Document Delivery The Trust has delivered to Forum copies of (i) the Trust's Trust Instrument and Bylaws (collectively, as amended from time to time, "Organic Documents"), (ii) the Trust's Registration Statement and all amendments thereto filed with the U.S. Securities and Exchange Commission ("SEC") pursuant to the Securities Act of 1933, as amended (the "Securities Act"), or the Investment Company Act of 1940, as amended ("1940 Act")(the "Registration Statement"), (iii) the Trust's current Prospectus and Statement of Additional Information of each Fund (collectively, as currently in effect and as amended or supplemented, the "Prospectus"), (iv) each current plan of distribution or similar document adopted by the Trust under Rule 12b-1 under the 1940 Act ("Plan") and each current shareholder service plan or similar document adopted by the Trust ("Service Plan"), and (v) all procedures adopted by the Trust with respect to the Funds (i.e., repurchase agreement procedures), and shall promptly furnish Forum with all amendments of or supplements to the foregoing. The Trust shall deliver to Forum a certified copy of the resolution of the Board of Trustees of the Trust (the "Board") appointing Forum and authorizing the execution and delivery of this Agreement.
Interconnection Customer Obligations The Interconnection Customer shall maintain the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities in a safe and reliable manner and in accordance with this LGIA.
Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.
Document Review (a) During the Evaluation Period, Purchaser and the Licensee Parties shall have the right to review and inspect, at Purchaser’s sole cost and expense, all of the following which, to Seller’s Knowledge, are in Seller’s possession or control (collectively, the “Documents”): all existing environmental reports and studies of the Real Property, real estate tax bills, together with assessments (special or otherwise), ad valorem and personal property tax bills, covering the period of Seller’s ownership of the Property; Seller’s most current lease schedule in the form attached hereto as Exhibit F (the “Lease Schedule”); current operating statements; historical financial reports; the Leases, lease files, Service Contracts, and Licenses and Permits. Such inspections shall occur at a location selected by Seller, which may be at the office of Seller, Seller’s counsel, Seller’s property manager, at the Real Property, in an electronic “war room” or any of the above. Purchaser shall not have the right to review or inspect materials not directly related to the leasing, maintenance and/or management of the Property, including, without limitation, Seller’s internal e-mails and memoranda, financial projections, budgets, appraisals, proposals for work not actually undertaken, income tax records and similar proprietary, elective or confidential information, and engineering reports and studies. (b) Purchaser acknowledges that any and all of the Documents may be proprietary and confidential in nature and have been provided to Purchaser solely to assist Purchaser in determining the desirability of purchasing the Property. Subject only to the provisions of Article XII, Purchaser agrees not to disclose the contents of the Documents or any of the provisions, terms or conditions contained therein to any party outside of Purchaser’s organization other than its attorneys, partners, accountants, agents, consultants, lenders or investors (collectively, for purposes of this Section 5.2(b), the “Permitted Outside Parties”). Purchaser further agrees that within its organization, or as to the Permitted Outside Parties, the Documents will be disclosed and exhibited only to those persons within Purchaser’s organization or to those Permitted Outside Parties who are responsible for determining the desirability of Purchaser’s acquisition of the Property. Purchaser further acknowledges that the Documents and other information relating to the leasing arrangements between Seller and Tenants are proprietary and confidential in nature. Purchaser agrees not to divulge the contents of such Documents and other information except in strict accordance with the confidentiality standards set forth in this Section 5.2 and Article XII. In permitting Purchaser and the Permitted Outside Parties to review the Documents and other information to assist Purchaser, Seller has not waived any privilege or claim of confidentiality with respect thereto, and no third party benefits or relationships of any kind, either express or implied, have been offered, intended or created by Seller, and any such claims are expressly rejected by Seller and waived by Purchaser and the Permitted Outside Parties, for whom, by its execution of this Agreement, Purchaser is acting as an agent with regard to such waiver. (c) Purchaser acknowledges that some of the Documents may have been prepared by third parties and may have been prepared prior to Seller’s ownership of the Property. PURCHASER HEREBY ACKNOWLEDGES THAT, EXCEPT AS EXPRESSLY SET FORTH IN SECTION 8.1 BELOW, SELLER HAS NOT MADE AND DOES NOT MAKE ANY REPRESENTATION OR WARRANTY REGARDING THE TRUTH, ACCURACY OR COMPLETENESS OF THE DOCUMENTS OR THE SOURCES THEREOF. SELLER HAS NOT UNDERTAKEN ANY INDEPENDENT INVESTIGATION AS TO THE TRUTH, ACCURACY OR COMPLETENESS OF THE DOCUMENTS AND IS PROVIDING THE DOCUMENTS SOLELY AS AN ACCOMMODATION TO PURCHASER.
Document Imaging Investor shall be entitled, in its sole discretion, to image or make copies of all or any selection of the agreements, instruments, documents, and items and records governing, arising from or relating to any of Company’s loans, including, without limitation, this Agreement and the other Transaction Documents, and Investor may destroy or archive the paper originals. The parties hereto (i) waive any right to insist or require that Investor produce paper originals, (ii) agree that such images shall be accorded the same force and effect as the paper originals, (iii) agree that Investor is entitled to use such images in lieu of destroyed or archived originals for any purpose, including as admissible evidence in any demand, presentment or other proceedings, and (iv) further agree that any executed facsimile (faxed), scanned, emailed, or other imaged copy of this Agreement or any other Transaction Document shall be deemed to be of the same force and effect as the original manually executed document.
DOCUMENT PREPARATION The Transfer/Deed shall, save for the Land Transfer Tax Affidavit, be prepared in registrable form at the expense of Seller, and any Charge/Mortgage to be given back by the Buyer to Seller at the expense of the Buyer. If requested by Buyer, Seller covenants that the Transfer/Deed to be delivered on completion shall contain the statements contemplated by Section 50(22) of the Planning Act, R.S.O.1990.
Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection. 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by PNG.
Required Documentation The AGENCY is responsible for ensuring that all documents required by this Contract are current and available for the COUNTY’S review upon request. These documents may include, but are not limited to, certificate(s) of insurance, job descriptions and background check confirmations of staff.
Licensed Documentation If commercially available, Licensee shall have the option to require the Contractor to deliver, at Contractor’s expense: (i) one (1) hard copy and one (1) master electronic copy of the Documentation in a mutually agreeable format; (ii) based on hard copy instructions for access by downloading from the Internet
Procurement documents Languages in which the procurement documents are officially available: English