Common use of Contractor Drawings and Manuals Clause in Contracts

Contractor Drawings and Manuals. ‌ (a) Seller shall at all times keep a copy of the most recent version of the Contractor Drawings and Manuals at Seller’s office on the Site to be made available for Buyer’s review. In addition, Seller shall provide and make available to Buyer electronic versions of the Contractor Drawings and Manuals accessible by Buyer through a file transfer protocol site to be maintained by Seller. (b) Seller shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification and when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings and Manual shall be maintained and be available, with up-to-date drawings, specifications and design sheets, for the training as set forth in Section 7.11 (“Training”).‌ (c) Seller shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer for its review at least one (1) year prior to the Guaranteed Substantial Completion Date. (d) At least sixty (60) days prior to the Guaranteed Substantial Completion Date, Seller shall provide Buyer with initial drafts of the final Contractor Drawings and Manuals for review (the “Draft Manuals”). The Draft Manuals shall contain such information described in Section 7.10(b), other than the drawings which, in accordance with this Section 7.10, are being maintained so as to be up-to-date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer at least sixty (60) days prior to Substantial Completion and shall be a condition of Substantial Completion. (e) Seller shall provide to Buyer both hard and electronic final copies of the Contractor Drawings and Manuals. Seller shall provide to Buyer five (5) final hard copies of the Contractor Drawings and Manuals within sixty (60) days after achievement of Substantial Completion. Buyer shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so delivered. (f) Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 3 contracts

Samples: Asset Purchase and Sale Agreement, Asset Purchase and Sale Agreement, Asset Purchase and Sale Agreement

AutoNDA by SimpleDocs

Contractor Drawings and Manuals. ‌ (a) Seller Developer shall at all times keep a copy of the most recent version of the Contractor Drawings and Manuals at SellerDeveloper’s office on the Site to be made available for BuyerPacifiCorp’s review. In addition, Seller Developer shall provide and make available to Buyer PacifiCorp electronic versions of the Contractor Drawings and Manuals accessible by Buyer PacifiCorp through a file transfer protocol site to be maintained by Seller. (b) Seller Developer. Developer shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer PacifiCorp such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. as otherwise set forth in Appendix F and Appendix G. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification Technical Specification, Appendix F and Appendix G and when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings and Manual Manuals shall be maintained and be available, with up-to-date drawings, specifications and design sheets, for the training of PacifiCorp’s personnel as set forth in Section 7.11 (“Training”).‌ (c) Seller 7.10. Developer shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer PacifiCorp for its review at least one (1) year prior to the Guaranteed Substantial Completion Date. (d) . At least sixty (60) days prior to the expected Guaranteed Substantial Completion Date, Seller Developer shall provide Buyer PacifiCorp with initial drafts of the final Contractor Drawings and Manuals for review (the “Draft Manuals”). The Draft Manuals shall contain such information described in Section 7.10(b7.9(b), other than the drawings which, in accordance with this Section 7.107.9, are being maintained so as to be up-to-date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer PacifiCorp at least sixty (60) days prior to Substantial Completion and shall be a condition to the achievement of Substantial Completion. (e) Seller . Developer shall provide to Buyer PacifiCorp both hard and electronic final copies of the Contractor Drawings and Manuals. Seller Developer shall provide to Buyer PacifiCorp five (5) final hard copies of the Contractor Drawings and Manuals within sixty (60) days after achievement of Substantial Completion. Buyer PacifiCorp shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so delivered. (f) . Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 1 contract

Samples: Transfer Agreement

Contractor Drawings and Manuals. (a) Seller Following receipt and approval of the Project Schedule, Contractor shall at all times keep prepare a Contract documentation and drawing list identifying those key data, calculations (as required for regulatory purposes and any Governmental Approvals or third party consents), drawings, technical specifications and concepts required for review for conformance with this Contract and shall provide a copy of the most recent version such list to Company within ninety (90) days after receipt and approval of the Contractor Drawings and Manuals at Seller’s office on the Site Project Schedule pursuant to be made available for Buyer’s review. In addition, Seller shall provide and make available to Buyer electronic versions of the Contractor Drawings and Manuals accessible by Buyer through a file transfer protocol site to be maintained by SellerArticle 10. (b) Seller Contractor shall, within the time detailed in the Project Schedule or elsewhere in this Contract, submit Contractor Drawings and Manuals to Company’s Representative in hard copy and electronic form (the specific form of which shall be agreed to by the Parties). (c) Contractor shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer Company such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification and Specifications; (ii) when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings ; and Manual shall be (iii) maintained and be available, with up-to-date drawings, specifications and design sheets, for the training as set forth in Section 7.11 (“Training”).‌ (c) Seller shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer for its review at least one (1) year prior to the Guaranteed Substantial Completion DateTraining. (d) At least sixty (60) days prior to the Guaranteed Substantial Completion Date, Seller Contractor shall provide Buyer with initial drafts supply additional copies of the final Contractor Drawings and Manuals for review (including calculations) in the “Draft Manuals”form and numbers stated in this Contract. Without waiver of or prejudice to any rights of Company, Contractor shall bear all risk in relation to its performance of Work arising from or in relation to all Contractor Drawings and Manuals (including calculations). The Draft Manuals shall contain such information described in Section 7.10(b), other than the drawings which, in accordance with this Section 7.10, are being maintained so as to be up-to-date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer at least sixty (60) days prior to Substantial Completion and shall be a condition of Substantial Completion. (e) Seller Contractor shall provide to Buyer both hard and electronic final copies at all times keep a copy of the Contractor Drawings and Manuals. Seller shall provide to Buyer five (5) final hard copies most recent version of the Contractor Drawings and Manuals within sixty (60) days after achievement at Contractor’s office on the Site to be made available for Company’s review. In addition, Contractor shall provide and make available to Company electronic versions of Substantial Completion. Buyer shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so deliveredaccessible by Company through a file transfer protocol site to be maintained by Contractor. (f) Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 1 contract

Samples: Engineering, Procurement and Construction Contract (Chugach Electric Association Inc)

Contractor Drawings and Manuals. (a) Seller Contractor shall at all times keep a copy of the most recent version of the Contractor Drawings and Manuals at SellerContractor’s office on the Site to be made available for BuyerCompany’s review. In addition, Seller Contractor shall provide and make available to Buyer Company electronic versions of the Contractor Drawings and Manuals accessible by Buyer Company through a file transfer protocol site to be maintained by SellerContractor. (b) Seller Contractor shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer Company such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification and when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings and Manual shall be maintained and be available, with up-to-date drawings, specifications and design sheets, for the training as set forth in Section 7.11 (“Training”).‌Training”). (c) Seller Contractor shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer Company for its review at least one (1) year prior to the Guaranteed Substantial Completion Date. (d) At least sixty (60) days prior to the Guaranteed Substantial Completion Date, Seller Contractor shall provide Buyer Company with initial drafts of the final Contractor Drawings and Manuals for review (the “Draft Manuals”). The Draft Manuals shall contain such information described in Section 7.10(b), other than the drawings which, in accordance with this Section 7.10, are being maintained so as to be up-to-date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer Company at least sixty (60) days prior to Substantial Completion and shall be a condition of Substantial Completion. (e) Seller Contractor shall provide to Buyer Company both hard and electronic final copies of the Contractor Drawings and Manuals. Seller Contractor shall provide to Buyer Company five (5) final hard copies of the Contractor Drawings and Manuals within sixty (60) days after achievement of Substantial Completion. Buyer Company shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so delivered. (f) Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 1 contract

Samples: Engineering, Procurement and Construction Contract

Contractor Drawings and Manuals. (a) Seller Following receipt and approval of the Project Schedule, Contractor shall at all times keep prepare a Contract documentation and drawing list identifying those key data, calculations (as required for regulatory purposes and any Governmental Approvals or third party consents), drawings, technical specifications and concepts required for review for conformance with this Contract and shall provide a copy of the most recent version such list to Company within ninety (90) days after receipt and approval of the Contractor Drawings and Manuals at Seller’s office on the Site Project Schedule pursuant to be made available for Buyer’s review. In addition, Seller shall provide and make available to Buyer electronic versions of the Contractor Drawings and Manuals accessible by Buyer through a file transfer protocol site to be maintained by SellerArticle 10. (b) Seller Contractor shall, within the time detailed in the Project Schedule or elsewhere in this Contract, submit Contractor Drawings and Manuals to Company’s Representative in hard copy and electronic form (the specific form of which shall be agreed to by the Parties). (c) Contractor shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer Company such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification and Specifications; (ii) when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings ; and Manual shall be (iii) maintained and be available, with up-to-date drawings, specifications and design sheets, for the training as set forth in Section 7.11 (“Training”).‌ (c) Seller shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer for its review at least one (1) year prior to the Guaranteed Substantial Completion DateTraining. (d) At least sixty (60) days prior to the Guaranteed Substantial Completion Date, Seller Contractor shall provide Buyer with initial drafts supply additional copies of the final Contractor Drawings and Manuals for review (including calculations) in the “Draft Manuals”form and numbers stated in this Contract. Without waiver of or prejudice to any rights of Company, Contractor shall bear all risk in relation to its performance of Work arising from or in relation to all Contractor Drawings and Manuals (including calculations). The Draft Manuals shall contain such information described in Section 7.10(b), other than the drawings which, in accordance with this Section 7.10, are being maintained so as to be up-to-date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer at least sixty (60) days prior to Substantial Completion and shall be a condition of Substantial Completion. (e) Seller Contractor shall provide to Buyer both hard and electronic final copies at all times keep a copy of the Contractor Drawings and Manuals. Seller shall provide to Buyer five (5) final hard copies most recent version of the Contractor Drawings and Manuals within sixty (60) days after achievement at Contractor’s office on the Site to be made available 40 for Company’s review. In addition, Contractor shall provide and make available to Company electronic versions of Substantial Completion. Buyer shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so deliveredaccessible by Company through a file transfer protocol site to be maintained by Contractor. (f) Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 1 contract

Samples: Engineering, Procurement and Construction Contract (Chugach Electric Association Inc)

AutoNDA by SimpleDocs

Contractor Drawings and Manuals. ‌ (a) Seller shall at all times keep a copy of the most recent version of the Contractor Drawings and Manuals at Seller’s office on the Site to be made available for Buyer’s review. In addition, Seller shall provide and make available to Buyer electronic versions of the Contractor Drawings and Manuals accessible by Buyer through a file transfer protocol site to be maintained by Seller. (b) Seller shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification and when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings and Manual shall be maintained and be available, with up-to-date drawings, specifications and design sheets, for the training as set forth in Section 7.11 7.10 (“Training”).‌ (c) Seller shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer for its review at least one (1) year prior to the Guaranteed Substantial Completion Date. (d) At least sixty (60) days prior to the Guaranteed Substantial Completion Date, Seller shall provide Buyer with initial drafts of the final Contractor Drawings and Manuals for review (the “Draft Manuals”). The Draft Manuals shall contain such information described in Section 7.10(b7.9(b), other than the drawings which, in accordance with this Section 7.107.9, are being maintained so as to be up-to-to- date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer at least sixty (60) days prior to Substantial Completion and shall be a condition of Substantial Completion. (e) Seller shall provide to Buyer both hard and electronic final copies of the Contractor Drawings and Manuals. Seller shall provide to Buyer five (5) final hard copies of the Contractor Drawings and Manuals within sixty (60) days after achievement of Substantial Completion. Buyer shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so delivered. (f) Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 1 contract

Samples: Asset Purchase and Sale Agreement

Contractor Drawings and Manuals. (a) Seller shall at all times keep a copy of the most recent version of the Contractor Drawings and Manuals at Seller’s office on the Site to be made available for Buyer’s review. In addition, Seller shall provide and make available to Buyer electronic versions of the Contractor Drawings and Manuals accessible by Buyer through a file transfer protocol site to be maintained by Seller. (b) Seller shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification and when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings and Manual shall be maintained and be available, with up-to-date drawings, specifications and design sheets, for the training as set forth in Section 7.11 (“Training”).‌ (c) Seller shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer for its review at least one (1) year prior to the Guaranteed Substantial Completion Date. (d) At least sixty (60) days prior to the Guaranteed Substantial Completion Date, Seller shall provide Buyer with initial drafts of the final Contractor Drawings and Manuals for review (the “Draft Manuals”). The Draft Manuals shall contain such information described in Section 7.10(b), other than the drawings which, in accordance with this Section 7.10, are being maintained so as to be up-to-date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer at least sixty (60) days prior to Substantial Completion and shall be a condition of Substantial Completion. (e) Seller shall provide to Buyer both hard and electronic final copies of the Contractor Drawings and Manuals. Seller shall provide to Buyer five (5) final hard copies of the Contractor Drawings and Manuals within sixty (60) days after achievement of Substantial Completion. Buyer shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so delivered. (f) Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 1 contract

Samples: Asset Purchase Agreement

Contractor Drawings and Manuals. (a) Seller shall at all times keep a copy of the most recent version of the Contractor Drawings and Manuals at Seller’s office on the Site to be made available for Buyer’s review. In addition, Seller shall provide and make available to Buyer electronic versions of the Contractor Drawings and Manuals accessible by Buyer through a file transfer protocol site to be maintained by Seller. (b) Seller shall cause to be set forth in the Contractor Drawings and Manuals provided to Buyer such information as is required to operate and maintain the Work, including to the extent applicable, recommended operating and maintenance procedures, system descriptions, product catalogs, drawings, design sheets, specifications, logic diagrams, maintenance and instruction sections, spare parts lists, any vendor-supplied training documents, and current heat balances. The Contractor Drawings and Manuals shall be (i) prepared in accordance with the Specification and when completed, shall be in sufficient detail to accurately represent the Project as constructed. The Contractor Drawings and Manual shall be maintained and be available, with up-to-date drawings, specifications and design sheets, for the training as set forth in Section 7.11 (“Training”).‌Training”). (c) Seller shall prepare initial system descriptions, design basis documents, and operational guidelines for the Project and deliver such to Buyer for its review at least one (1) year prior to the Guaranteed Substantial Completion Date. (d) At least sixty (60) days prior to the Guaranteed Substantial Completion Date, Seller shall provide Buyer with initial drafts of the final Contractor Drawings and Manuals for review (the “Draft Manuals”). The Draft Manuals shall contain such information described in Section 7.10(b), other than the drawings which, in accordance with this Section 7.10, are being maintained so as to be up-to-date. Two (2) complete sets of the Draft Manuals shall be provided to Buyer at least sixty (60) days prior to Substantial Completion and shall be a condition of Substantial Completion. (e) Seller shall provide to Buyer both hard and electronic final copies of the Contractor Drawings and Manuals. Seller shall provide to Buyer five (5) final hard copies of the Contractor Drawings and Manuals within sixty (60) days after achievement of Substantial Completion. Buyer shall not be required to deliver the Notice of Final Acceptance until all such Contractor Drawings and Manuals have been so delivered. (f) Any modifications to the Contractor Drawings and Manuals made necessary as a consequence of any Final Punch List items or modifications to the Work shall be issued as addenda to the Contractor Drawings and Manuals within sixty (60) days following completion thereof.

Appears in 1 contract

Samples: Asset Purchase Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!