Displacement Meters Sample Clauses

Displacement Meters. Displacement meters may be used for batch operations, or high accuracy totalizing when rate of flow is not required. A removable strainer shall be installed ahead of each meter. For further information, refer to Project Specification 5578-E2-SP-IE-00001, Flow Instruments.
AutoNDA by SimpleDocs

Related to Displacement Meters

  • Displacement (a) An Employee whose position is eliminated by the Employer or who is displaced in accordance with this Article shall, provided the Employee has not less than 24 months of seniority: (i) have the right to displace an Employee with less seniority in a position for which the Employee has the ability to perform the work; (ii) at the Employee’s option, take a position which is vacant and for which the Employee has the ability to perform the work; or (iii) at the Employee’s option, accept layoff with the right of recall. If an Employee elects (i) or (ii) and the Employer determines that the Employee does not have the ability to perform the work of the position selected, the Employer shall inform the Employee and the Local of such within 10 consecutive calendar days, exclusive of Saturdays, Sundays and Named Holidays which are specified in Article 18: Named Holidays, of the Employee making such selection. The Employee shall then have the right to make another selection in accordance with Article 15.04. (b) An Employee exercising the right to displace another Employee or to take a vacant position pursuant to Article 15.04(a) shall within 72 hours, exclusive of Saturdays, Sundays or Named Holidays, of receipt of written notice from the Employer of the elimination of the Employee’s position or displacement, advise the Employer, in writing, of their decision, including the name of the Employee they wish to displace or the vacant position they wish to take. Where there is more than one (1) Employee on that unit with an equivalent full-time equivalency, Shift pattern, and length of Shift, to that of the selected position, the Employee shall displace the least senior of such Employees. Where the Employee fails to exercise such right within the specified time limit, the Employee shall be deemed to have waived the right to displace another Employee or take a vacant position and the Employer shall: (i) place the Employee in any available vacant position of the Employer’s choice for which the Employee has the ability to perform the work and is within a radius of 50 kilometers from the current site (an Employee may elect to be laid off, with recall rights if the position is located at a site outside the boundaries of the municipality in which the current site is located); or (ii) in the absence of such a vacancy effect a layoff in accordance with Article

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None (2) In the event that, in accordance with the Interconnection Construction Service Agreement, Interconnection Customer has exercised the Option to Build, it is hereby permitted to build in accordance with and subject to the conditions and limitations set forth in that Section, the following portions of the Transmission Owner Interconnection Facilities which constitute or are part of the Customer Facility: None Ownership of the facilities built by Interconnection Customer pursuant to the Option to Build shall be as provided in the Interconnection Construction Service Agreement.

  • Dedicated Transport A DS0-, DS1-, or DS3-capacity transmission facility between Verizon switches (as identified in the LERG) or UNE Wire Centers, within a LATA, that is dedicated to a particular end user or carrier. Dedicated Transport is sometimes referred to as dedicated interoffice facilities ("IOF"). Dedicated Transport does not include any facility that does not connect a pair of Verizon UNE Wire Centers.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!