Cost of the recall Sample Clauses

Cost of the recall. If the cause of the recall is because the Product does not conform to the Product Specification, and it is as a result of a breach of warranty or negligence by Mayne Pharma, then Mayne Pharma must, at its expense, reimburse to HPPI for all its reasonable costs and expenses of any recall and the costs of any independent analyst engaged under clause 11.5. Otherwise, all costs and expenses in respect of the recall and the independent analyst are payable by HPPI.
AutoNDA by SimpleDocs

Related to Cost of the recall

  • Cost of the Work The sum of all allowable costs necessarily incurred and paid by Contractor in the proper performance of the Work.

  • Cost of Repairs 54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts or omissions.

  • Downtime There may be downtime during the Migration. The duration of the downtime will depend on the amount of data that Agency is migrating. Axon will work with Agency to minimize any downtime. Any VIEVU mobile application will need to be disabled upon Migration.

  • Cost of Bidding 6.1 The bidder shall bear all costs associated with the preparation and submission of his Bid, and the Employer will in no case be responsible and liable for those costs.

  • MAINTENANCE, REPAIRS, OR ALTERATIONS The Tenant shall, at their own expense and at all times, maintain premises in a clean and sanitary manner, and shall surrender the same at termination hereof, in as good condition as received, normal wear and tear excepted. The Tenant may not make any alterations to the leased premises without the consent in writing of the Landlord. The Landlord shall be responsible for repairs to the interior and exterior of the building. If the Premises includes a washer, dryer, freezer, dehumidifier unit and/or air conditioning unit, the Landlord makes no warranty as to the repair or replacement of units if one or all shall fail to operate. The Landlord will place fresh batteries in all battery-operated smoke detectors when the Tenant moves into the premises. After the initial placement of the fresh batteries it is the responsibility of the Tenant to replace batteries when needed. A monthly "cursory" inspection may be required for all fire extinguishers to make sure they are fully charged.

  • Line Outage Costs Notwithstanding anything in the NYISO OATT to the contrary, the Connecting Transmission Owner may propose to recover line outage costs associated with the installation of Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades on a case-by-case basis.

  • RESERVE PRICE AND BIDDING AT AUCTION CONDITIONS OF SALE 1.1 This sale is made by AmBank (M) Berhad [196901000166 (8515-D)][formerly known as AmFinance Berhad](“Assignee/Bank”) in exercise of the rights and powers conferred upon the Assignee/Bank pursuant to the Facility Agreement, Deed Of Assignment and Power Of Attorney all dated the 19th October, 2017 executed by Todi Ashish (Assignor/Borrower”) in favour of the Assignee/Bank subject to all conditions and category of land use, express or implied or imposed upon or relating to or affecting the property (“Property”) and shall further subject to the reserve price (“Reserve Price”) and the Conditions of Sale as appearing in the Proclamation of Sale. 1.2 Subject to the provisions of Clause 5 below the highest bidder for the Property described in the Proclamation of Sale if so allowed by the Auctioneer shall be the Purchaser (“Purchaser”) thereof and the Auctioneer shall have the right to reject any bid. If any dispute shall arise as to any bidding, the Property shall be at the option of the Auctioneer be put up again for sale at the last undisputed bid or the Auctioneer may decide on the dispute and the decision of the Auctioneer on all matters not provided for in this Conditions of Sale shall be final and binding in all respects if such decision is made during the course of conducting the auction on the auction date. 1.3 No bid shall be less than the previous bid and each bid shall be increased by a minimum amount to be determined by the Auctioneer at the time the Property is put up for sale and no bidding shall be withdrawn or retracted. Should there be any withdrawal or retraction from the registered bidder(s) or the highest bidder before or after the fall of the hammer, the bidding deposit (“Bidding Deposit”) shall be forfeited to the Assignee/Bank and the Property shall be at the option of the Auctioneer be put up for sale again or the Auctioneer may decide to adjourn the auction sale to another date. 1.4 In the event the subject matter offered for auction comprises more than one (1) property, the Auctioneer shall have the right to: - (a) determine or vary the order of sale; (b) offer the properties for sale either individually or en bloc or in any combination/manner as determined by the Auctioneer; and/or (c) withdraw any of the properties from the sale.

  • Planned Outages Seller shall schedule Planned Outages for the Project in accordance with Good Industry Practices and with the prior written consent of Buyer, which consent may not be unreasonably withheld or conditioned. The Parties acknowledge that in all circumstances, Good Industry Practices shall dictate when Planned Outages should occur. Seller shall notify Buyer of its proposed Planned Outage schedule for the Project for the following calendar year by submitting a written Planned Outage schedule no later than October 1st of each year during the Delivery Term. The Planned Outage schedule is subject to Buyer’s approval, which approval may not be unreasonably withheld or conditioned. Buyer shall promptly respond with its approval or with reasonable modifications to the Planned Outage schedule and Seller shall use its best efforts in accordance with Good Industry Practices to accommodate Xxxxx’s requested modifications. Notwithstanding the submission of the Planned Outage schedule described above, Seller shall also submit a completed Outage Notification Form to Buyer no later than fourteen (14) days prior to each Planned Outage and all appropriate outage information or requests to the CAISO in accordance with the CAISO Tariff. Seller shall contact Buyer with any requested changes to the Planned Outage schedule if Seller believes the Project must be shut down to conduct maintenance that cannot be delayed until the next scheduled Planned Outage consistent with Good Industry Practices. Seller shall not change its Planned Outage schedule without Buyer’s approval, not to be unreasonably withheld or conditioned. Seller shall use its best efforts in accordance with Good Industry Practices not to schedule Planned Outages during the months of July, August, September and October. At Buyer’s request, Seller shall use commercially reasonable efforts to reschedule Planned Outage so that it may deliver Product during CAISO declared or threatened emergency periods. Seller shall not substitute Energy from any other source for the output of the Project during a Planned Outage.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • SCOPE OF THE WORK The Contractor shall furnish all the materials, perform all of the Work, and do all things required by the Contract Documents.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!