Design and Construction of CB4 Transmission Sample Clauses

Design and Construction of CB4 Transmission. The Owners recognize and agree that, to achieve maximum time and cost efficiencies, MidAmerican, as Agent, shall be given full and complete authority in all matters affecting the development, design, procurement, construction, operation, maintenance, repair, replacement and ultimate retirement of CB4 Transmission. Accordingly, each Owner, to the extent of its respective interest as specified in Article III, confers upon Agent, and its successors and assigns, the authority to act as its agent in achieving the purposes of this Agreement as provided herein. It is recognized that the completion of CB4 Transmission may be affected by matters beyond the control or contemplation of the Owners, and Agent shall have the sole discretion to extend the completion date should circumstances, other than Agent’s transmission resource needs, reasonably dictate. Agent will keep the Owners informed of progress of the work. It is understood, however, that Agent shall have exclusive authority to make final decisions on all matters relating to the design and construction of CB4 Transmission, as well as the selection and purchase of all materials and equipment which are to be incorporated into CB4 Transmission. Agent agrees to cause the construction of CB4 Transmission to be performed in accordance with Good Utility Practice, this Agreement and applicable law. Agent shall have the exclusive right and authority to contract for materials and services necessary for the development, planning, design, engineering, procurement, construction, operation, maintenance, repair, replacement and retirement of CB4 Transmission. The Owners shall recognize and treat CB4 Transmission as grid transmission for all purposes.
AutoNDA by SimpleDocs

Related to Design and Construction of CB4 Transmission

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Completion of Construction (a) For the purposes of this Agreement, the terms "

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Commencement and Completion of Construction The Company shall begin Construction Activities no later than January 1, 2014 (“Commencement Date”) and secure a final Certificate of Compliance by June 30, 2015 (hereinafter, “Completion Date”).

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner [shall/shall not] transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.

  • Governing Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the laws of the State of New York. The section headings in this Agreement have been inserted as a matter of convenience of reference and are not a part of this Agreement.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

Time is Money Join Law Insider Premium to draft better contracts faster.