Common use of Design-Build Work Clause in Contracts

Design-Build Work. In the event that MBUSI asks Supplier to perform any Services or manufacture the Items on a design-build basis, Supplier shall perform all design, manufacture, construction and/or installation services, and provide all material, equipment, tools and labor necessary to complete the Items and Services described in and reasonably inferable from the Agreement to produce the intended result. Supplier shall, consistent with applicable state licensing law, provide or procure the necessary design services, including architectural, engineering and other design professional services, for the preparation of both drawings and specifications to enable the Supplier to complete the Items and Services in a manner that is consistent with the Agreement. Supplier shall continuously submit interim design documents to MBUSI for MBUSI's review per MBUSI's schedule. If MBUSI does not approve the submissions, MBUSI will return them to Supplier and Supplier shall revise the submissions and return them to MBUSI within five (5) days for approval. Once the detailed drawings and specifications have been approved by MBUSI, they shall become the Specifications. Supplier shall submit one set of the final drawings and final specifications to MBUSI immediately upon such approval. MBUSI's review and approval of the design submissions is for purposes of establishing an acceptable set of drawings and specifications which are in line with its requirements.

Appears in 6 contracts

Samples: Master Purchasing Agreement, General Terms and Conditions, General Terms and Conditions

AutoNDA by SimpleDocs

Design-Build Work. In the event that MBUSI XXXxXxx asks Supplier to perform any Services or manufacture the Items on a design-build basis, Supplier shall perform all design, manufacture, construction and/or installation services, and provide all material, equipment, tools and labor necessary to complete the Items and Services described in and reasonably inferable from the Agreement to produce the intended result. Supplier shall, consistent with applicable state licensing law, provide or procure the necessary design services, including architectural, engineering and other design professional services, for the preparation of both drawings and specifications to enable the Supplier to complete the Items and Services in a manner that is consistent with the Agreement. Supplier shall continuously submit interim design documents to MBUSI MBExTra for MBUSIMBExTra's review per MBUSIMBExTra's schedule. If MBUSI MBExTra does not approve the submissions, MBUSI MBExTra will return them to Supplier and Supplier shall revise the submissions and return them to MBUSI MBExTra within five (5) days for approval. Once the detailed drawings and specifications have been approved by MBUSIMBExTra, they shall become the Specifications. Supplier shall submit one set of the final drawings and final specifications to MBUSI MBExTra immediately upon such approval. MBUSIMBExTra's review and approval of the design submissions is for purposes of establishing an acceptable set of drawings and specifications which are in line with its requirements.

Appears in 5 contracts

Samples: Master Purchasing Agreement, General Terms and Conditions, General Terms and Conditions

AutoNDA by SimpleDocs

Design-Build Work. In the event that MBUSI MBV asks Supplier to perform any Services or manufacture the Items on a design-build basis, Supplier shall perform all design, manufacture, construction and/or installation services, and provide all material, equipment, tools and labor necessary to complete the Items and Services described in and reasonably inferable from the Agreement to produce the intended result. Supplier shall, consistent with applicable state licensing law, provide or procure the necessary design services, including architectural, engineering and other design professional services, for the preparation of both drawings and specifications to enable the Supplier to complete the Items and Services in a manner that is consistent with the Agreement. Supplier shall continuously submit interim design documents to MBUSI MBV for MBUSIMBV's review per MBUSIMBV's schedule. If MBUSI MBV does not approve the submissions, MBUSI MBV will return them to Supplier and Supplier shall revise the submissions and return them to MBUSI MBV within five (5) days for approval. Once the detailed drawings and specifications have been approved by MBUSIMBV, they shall become the Specificationsfinal drawings and final specifications. Supplier shall submit one set of the final drawings and final specifications to MBUSI MBV immediately upon such approval. MBUSIMBV's review and approval of the design submissions is for purposes of establishing an acceptable set of drawings and specifications which are in line with its requirements. In the event that MBV provides any drawings or design documents to Supplier in connection with the Services performed by Supplier, Supplier shall inspect such documents of the MBV or any subcontractor of MBV and promptly report to MBV any defects or potential defects therein, including any failure to comply with applicable law and/or architectural, engineering or design requirements.

Appears in 5 contracts

Samples: Master Purchasing Agreement, General Terms and Conditions, General Terms and Conditions

Time is Money Join Law Insider Premium to draft better contracts faster.