Current Output Sample Clauses

Current Output. The current Output option is identical to the “pressure Xmtr” mode, with exception of the output setting (as set in the next step:” Current output Settings”). Output setting will not be in pressure units, but in mA with fixed mA steps to go from minimum to maximum. Current output will switch on / off in this menu.
AutoNDA by SimpleDocs

Related to Current Output

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • Flexible Working Arrangements In accordance with the Employment Relations Act 2000, an employee affected by family violence may request a short-term (two months or less) variation of their employment arrangements to assist the employee to deal with the effects of family violence.

  • Unbundled Copper Loop Designed (UCL-D)

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Working Arrangements As part of a process leading to improvements, it is recognised that hot weather procedures including relocation, must be part of the formal OH&S procedures developed, adopted and managed on a project basis having regard for the different conditions that may prevail on projects in various locations. When the temperature approaches 35 degrees C, the consultative process outlined in sub-clause 24.1.4 of the VBIA shall occur, with an intention that employees may leave site if the temperature actually reaches 35 degrees C. If the temperature reaches 35 degrees C, the task or activity being performed will be completed before work is to cease and the penalty provisions as for emergency work under the NBCIA shall apply. By agreement with the OH&S committee and head contractor during periods of inclement weather (heat) the Saturday break roster can be applied for weekday work.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

Time is Money Join Law Insider Premium to draft better contracts faster.