Domain Decomposition Methods Sample Clauses

Domain Decomposition Methods. Another important class of methods we will use for the linear solver are domain de- composition methods. The concept will be explained following [90]. The first method based on a decomposition of the domain was introduced by Xxxxxxx in 1870. His method, referred to as the alternating Xxxxxxx method, can be used to solve elliptic boundary value problems on domains that are the union of two subdo- mains by alternatingly solving the elliptic boundary value problem restricted to the individual subdomains. Consider the domain Ω = Ω1 ∪ Ω2 as shown in Figure 6.2 on which we wish to solve the linear elliptic PDE  Lu = f in Ω, (6.4)  u = g on ∂Ω. We consider here Dirichlet boundary conditions, but other types of boundary Figure 6.2: Original figure by Xxxxxxx [90]. conditions are possible as well. The artificial boundaries are denoted by Γ1 and Γ2, i as shown in Figure 6.2. Let u(k) denote the approximate solution of (6.4) on the subdomain Ωi, i = 1, 2. We begin the alternating Xxxxxxx iterations by selecting an initial guess u(0) for the solution in subdomain Ω2. We then solve for k = 1, 2, ... the boundary value problem   Lu(k) u = f in Ω2
AutoNDA by SimpleDocs

Related to Domain Decomposition Methods

  • Committee Composition The Redeployment Committee shall be comprised of equal numbers of representatives of the Hospital and of the Union. The number of representatives will be determined locally. Where for the purposes of HTAP (the Ontario Hospital Training and Adjustment Panel) there is another hospital-wide staffing and redeployment committee created or in existence, Union members of the Redeployment Committee shall serve on any such hospital-wide staffing committee established with the same or similar terms of reference, and the number of Union members on such committee will be proportionate to the number of its bargaining unit members at the particular Hospital in relation to other staff groups. Meetings of the Redeployment Committee shall be held during normal working hours. Time spent attending such meetings shall be deemed to be work time for which the representative(s) shall be paid by the Hospital at his or her regular or premium rate as may be applicable. Each party shall appoint a co-chair for the Redeployment Committee. Co-chairs shall chair alternative meetings of the Committee and will be jointly responsible for establishing the agenda of the Committee meetings, preparing minutes and writing such correspondence as the Committee may direct.

  • Board Composition Each Stockholder agrees to vote, or cause to be voted, all Shares owned by such Stockholder, or over which such Stockholder has voting control, from time to time and at all times, in whatever manner as shall be necessary to ensure that at each annual or special meeting of stockholders at which an election of directors is held or pursuant to any written consent of the stockholders, the following persons shall be elected to the Board:

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Software Components At any time during the contract period of performance, the Government may require the Contractor to remedy any failure of the software to comply with the requirements of this contract. Support shall consist of correction of errors, provision of modifications, improvements, and other products the original manufacturer makes available to the Government without charge. The Government shall also be provided full documentation of changes and/or modifications to the software provided to meet the Government's requirements.

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Committee Composition and Selection 1. The committee shall be comprised of eight members as follows: • five Teachers • three administrators

  • Alternative Resolution Methods Any time during the grievance process, by mutual consent, the parties may use alternative methods to resolve the dispute. If the parties agree to use alternative methods, the time frames in this Article are suspended. If the selected alternative method does not result in a resolution, the Union may return to the grievance process and the time frames resume. Any expenses and fees of alternative methods will be shared equally by the parties.

  • Validation Mechanism To be eligible for articulation, the student must show evidence of their CompTIA A+ certification and it must have been issued within three (3) years prior to their enrollment in the program.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

Time is Money Join Law Insider Premium to draft better contracts faster.