental policy or a lender’s pollution legal liability insurance policy that covers liability for the Environmental Condition was obtained from an insurer rated no less than “A-” (or the equivalent) by Xxxxx’x, S&P and/or Fitch; (E) a party not related to the Mortgagor was identified as the responsible party for the Environmental Condition and such responsible party has financial resources reasonably estimated to be adequate to address the situation; or (F) a party related to the Mortgagor having financial resources reasonably estimated to be adequate to address the situation is required to take action. To Seller’s knowledge, except as set forth in the ESA, there is no Environmental Condition at the related Mortgaged Property.

  • Completion of Punch List items 14.4.1 All items in the Punch List shall be completed by the Concessionaire within 90 (ninety) days of the date of issue of the Provisional Certificate and for any delay thereafter, other than for reasons solely attributable to the Authority or due to Force Majeure, the Authority shall be entitled to recover Damages from the Concessionaire to be calculated and paid for each day of delay until all items are completed, at the lower of (a) 0.1% (zero point one per cent) of the Performance Security, and (b) 0.2% (zero point two per cent) of the cost of completing such items as estimated by the Independent Engineer. Subject to payment of such Damages, the Concessionaire shall be entitled to a further period not exceeding 120 (one hundred and twenty) days for completion of the Punch List items. For the avoidance of doubt, it is agreed that if completion of any item is delayed for reasons solely attributable to the Authority or due to Force Majeure, the completion date thereof shall be determined by the Independent Engineer in accordance with Good Industry Practice, and such completion date shall be deemed to be the date of issue of the Provisional Certificate for the purposes of Damages, if any, payable for such item under this Clause 14.4.1.

  • Escalation/De-escalation Clause In the event that prevailing market conditions warrant an adjustment in bid prices contained in the contract, the following escalation/de- escalation clause shall be the only clause applicable or acceptable:

  • Classification Definitions Note: The following classification definitions should be read in conjunction with: • the stream and field definitions in subclause 1.4.3 and 1.4.75 respectively: • the definitions of “or equivalent”, “work within the scope of this level” and “Engineering Associate” at the end of this Schedule; • the National Metal and Engineering Competency Standards Implementation Guide especially Table 2 of that Guide which shows the alignment between old and new titles under the Australian Qualifications Framework. For example Advanced Certificates are now known as National Diplomas and Associate Diplomas as National Advanced Diplomas; • Clause 5.1.3 (f) Points. Trainer/Supervisor/Coordinator - Level 1 A Trainer/Supervisor/Coordinator - Level I is an employee who is responsible for the work of other employees and/or provision of structured on-the-job training. Such an employee has completed a qualification at AQFIII level or above, of which at least one third of the competencies are related to supervision/training, or equivalent. Notwithstanding the above definition an employee who is mainly engaged to perform work supervising or coordinating the work of other employees and who has sufficient additional training beyond that of those coordinated or supervised so as to enable the employee to perform work within the scope of this level shall be classified at this level. Trainer/Supervisor/Coordinator - Level II A Trainer/Supervisor/Coordinator - Level II is an employee who is responsible for the supervision and/or training of Trainers/Supervisors/Coordinators - Level I. Such an employee has completed an AQF IV or V qualification or equivalent of which at least 50% of the competencies are in supervision/training. WAGE GROUP: C14 Engineering/Production Employee - Level I As Engineering/Production Employee - Level I is an employee who is undertaking up to 38 hours induction training which may include information on the enterprise, conditions of employment, introduction to supervisors and fellow workers, training and career path opportunities, plant layout, work and documentation procedures, occupational health and safety, equal employment opportunity and quality control/assurance. An employee at this level performs routine duties essentially of a manual nature and to the level of his/her training:

  • Environmental Condition Except as set forth on Schedule 5.12 to the Information Certificate, (a) to each Loan Party’s knowledge, no properties or assets of any Loan Party or any of its Subsidiaries have ever been used by a Loan Party, its Subsidiaries, or by previous owners or operators in the disposal of, or to produce, store, handle, treat, release, or transport, any Hazardous Materials, where such disposal, production, storage, handling, treatment, release or transport was in violation, in any material respect, of any applicable Environmental Law, (b) to each Loan Party’s knowledge, after due inquiry, no Loan Party’s nor any of its Subsidiaries’ properties or assets have ever been designated or identified in any manner pursuant to any environmental protection statute as a Hazardous Materials disposal site, (c) no Loan Party nor any of its Subsidiaries has received notice that a Lien arising under any Environmental Law has attached to any revenues or to any Real Property owned or operated by a Loan Party or its Subsidiaries, and (d) no Loan Party nor any of its Subsidiaries nor any of their respective facilities or operations is subject to any outstanding written order, consent decree, or settlement agreement with any Person relating to any Environmental Law or Environmental Liability that, individually or in the aggregate, could reasonably be expected to result in a Material Adverse Change.

  • Supplemental Conditions 1. All individuals involved, and all others who might possibly contribute to the acceptable adjustment of a grievance, are authorized and urged to testify with full assurance that no reprisal will follow by reason of such participation.

  • Operation Delays STATE shall have the authority to delay or suspend the operations of PURCHASER and contractors of PURCHASER, wholly or in part, under this contract for such period or periods necessary due to fire hazard conditions, severe weather occurrence, surveying for threatened or endangered species listed under the state or federal Endangered Species Act, or any other activity STATE determines to be necessary for identification, management, or protection of a threatened or endangered species. PURCHASER agrees to cooperate with surveying efforts of STATE or its contractors. In no event shall STATE be liable for any costs incurred by PURCHASER by reason of delay or suspension under this section, including but not limited to costs of additional move-in/move-out of equipment and personnel, extra fire and equipment security, and insurance or bonding expenses.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Termination; Default If Contractor is in default of any of its obligations under this Contract and has not commenced cure within ten days after receipt of a written notice of default from County and cured such default within the time specified in the notice, the County shall immediately be entitled to either commence resolution in accordance with this paragraph or to terminate this Contract by giving written notice to take effect immediately. Default shall include failure to carry out any of the requirements of this Contract, including, but not limited to not providing enough properly skilled workers or proper materials, persistently disregarding laws and or ordinances, not proceeding with the work as agreed to herein, or otherwise substantially violating any provision of this Contract. Upon termination of the Contract with Contractor, the County may begin negotiations with a third-party Contractor to provide goods and/or services as specified in this Contract. The right of either party to terminate this Contract hereunder shall not be affected in any way by its waiver of or failure to take action with respect to any previous default.

Time is Money Join Law Insider Premium to draft better contracts faster.