DC POWER TO RADIO EQUIPMENT Sample Clauses

DC POWER TO RADIO EQUIPMENT. Provided by at least one (1) each 12 Volt power supply with an automatic backup switch or relay and have a minimum capacity of 35 Amps.
AutoNDA by SimpleDocs

Related to DC POWER TO RADIO EQUIPMENT

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Furniture, Fixtures and Equipment Sublessee shall have the right to use during the Term the office furnishings and equipment within the Subleased Premises that are identified on Exhibit C attached hereto, as such exhibit may be adjusted by mutual agreement of the parties prior to the Third Floor Premises Delivery Date (the “Furniture”), provided Sublessee may only use the Furniture located in the Second Floor Premises after the Second Floor Commencement Date. The Furniture is provided in its “AS IS, WHERE IS” condition, without representation or warranty whatsoever. Sublessee shall insure the Furniture under the property insurance policy required under the Master Lease, as incorporated herein, and pay all taxes with respect to the Furniture. Sublessee shall maintain the Furniture in good condition and repair, reasonable wear and tear excepted, and shall be responsible for any loss or damage to the same occurring during the Term. Sublessee shall surrender the Furniture to Sublessor upon the termination of this Sublease in the same condition as exists as of the applicable Delivery Date, reasonable wear and tear excepted. Sublessee shall not remove any of the Furniture from the Subleased Premises. Notwithstanding anything to the contrary herein, Sublessee may provide Sublessor with written notice one (1) time not less than forty-five (45) days prior to the Third Floor Premises Delivery Date that lists any items of Furniture that Sublessee does not want to use and Sublessor shall, at no cost to Sublessee, remove such items from the Subleased Premises prior to the Third Floor Premises Delivery Date and such items shall no longer be considered Furniture hereunder. Notwithstanding the foregoing, provided Sublessee is not in default beyond the expiration of any applicable cure or grace period as of the date of the expiration or earlier termination of this Sublease, which condition may be waived by Sublessor in its sole discretion, then upon the expiration or earlier termination of this Sublease, the Furniture shall become the property of Sublessee, and Sublessee shall accept the same in its “AS IS, WHERE IS” condition, without representation or warranty whatsoever except as provided in the Bill of Sale referred to in the following sentence. In the event the Furniture is to become the property of Sublessee upon the expiration or earlier termination of this Sublease pursuant to the terms of the immediately preceding sentence, then Sublessor agrees to execute and deliver to Sublessee a Bill of Sale in the form of Exhibit D attached hereto conveying and transferring to Sublessee the Furniture.

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Safe Equipment The City shall furnish and maintain in the best possible working condition, within the limits of its financial capability, the necessary tools, facilities, vehicles, supplies, and equipment required for members to safely carry out their duties. Members are responsible for reporting unsafe conditions or practices, for avoiding negligence, and for properly using and caring for tools, facilities, vehicles, supplies, and equipment provided by the City.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Certain Requirements as to Furniture, Equipment and Fixtures If the Assuming Institution purchases owned Bank Premises or accepts an assignment of the lease (or enters into a sublease or a new lease in lieu thereof) for leased Bank Premises as provided in Section 4.6(a) or 4.6(b), or if the Assuming Institution does not exercise such option but within twelve (12) months following Bank Closing obtains the right to occupy such premises (whether by assignment, lease, sublease, purchase or otherwise), other than in accordance with Section 4.6(a) or (b), the Assuming Institution shall (i) effective as of the date of Bank Closing, purchase from the Receiver all Furniture and Equipment and Fixtures owned by the Failed Bank at Fair Market Value and located thereon as of Bank Closing, (ii) accept an assignment or a sublease of the leases or negotiate new leases for all Furniture and Equipment and Fixtures leased by the Failed Bank and located thereon, and (iii) if applicable, accept an assignment or a sublease of any ground lease or negotiate a new ground lease with respect to any land on which such Bank Premises are located; provided, that the Receiver shall not have disposed of such Furniture and Equipment and Fixtures or repudiated the leases specified in clause (ii) or (iii).

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

Time is Money Join Law Insider Premium to draft better contracts faster.