CONTROL SETUP Sample Clauses

CONTROL SETUP. This section will be used to verify the configuration of the sterilizer. Enter the service mode and get into Alar m / Maintenance men u. Select CO NFIGURE ▇▇▇ ▇▇▇▇, then select SET CO NFIGURATIO N. Verify the size, door, and type are correct. The se- lected configuration will be lit up on the display. Once completed, press CONTINUE an d select if the unit does or does not have an integral steam generator. Pressing CONTINUE will show any optional hard- ware that may be present on the unit. Press CON- TINUE and input the correct serial number of the sterilizer. The CPU, I / O, interface, and printer boards contain various jumper pins and dip switches. Refer to the Control section of this manual for proper settings of these components.

Related to CONTROL SETUP

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract. (b) Records of all quality control inspection work by SELLER shall be kept complete and available to LOCKHEED ▇▇▇▇▇▇ and its customers.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Data Integrity Control Personal Data will remain intact, complete and current during processing activities.

  • Data Input Control It will be possible to retrospectively examine and establish whether and by whom Personal Data have been entered, modified or removed from SAP data processing systems.

  • Access Controls a. Authorized Access - DST shall have controls that are designed to maintain the logical separation such that access to systems hosting Fund Data and/or being used to provide services to Fund will uniquely identify each individual requiring access, grant access only to authorized personnel based on the principle of least privileges, and prevent unauthorized access to Fund Data. b. User Access - DST shall have a process to promptly disable access to Fund Data by any DST personnel who no longer requires such access. DST will also promptly remove access of Fund personnel upon receipt of notification from Fund.