Design-Builder Tests and Inspections Sample Clauses

Design-Builder Tests and Inspections. The Design-Builder shall conduct all tests of the Design-Build Work (including shop tests) or inspections required by the Contract Standards. The Design-Builder shall give the Owner and the Owner’s Representative reasonable advance notice (at least 10 Business Days, unless waived or shortened by the Owner) of tests or inspections prior to the conduct thereof; provided, however, that in no event shall the inability, failure or refusal to attend or be present of the Owner or the Owner’s Representative at or during any such test or inspection delay the conduct of such test or inspection or the performance of the Design-Build Work. The Design-Builder shall engage an Engineer (or, as appropriate, architect licensed in the State and acceptable to the Owner) at its sole cost and expense to conduct or witness any such test or inspection. All analyses of test samples shall be conducted by persons appearing on lists of laboratories authorized to perform such tests by the State or federal agency having jurisdiction and shall be subject to the approval of the Owner, which approval shall not be unreasonably withheld. In addition to the foregoing, Acceptance Testing of the performance of the completed Design-Build Improvements shall be conducted in accordance with Article 4 (Acceptance of the Design-Build Improvements) and Appendix 7 (Acceptance Test Requirements and Procedures).
AutoNDA by SimpleDocs

Related to Design-Builder Tests and Inspections

  • Tests and Inspections 5.2.1 Tests and Inspections shall comply with title 24, part 1, California Code of Regulations, group 1, article 5, section 4-335, and with the provisions of the Specifications.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • INSPECTION/TESTING All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.