Electrical Interconnection Facilities. Contractor shall design, construct and install the Electrical Interconnection Facilities (including, without limitation, the Electric Metering Equipment, automatic regulation equipment, Protective Apparatus and control system equipment) in accordance with the Electrical Interconnection Requirements and the other terms and conditions hereof. Contractor shall provide to Owner and the Utility, in detail satisfactory to Owner and the Utility, for their prior reviews and acceptance (which shall not be unreasonably withheld) all plans and specifications relating to the design, construction and installation of the Electrical Interconnection Facilities (and any additions, modifications or replacements thereto), including without limitation single-line diagrams and control and protective relay schemes, not later than twelve (12) months prior to the commencement of construction of such Electrical Interconnection Facilities or such other reasonable time as Owner and the Utility may agree upon pursuant to Section 7.4(b) or 7.6(a) of the Power Purchase Agreement. Owner shall use reasonable efforts to cause the Utility to provide written notification of its acceptance or rejection of such plans and specifications within sixty (60) days after its receipt thereof. Contractor shall not commence the construction and installation of the Electrical Interconnection Facilities without having received the prior written approval of the Owner and the Utility (which approval shall not be unreasonably withheld). Contractor shall review with Owner and, at Owner's request, the Utility, the design and construction schedule for the Electrical Interconnection Facilities, and shall coordinate the performance of such Services with the work to be performed by the Utility on its side of the Electrical Interconnection Point in order to enable the Electrical Interconnection Facilities to be completed and interconnected with the Utility's transmission system in accordance with the time frames (including without limitation Section 5.8 hereof) and performance standards as set forth herein; provided, that Owner hereby acknowledges that Contractor shall not be responsible for managing the activities of the Utility, nor shall Contractor be responsible for such other work performed by the Utility. Contractor shall coordinate with the Utility as is necessary to ensure that either Contractor or the Utility (but not the Owner) shall provide all electrical interconnections between the Electrical Interconnection Facilities and the Utility's transmission system at the Electrical Interconnection Point. Contractor shall also be responsible for arranging for the Utility to make its temporary construction power distribution line available at the Power Plant Site on or before twenty (20) days after the date specified for site mobilization in the Notice to Proceed.

Appears in 3 contracts

Samples: Agreement (Aes Ironwood LLC), Agreement (Aes Ironwood LLC), Agreement (Aes Ironwood LLC)

AutoNDA by SimpleDocs

Electrical Interconnection Facilities. (a) Contractor shall design, construct and install the Electrical Interconnection Facilities (including, without limitation, the Electric Metering Equipment, automatic regulation equipment, Protective Apparatus and control system equipment) in accordance with the Electrical Interconnection Requirements and the other terms and conditions hereof. Contractor shall provide to Owner and (and, at Owner's request, the Transmitting Utility), in detail satisfactory to Owner and (and, if applicable, the Transmitting Utility), for their prior reviews review and acceptance (which shall not be unreasonably withheldwithheld or delayed) all plans and specifications relating to the design, construction and installation of the Electrical Interconnection Facilities (and any additions, modifications or replacements thereto), including without limitation single-line diagrams and control and protective relay schemes, not later than twelve (12) months prior to the commencement of construction of such Electrical Interconnection Facilities or such other reasonable time as Owner Owner, Contractor and the Transmitting Utility may agree upon pursuant to Section 7.4(b) or 7.6(a) of the Power Purchase Agreementupon. Owner shall use reasonable efforts to cause the Transmitting Utility to provide written notification of its comments on and, if applicable, its acceptance or rejection of of) such plans and specifications within sixty (60) days (or if a shorter period of time is reasonably necessary to maintain compliance with the Project Schedule, such shorter period of time as is reasonable under the circumstances) after its Owner's receipt thereofof such plans and specifications. Contractor shall not commence the construction and installation of the Electrical Interconnection Facilities without having received the prior written approval of the Owner (and, if required by the Electrical Interconnection Requirements or otherwise requested by Owner, the Transmitting Utility); PROVIDED, HOWEVER, that in the event that Owner (or, if applicable, the Transmitting Utility) were to unreasonably withhold or delay such approval, and the Utility (which approval Contractor were to be materially adversely affected in the performance of the Services as a direct result thereof despite Contractor's reasonable efforts to avoid or mitigate such effect, the provisions of Section 5.9 hereof shall not be unreasonably withheld)apply. Contractor shall review with Owner and, at Owner's request, the Transmitting Utility, the design and construction schedule for the Electrical Interconnection Facilities, and shall coordinate the performance of such Services with the work to be performed by the Transmitting Utility on its side of the Electrical Interconnection Point in order to enable the Electrical Interconnection Facilities to be completed and interconnected with the Transmitting Utility's transmission system in accordance with the time frames (including without limitation Section 5.8 hereof) and performance standards as set forth herein; provided, that Owner hereby acknowledges that Contractor shall not be responsible for managing the activities of the Utility, nor shall Contractor be responsible for such other work performed by the Utility. Contractor shall coordinate with the Utility as is necessary to ensure that either Contractor or the Utility (but not the Owner) shall provide all electrical interconnections between the Electrical Interconnection Facilities and the Utility's transmission system at the Electrical Interconnection Point. Contractor shall also be responsible for arranging for the Utility to make its temporary construction power distribution line available at the Power Plant Site on or before twenty (20) days after the date specified for site mobilization in the Notice to Proceed.

Appears in 1 contract

Samples: And Construction Services (Aes Red Oak LLC)

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.