Construction Manager's Representative. Construction Manager designates the individual listed below as its Construction Manager's Representative to provide direct interface with Owner with respect to Construction Manager's responsibilities: Xxxxxxx Xxxxxx, Construction Manager's, Project Manager. Exhibit C- Project Assignment Page 3 of 4 Exhibit C-1 – List of Contract Documents Page 1 of 1 February 8, 2022 School Board of Brevard County 2725 Judge Xxxx Xxxxxxxx Way HCI Project 2204641200 PO# BPS Bayside HS Elevated Walkway Structural Repairs Building 000 Xxxxx 0 Xxxxx , XX 00000-0000 Attn: Xxxx Xxxxxx Subject: CM Proposal for Bayside HS Elevated Walkway Structural Repairs Building 600 Dear Xxxx, At your request we are providing our proposal for Construction Management Services for the subject project. All work will be subject to terms and conditions as stipulated in the Continuing Contract for Construction Management Services between Heard Construction Inc. and the School Board of Brevard County based of the TLC Reported dated 12/16/2021 along with the Xxxxxxxx Xxxxxx Architecture drawings and specifications dated 01/21/2022 outlining the following scope of work: 1. Maintain temporary fencing around construction site to protect students & staff from construction activities. 2. Selective demolition to include removal of fire proofing per Plan. 3. Remove visible rust from from steel members, prime & paint per Plan. 4. Furnish and install new 3-5/8” structural 18 gauge metal framing with 5/8” Densglass on soffits. 5. Provide and install (Xxxxxx ALPRO) Powder Coated ivory ceiling panels including site specific shop drawings. 6. Direct apply synthetic stucco to Densglass Sheating. Backstop NT Waterproofing. Finish and color TBD. 7. Paint back wall, columns and new stucco areas. 8. Provide and install Stoneguard TM to 2nd Floor Walkway per Plan. 9. Remove and reinstall handrail to accommodate new walkway Stoneguard TM Application per Plan. HCI’s GMP to provide Construction Management Services is $242,569.52. We have enclosed our “SBBC GMP Estimate” detailing the costs for the project. We have included supervision for the duration of the project. A $25,000.00 Project Contingency Allowance without fee markup is included. Xxxxxxx Xxxxxx will be HCI’s Project Manager and HCI’s full time on-site Superintendent is To Be Determined (TBD). Estimated Owner Direct Purchases (ODP’s), including sales tax, will be provided under separate cover. This work will begin on receipt of your “Authorization to Proceed” and will be substantially completed by 7/31/2022. The Preliminary Project Schedule is as follows: Board approval: 3/8/22 Notice To Proceed issued - 3/9/22 Purchase Order Issued - 4/4/22 Start construction - 6/1/22 Substantial Completion - 7/31/22 We acknowledge that if Substantial Completion is not attained before 7/31/22 Liquidated Damages in the amount of $1000.00 per day will be imposed. If HCI fails to attain Substantial Completion the Final Completion Date shall be reset to the ninetieth (90th) day after the date of actual Substantial Completion and Liquidated Damaged will be imposed at $500.00 per day. QUALIFICATIONS, CLARIFICATIONS AND EXCLUSIONS 1. Any Building Official requirements not specifically included in this proposal are excluded. 2. Only work described in the above scope of work is included in this project.
Appears in 1 contract
Construction Manager's Representative. Construction Manager designates the individual listed below as its Construction Manager's Representative to provide direct interface with Owner with respect to Construction Manager's responsibilities: Xxxxxxx XxxxxxLu Xxxx Xxxxxxx, Construction Manager's, Project Manager. Exhibit C- Project Assignment Page 3 of 4 Exhibit C-1 – List of Contract Documents Page 1 of 1 February 815, 2022 School Board of Brevard County 2725 Judge Xxxx Xxxxxxxx Way HCI Project 2204641200 2104643200 PO# BPS Bayside HS Elevated Walkway Structural Repairs Building 000 Xxxxx 0 Xxxxx Riviera ES Canopy Refurbishment Viera , XX 00000FL 32940-0000 6699 Attn: Xxxx Xxxxxx Xxx Xxxxx Subject: CM GMP Proposal for Bayside HS Elevated Walkway Structural Repairs Building 600 Riviera Elementary School Canopy Refurbishment Dear XxxxXxx, At your request we are providing our proposal for Construction Management Services for the subject project. All work will be subject to terms and conditions as stipulated in the Continuing Contract for Construction Management Services between Heard Construction Inc. and the School Board of Brevard County based of the and TLC Reported Engineering Solutions Canopy Evaluation dated 12/16/2021 along with the Xxxxxxxx Xxxxxx Architecture drawings 11/4/2019 and specifications subsequent Structural Drawings dated 01/21/2022 1/17/22 outlining the following scope Scope of workWork:
1. Maintain temporary fencing around construction site to protect students & staff from construction activitiesDemolition and removal of existing rusted roof panels and trim on the Drop Off Pavilion.
2. Selective demolition to include removal of fire proofing Structural steel repairs as per PlanTLC Canopy Repair Drawings.
3. Remove visible rust from from steel membersThoroughly clean 8 Canopies, prime Drop Off & paint per PlanCourtyard Pavilions.
4. Furnish and install new 3-5/8” structural 18 gauge metal framing Coat all top sides of canopies with 5/8” Densglass on soffitsSilicon Metal Roofing Coatings.
5. Provide and install (Xxxxxx ALPRO) Powder Coated ivory ceiling panels including site specific shop drawingsPaint all canopies, Drop Off & Courtyard Pavilions to match existing color.
6. Direct apply synthetic stucco to Densglass Sheating. Backstop NT Waterproofing. Finish and color TBD.
7. Paint back wall, columns and new stucco areas.
8. Provide and install Stoneguard TM to 2nd Floor Walkway per Plan.
9. Remove and reinstall handrail to accommodate new walkway Stoneguard TM Application per Plan. HCI’s GMP to provide Construction Management Services is $242,569.52. We have enclosed our “SBBC GMP Estimate” detailing the costs for the project. We have included supervision for the duration of the project. A $25,000.00 Project Contingency Allowance without fee markup is included. Xxxxxxx Xxxxxx will be HCI’s Project Manager and HCI’s full time on-site Superintendent is To Be Determined (TBD). Estimated Owner Direct Purchases (ODP’s), including sales tax, will be provided under separate cover. This work will begin on receipt of your “Authorization to Proceed” and will be substantially completed by 7/31/2022. The Preliminary Project Schedule is as follows: Board approval: 3/8/22 Notice To Proceed issued - 3/9/22 Purchase Order Issued - 4/4/22 Start construction - 6/1/22 Substantial Completion - 7/31/22 We acknowledge that if Substantial Completion is not attained before 7/31/22 Liquidated Damages in the amount of $1000.00 per day will be imposed. If HCI fails to attain Substantial Completion the Final Completion Date shall be reset to the ninetieth (90th) day after the date of actual Substantial Completion and Liquidated Damaged will be imposed at $500.00 per day. QUALIFICATIONS, CLARIFICATIONS AND EXCLUSIONS
1. Any Building Official requirements not specifically included in this proposal are excluded.
2. Only work described in the above scope of work is included in this project.
Appears in 1 contract
Samples: Guaranteed Maximum Price Agreement
Construction Manager's Representative. Construction Manager designates the individual listed below as its Construction Manager's Representative to provide direct interface with Owner with respect to Construction Manager's responsibilities: Xxxxxxx XxxxxxXx Xxxx Xxxxxxx, Construction Manager's, Project Manager. Exhibit C- Project Assignment Page 3 of 4 Exhibit C-1 – List of Contract Documents Page 1 of 1 February 821, 2022 2023 School Board of Brevard County 2725 Judge 0000 Xxxxx Xxxx Xxxxxxxx Way Xxx HCI Project 2204641200 2304640300 PO# BPS Bayside HS Elevated Walkway Structural Repairs Building 000 Xxxxx 0 Xxxxx Discovery Canopy Refubishment Viera , XX 00000FL 32940-0000 6699 Attn: Xxxx Xxxxxx Xxx Xxxxx Subject: CM Services Proposal for Bayside HS Elevated Walkway Structural Repairs Building 600 - Discovery ES Canopy Refurbishment Dear XxxxXxx, At your request we are providing our proposal for Construction Management Services for the subject project. All work will be subject to terms and conditions as stipulated in the Continuing Contract for Construction Management Services between Heard Construction Inc. and the School Board of Brevard County based of the and TLC Reported Engineering Solutions Canopy Evaluation dated 12/16/2021 along with the Xxxxxxxx Xxxxxx Architecture drawings 5/23/2022 and specifications subsequent TLC Structural Drawings dated 01/21/2022 12/7/2022 outlining the following scope Scope of workWork:
1. Maintain temporary fencing around construction site to protect students Demolition and removal of existing rusted purlins at the drop off canopy & staff from construction activitiescourtyard canopy per Plan.
2. Selective demolition to include removal of fire proofing Structural steel repairs as per PlanTLC Canopy Repair Drawings.
3. Remove visible rust from from steel membersPrepare, prime & corrosion control and paint per Planentry pavilion, commons pavilion and barrel canopies.
4. Furnish Pressure wash entry and install new 3-5/8” structural 18 gauge metal framing with 5/8” Densglass on soffitscommons pavilion at Spring Break and again prior to painting.
5. Provide and install (Xxxxxx ALPRO) Powder Coated ivory ceiling panels including site specific shop drawingsRemove latex paint from barrel canopies.
6. Direct apply synthetic stucco to Densglass Sheating. Backstop NT Waterproofing. Finish and color TBDPaint commons & entry pavilion roof underside.
7. Paint back wall, columns and new stucco areasbarrel canopy soffit.
8. Provide Paint system: Spot prime, intermediate coat and install Stoneguard TM to 2nd Floor Walkway per Plantwo topcoats.
9. Apply Uniflex 44-300 to barrel canopy roofs (not including sides/soffit)
10. Remove soffit and reinstall handrail dome roofing to accommodate support duct insulation replacement.
11. Demo & remove supply & return duct insulation on one (1) crossover canopy from mechanical room to adjacent classroom building. Provide 1” Armaflex insulation on supply duct from mechanical room to classroom building.
12. Prep & repaint light fixtures at entry canopy and courtyard canopy.
13. Demolition of existing Delaminating Stucco & Ceramic Tiles on Concrete Radius Columns in twelve (12) locations Only.
14. Install repair grout where necessary to fill in voids following demolition.
15. Create 3/4" Slope at Top of Radius Columns to eliminate ponding for water intrusion.
16. Install Bonding Agent on demo'ed areas of columns Only.
17. All existing Concrete Column bases will be coated with integral layer of 4.3oz mesh fully encapsulated in cementitious base coat with hand trowel application.
18. Install New EIFS Finish Coat over all base coated Columns with Dryvit Sandpebble Fine finish coat texture with hand trowel application to match new walkway Stoneguard TM Application per Planpaint color. HCI’s GMP to provide Construction Management Services is $242,569.52. 600,074.53 We have enclosed our “SBBC GMP Estimate” detailing the costs for the this project. We have included supervision for the duration of the project. A $25,000.00 Project Contingency Allowance without fee markup is included. XxXxxx Xxxxxxx Xxxxxx will be HCI’s Project Manager and HCI’s full time on-site Superintendent is To Be Determined (TBD). Estimated There will be no Owner Direct Purchases (ODP’s), including sales tax, will be provided under separate cover) for this Project. This work will begin on receipt of your “Authorization to Proceed” and will be substantially completed by 7/31/20221/4/2024. The Preliminary Project Schedule is as follows: Board approval: 3/8/22 3/7/2023 Notice To Proceed issued - 3/9/22 Purchase Order Issued 3/8/2023 Pressure Wash Spring Break - 4/4/22 3/13/2023 - 3/17/2023 Start construction Construction - 6/1/22 5/29/2023 Substantial Completion - 7/31/22 1/4/2024 Final Completion - 4/3/2024 We acknowledge that if Substantial Completion is not attained before 7/31/22 1/4/2024 Liquidated Damages in the amount of $1000.00 per day will be imposed. If HCI fails to attain Substantial Completion the Final Completion Date shall be reset to the ninetieth (90th) day after the date of actual Substantial Completion and Liquidated Damaged will be imposed at $500.00 per day. QUALIFICATIONS, CLARIFICATIONS AND EXCLUSIONS
1. Any Building Official requirements not specifically included in this proposal are excluded.
2. Only work described in the above scope of work is included in this project.
3. All costs associated with the removal of hazardous materials, if encountered, is excluded.
4. A&E Fees are excluded.
Appears in 1 contract
Samples: Guaranteed Maximum Price Agreement
Construction Manager's Representative. Construction Manager designates the individual listed below as its Construction Manager's Representative to provide direct interface with Owner with respect to Construction Manager's responsibilities: Xxxxxxx XxxxxxXxXxxx Xxxxxxx, Construction Manager's, Project Manager. Exhibit C- Project Assignment Page 3 of 4 Exhibit C-1 – List of Contract Documents Page 1 of 1 February 8August 16, 2022 HCI Project 2204641700 PO# 12203274 School Board of Brevard County 2725 Judge Xxxx Xxxxxxxx Way HCI Project 2204641200 PO# BPS Bayside HS Elevated Walkway Structural Repairs Building 000 Xxxxx 0 Xxxxx PC Cape View Playground Improvements Viera , XX 00000FL 32940-0000 6699 Attn: Xxxx Xxxxxx Xxx Xxxxx Subject: CM GMP Proposal for Bayside HS Elevated Walkway Structural Repairs Building 600 Cape View Elementary School Playground Improvements_REV Dear XxxxXxx, At your request we are providing our proposal for Construction Management Services for the subject project. All work will be subject to terms and conditions as stipulated in the Continuing Contract for Construction Management Services between Heard Construction Inc. and the School Board of Brevard County based of the TLC Reported and EJH Landscape Architecture Drawings dated 12/16/2021 along with the Xxxxxxxx Xxxxxx Architecture drawings and specifications dated 01/21/2022 6/16/22 outlining the following scope of workWork:
1. Maintain temporary fencing Install DOT silt fence around construction site to protect students & staff from construction activities2 existing surface inlet structures only.
2. Selective demolition Import and install premium Command Compost to include removal depth of fire proofing per Plan1” over entire new sod area.
3. Remove visible rust from from steel members, prime & paint per PlanRoto Till 2X directions Command Compost into existing soils and decaying biomass to approx. 5”-6” depth.
4. Furnish Compact and install new 3-5/8” structural 18 gauge metal framing with 5/8” Densglass on soffitsgrade site to direct water to 2 existing storm water inlets located within the field area.
5. Provide and install (Xxxxxx ALPRO) Powder Coated ivory ceiling panels including site specific shop drawingsInstall new irrigation system per plans.
6. Direct apply synthetic stucco to Densglass Sheating. Backstop NT Waterproofing. Finish and color TBDsurface grade for smoothness in preparation for sod.
7. Paint back wallTake soil test, columns and new stucco areasadd necessary pre-plant nutrients.
8. Provide and install Stoneguard TM to 2nd Floor Walkway per Plan.Install certified 419 Bermuda sprigs
9. Remove Execute 90 day complete grow in program for Bermuda grass turf, including top dressing, rolling, mowing, any and reinstall handrail all weed/pest controls, etc.
10. Site clean up.
11. Wet Tap exiting irrigation water line . Install new water meter for irrigation system.
12. Installation of a 20 AMP 240/120 Volt Circuit from existing mobile home to accommodate the new walkway Stoneguard TM Application per Planirrigation control panel mounted to concrete post with stainless steel brackets.
13. Underground utility locates will be provided for this project. HCI’s GMP to provide Construction Management Services is $242,569.52127,569.00. We have shown and additive alternate of $14,785.90 to provide full rolled sod and a thirty day grow in period. We have enclosed our “SBBC GMP Estimate” detailing the costs for the this project. We have not included supervision for the duration of the project, only Project Manager site visits to monitor progress. A $25,000.00 5,000.00 Project Contingency Allowance without fee markup is included. XxXxxx Xxxxxxx Xxxxxx will be HCI’s Project Manager and HCI’s full time on-site Superintendent for the Project. If a waiver is To Be Determined (TBD)required for the reclaimed water during the grow in period it is the responsibility of the School Board to obtain the waiver from the City of Cape Canaveral. Estimated HCI will be happy to attend a kick off meeting with the City of Cape Canaveral. There will be no Owner Direct Purchases (ODP’s), including sales tax, will be provided under separate cover) for this Project. This work will begin on receipt of your “Authorization to Proceed” and will be substantially completed by 7/31/202212/31/22. The Preliminary Project Schedule is as follows: Board approval: 3/8/22 9/8/2022 Notice To Proceed issued - 3/9/22 Purchase Order Issued - 4/4/22 9/9/2022 Start construction - 6/1/22 9/15/2022 Substantial Completion - 7/31/22 12//31/22 Final Completion - 1/31/23 We acknowledge that if Substantial Completion is not attained before 7/31/22 12/31/222 Liquidated Damages in the amount of $1000.00 per day will be imposed. If HCI fails to attain Substantial Completion the Final Completion Date shall be reset to the ninetieth (90th) day sixty days after the date of actual Substantial Completion and Liquidated Damaged will be imposed at $500.00 per day. QUALIFICATIONS, CLARIFICATIONS AND EXCLUSIONS
1. Any Building Official requirements not specifically included in this proposal are excluded.
2. Only work described in the above scope of work is included in this project.
3. All costs associated with the removal of hazardous materials, if encountered, is excluded.
4. A&E Fees are excluded 5. Installation of any silt fence around the property as none was specified. Silt fence will be installed around both existing concrete inlets only.
Appears in 1 contract
Samples: Guaranteed Maximum Price Agreement