Design Submittal Sample Clauses

Design Submittal. The Cooperator shall provide the District with the final design drawings, signed and sealed by a professional engineer, including supporting documentation. The District shall provide written notice to the Cooperator within 30 days of receipt of the design submittal advising if it appears to meet the requirements of this Agreement. The District’s acceptance of the design submittal shall not be construed as an approval of the design, or the architectural, engineering, mechanical, electrical, or other components of the construction bid documents, or that such documents are in compliance with applicable rules, regulations or law, including the District’s.
AutoNDA by SimpleDocs
Design Submittal. The Design Consultant shall submit 30% level design drawings and a design technical memoranda for City review and approval. The 30% Design will, at a minimum, have fulfilled the minimum drafting requirements titled Checklist (Minimum) Drafting Design, Attachment 2 of this Exhibit A.
Design Submittal. “Design Submittal” means a set of design documents for the Project that will be submitted to the City for review as the Project moves through various review and approval processes. There shall be four different phases of design submittal as follows:
Design Submittal. Products and Deliverables Assumptions
Design Submittal. The YMCA shall submit to the City concept architectural drawings, including a site plan, elevations plans and floor plans. No later than three (3) months after the submittal of the Scope of Development and Site Plan.
Design Submittal. The Consultant shall: • Design and prepare drawings, Contract Documents and special provisions, bid schedule and construction cost estimate to reflect a 60% level of completion. • Provide the special conditions, Special Provisions, and Appendices for insertion into the Contract Documents. • Prepare and submit 60% Opinion of Probable Cost of Construction estimate. • Prepare and furnish PDF files of Project Drawings and Specifications for review and comment. Submit progress drawings and special provisions to the utility agencies. The drawings are anticipated to consist of the following: o Cover, Legend, Drawing Index, Site Map, and General Notes o Horizontal Control Plans o Typical Sections o Removal Plans o Roadway Plan and Profiles o Signing and Striping Plans o Lighting and ITS Plans o Utility Plans o Details The submittal shall also consist of: o Updated Utility Conflict Matrix o Right-of-Way Exhibits o Updated Project Schedule
Design Submittal. The FIRM will provide a 60% design submittal. These documents will be used to obtain an estimate for the guaranteed maximum price proposal for the construction of this project. The 60% submittal will include, but not be limited to: • Draft equipment shop drawings for all major project components. FIRM will work with subconsultants and manufacturers to prepare detailed procurement packages. FIRM will work closely with those manufacturers and provide assistance with completing the draft equipment shop drawings for all major project components. Review all draft major equipment submittal packages and make necessary revisions in preparation for City review and approval. • Technical Specifications. FIRM will prepare specification package utilizing City standard specifications. For those items not covered by City standards, FIRM will prepare required technical specifications. • Drawings for General, Civil Architectural, Structural, Mechanical, HVAC, Plumbing, Electrical, and Instrumentation design. Drawings will include site plans for demolition, construction staging, final site layout, plan and profile drawings for the replacement force main; plan views of the screening structure, in-plant pump station, and grit removal structure, flow equalization tank, building elevations, major sections and details, electrical one-line diagrams, telemetry network diagram, P&ID (panel I/O lists and bill of materials will be in the specifications), and schedules for finishes, doors, windows, louvers, columns and beams, HVAC equipment, plumbing fixtures, lighting fixtures and panels, conduit and cable, and electrical distribution. Updates from the 60% and 90% drawings will be tracked and shown on each sequential design update. • Control System Improvements Workshop. The FIRM will provide recommendations to be included in the design to incorporate the facility improvements into the new control system, select the proposed analytical and process control instruments associated with the improvements, upgrade the plant Supervisory Control and Data Acquisition (SCADA) system to match on-going work efforts being completed by the City, and develop the proposed control strategies for the proposed process systems. The FIRM will follow City standards for SCADA controls. A workshop will be held with the City to discuss the preliminary control system improvements prior to completion of the 60% drawings. • Maintenance of Plant Operations (MOPO) Workshop. A workshop will be held with the City t...
AutoNDA by SimpleDocs
Design Submittal. The FIRM will prepare a 90% design submittal based on the comments received at the 60% design submittal review meeting with the City. The 90% submittal will include, but not limited to: • Equipment shop drawings. FIRM will review and comment on shop drawings provided by equipment manufacturers based on the updated 60% documents. • Drawings for General, Civil, Architectural, Structural, Mechanical, HVAC, Plumbing, Electrical, Instrumentation design. Drawings will be updated based on comments received for the 60% documents along with updates based on shop drawing review as well as remaining details, notes, and legends. Updated Drawings will be ready for submittal along with the equipment manufacturer’s shop drawings (which will include complete control panel wiring diagrams and panel elevations). • Technical Specifications will be updated based on comments received for the 60% documents along with updates based on shop drawing review. • The FIRM will provide quality assurance and quality control (QA/QC) review prior to submittal to the City.
Design Submittal. The KFA Team will prepare and submit plans to FOR for review at the 60% design stage. A copy of the Plan Sheets will be provided for BCPW for coordination purposes.
Design Submittal. The Customer shall obtain all necessary documentation for inclusion with the design submittal after the preliminary site evaluation by CSD. This may include, in addition to the critical area designation and letter of water availability noted above, recorded well covenants, site plan survey and other supporting documentation. Until this necessary documentation is received by CSD, CSD will not schedule the project for design completion and submittal.