Design and Construction Fees. 5.4.1 – Phase 1 Architectural Design Fee The Architect shall be paid on a Time-and-Material basis with a Not-To-Exceed fee of $ . A breakdown of the fee is included as Attachment C.
Appears in 2 contracts
Samples: www.grr.org, www.grr.org
Design and Construction Fees. 5.4.1 – Phase 1 Architectural Engineer Design Fee The Architect Engineer shall be paid on a Time-and-Material basis with a Not-To-Exceed fee of $ . A breakdown of the fee is included as Attachment C.
Appears in 2 contracts
Samples: www.grr.org, www.grr.org