Common use of Daily Forecast of Available Capacity Clause in Contracts

Daily Forecast of Available Capacity. During the Test Period and thereafter during the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VI, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to the PMax of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday – Preschedule Day for Tuesday (2) Tuesday – Preschedule Day for Wednesday (3) Wednesday – Preschedule Day for Thursday (4) Thursday – Preschedule Day for Friday and Saturday (5) Friday – Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Ahead Market then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VI. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer to the extent Seller’s failure contributes to Imbalance Energy, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c).

Appears in 7 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

Daily Forecast of Available Capacity. During the Test Period and thereafter during the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VI, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to the PMax of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday – Preschedule Day for Tuesday (2) Tuesday – Preschedule Day for Wednesday (3) Wednesday – Preschedule Day for Thursday (4) Thursday – Preschedule Day for Friday and Saturday (5) Friday – Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Ahead Market then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VI. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer to the extent Seller’s failure contributes to Imbalance Energy, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c4.6(c).

Appears in 7 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

Daily Forecast of Available Capacity. During the Test Period and thereafter during the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VI, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to the PMax of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday - Preschedule Day for Tuesday (2) Tuesday - Preschedule Day for Wednesday (3) Wednesday - Preschedule Day for Thursday (4) Thursday - Preschedule Day for Friday and Saturday (5) Friday - Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules schedules into the Day-Ahead Market Market, then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VI. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. Day-Ahead Desk Primary Telephone: (000) 000-0000 Backup Telephone: (000) 000-0000 If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, (I) until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer and Seller and (II) to the extent Seller’s failure contributes to Imbalance Energy, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c4.5(c)(ii).

Appears in 4 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

Daily Forecast of Available Capacity. During the Test Period and thereafter during the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VIVIII, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater [The following bracketed language applies to Baseload Product only] [The capacity forecasted in the PMax Day-Ahead Availability Notice will be the scheduled output of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. .] The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday – Preschedule Day for Tuesday (2) Tuesday – Preschedule Day for Wednesday (3) Wednesday – Preschedule Day for Thursday (4) Thursday – Preschedule Day for Friday and Saturday (5) Friday – Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Ahead Market then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VIVIII. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer [The following bracketed language applies to As-Available Product only] [ and to the extent Seller’s failure contributes to Imbalance Energy, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c4.5(c)(iii)].

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

Daily Forecast of Available Capacity. During the Test Period and thereafter during each month of the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VI, for each day email no later than fourteen fifteen (1415) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to For Baseload Product, the PMax capacity forecasted in the Day-Ahead Availability Notice will be the scheduled output of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday - Preschedule Day for Tuesday (2) Tuesday - Preschedule Day for Wednesday (3) Wednesday - Preschedule Day for Thursday (4) Thursday - Preschedule Day for Friday and Saturday (5) Friday - Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Day- Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW (AC) as of a time that is less more than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Ahead Market Schedules, then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VIemail. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MWMW (AC), and any other necessary information. Day-Ahead Preschedule Desk Primary Telephone: (000) 000-0000 Backup Telephone: (000) 000-0000 If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, (I) until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer to the extent Seller’s failure contributes to Imbalance Energy, and Seller shall and (II) Seller may be subject to the Forecasting Penalties set forth penalties and charges as provided in Section 4.5(c)this Agreement.

Appears in 1 contract

Samples: Power Purchase Agreement

Daily Forecast of Available Capacity. During the Test Period and thereafter during each month of the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VI, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to For Baseload Product, the PMax capacity forecasted in the Day-Ahead Availability Notice will be the scheduled output of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday - Preschedule Day for Tuesday (2) Tuesday - Preschedule Day for Wednesday (3) Wednesday - Preschedule Day for Thursday (4) Thursday - Preschedule Day for Friday and Saturday (5) Friday - Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less more than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Ahead Market Schedules, then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VI. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. Day-Ahead Trading Desk Primary Telephone: (000) 000-0000 Backup Telephone: (000) 000-0000 If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, (I) until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer and Seller and (II) to the extent Seller’s failure contributes to Imbalance Energyan imbalance charge, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c4.6(c)(iii).

Appears in 1 contract

Samples: Power Purchase Agreement

Daily Forecast of Available Capacity. During the Test Period and thereafter during the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet siteat insert information here, as provided in Appendix VI, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to the PMax of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday – Preschedule Day for Tuesday (2) Tuesday – Preschedule Day for Wednesday (3) Wednesday – Preschedule Day for Thursday (4) Thursday – Preschedule Day for Friday and Saturday (5) Friday – Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Ahead Market then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site insert information here as set forth in Appendix VI. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. If Seller fails to provide Buyer the Third-Party SC with a Day-Ahead Availability Notice as required herein, then, until Seller provides a Day-Ahead Availability Notice, Buyer the Third-Party SC may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer Third-Party SC to the extent Seller’s failure contributes to Imbalance Energy, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c).

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs

Daily Forecast of Available Capacity. During the Test Period and thereafter during the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet siteat Group-Corp- XxxxxxxXxxxx@xxxxxx.xxx , as provided in Appendix VIIV, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to the PMax of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday – Preschedule Day for Tuesday (2) Tuesday – Preschedule Day for Wednesday (3) Wednesday – Preschedule Day for Thursday (4) Thursday – Preschedule Day for Friday and Saturday (5) Friday – Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Day- Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Ahead Market then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site Xxxxx-Xxxx-XxxxxxxXxxxx@xxxxxx.xxx as set forth in Appendix VIIV. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. If Seller fails to provide Buyer the Third-Party SC with a Day-Ahead Availability Notice as required herein, then, until Seller provides a Day-Ahead Availability Notice, Buyer the Third-Party SC may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer Third-Party SC to the extent Seller’s failure contributes to Imbalance Energy, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c4.6(c).

Appears in 1 contract

Samples: Power Purchase Agreement

Daily Forecast of Available Capacity. During the Test Period and thereafter during each month of the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead Day-Ahead forecast of Available Capacity (the “Day-Day- Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VI, for each day email no later than fourteen fifteen (1415) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater to [For Baseload Product,] the PMax capacity forecasted in the Day-Ahead Availability Notice will be the scheduled output of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday - Preschedule Day for Tuesday (2) Tuesday - Preschedule Day for Wednesday (3) Wednesday - Preschedule Day for Thursday (4) Thursday - Preschedule Day for Friday and Saturday (5) Friday - Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW (AC) as of a time that is less more than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules into the Day-Day- Ahead Market Schedules, then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VIemail. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MWMW (AC), and any other necessary information. Day-Ahead Preschedule Desk Primary Telephone: (000) 000-0000 Backup Telephone: (000) 000-0000 If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, , (I) until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer to the extent Seller’s failure contributes to Imbalance Energy, and Seller shall and (II) Seller may be subject to the Forecasting Penalties set forth penalties and charges as provided in Section 4.5(c)this Agreement.

Appears in 1 contract

Samples: Power Purchase Agreement

Daily Forecast of Available Capacity. During the Test Period and thereafter during the Delivery Term, Seller or Seller’s agent shall provide a binding day ahead forecast of Available Capacity (the “Day-Ahead Availability Notice”) to Buyer or Third-Party SC (as applicable) via Buyer’s internet site, as provided in Appendix VIVIII, for each day no later than fourteen (14) hours before the beginning of the “Preschedule Day” (as defined by the WECC) for such day. Any reduction of one (1) MW or greater [The following bracketed language applies to Baseload Product only] [The capacity forecasted in the PMax Day-Ahead Availability Notice will be the scheduled output of the Project, as set forth in Section F of the Cover Sheet, must be reported as an outage pursuant to Appendix VI. .] The current industry standard Preschedule Day timetable in the WECC is as follows: (1) Monday – Preschedule Day for Tuesday (2) Tuesday – Preschedule Day for Wednesday (3) Wednesday – Preschedule Day for Thursday (4) Thursday – Preschedule Day for Friday and Saturday (5) Friday – Preschedule Day for Sunday and Monday Exceptions to this standard Monday through Friday Preschedule Day timetable are presently set forth by the WECC in order to accommodate holidays, monthly transitions and other events. Exceptions are posted on the WECC website (xxx.xxxx.xxx) under the document title, “Preschedule Calendar.” Each Day-Ahead Availability Notice shall clearly identify, for each hour, Seller’s forecast of all amounts of Available Capacity pursuant to this Agreement. If the Available Capacity changes by at least one (1) MW as of a time that is less than fourteen (14) hours prior to the Preschedule Day but prior to the CAISO deadline for submittal of Schedules schedules into the Day-Ahead Market then Seller must notify Buyer of such change by telephone and shall send a revised notice to Buyer’s Internet site set forth in Appendix VIVIII. Such Notices shall contain information regarding the beginning date and time of the event resulting in the change in Available Capacity, the expected end date and time of such event, the expected Available Capacity in MW, and any other necessary information. Day-Ahead Desk Primary Telephone: (000) 000-0000 Backup Telephone: (000) 000-0000 If Seller fails to provide Buyer with a Day-Ahead Availability Notice as required herein, then, [(I)] until Seller provides a Day-Ahead Availability Notice, Buyer may rely on the most recent Day-Ahead Forecast of Available Capacity submitted by Seller to Buyer and Seller[ and (II) to the extent Seller’s failure contributes to Imbalance Energy, Seller shall be subject to the Forecasting Penalties set forth in Section 4.5(c4.5(c)(iii).]. [The bracketed language applies to As-Available Product only]

Appears in 1 contract

Samples: Power Purchase Agreement