Common use of DRYWALL CEILING Clause in Contracts

DRYWALL CEILING. a. Carrying channel at 24" on center. b. 1-1/2" cold-rolled carrying channel at 48" on center with hanger wire spaced a maximum of 48" on center along carrying channel. c. 5/8" gypsum wallboard. d. Seismic bracing as required per the Uniform Building Code and as noted on drawings. e. All joints and surfaces shall be taped and sanded smooth to receive primer and paint. (Note: no texture; all painted surfaces shall be 'smooth'). f. Locate all mechanical and electrical equipment requiring access in 2' x 2' lay-in ceiling to avoid access doors in gypsum board ceilings, where possible. SCHEDULE 2 -6- PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems] TENANT IMPROVEMENT STANDARD SPECIFICATIONS XXXXXX XXXXXX CENTER -------------------------------------------------------------------------------- CARRIER XXXXXXX PROJECT NO. 4246.00 MAY 4, 1999 (DRAFT)

Appears in 5 contracts

Samples: Office Lease (Peregrine Systems Inc), Lease Option Agreement (Peregrine Systems Inc), Office Lease (Peregrine Systems Inc)

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.