Electrical Output Sample Clauses

Electrical Output. 3.1.1 The Generator shall sell and deliver to the Offtaker the Contracted Electrical Output and the Offtaker shall purchase and accept the Contracted Electrical Output from the Generator, in each case in accordance with the provisions of this Agreement. 3.1.2 The Contracted Electrical Output to be sold by the Generator to the Offtaker under this Agreement shall be delivered at the Delivery Point. 3.1.3 The Generator shall sell the Contracted Electrical Output with full title guarantee, free from all charges, liens, other encumbrances and third party claims. 3.1.4 Property, title and risk in the Contracted Electrical Output shall pass to the Offtaker upon delivery to the Delivery Point.
AutoNDA by SimpleDocs
Electrical Output. 2.1.1 The "Electrical Output" of the Facility shall be as specified in this Agreement adjusted, based on manufacturer and Contractor supplied correction curves. 2.1.2 Net Electrical Output" is the sum of the power produced by the CTGs and the STG, less the auxiliary loads to run plant equipment and electrical losses in GSU transformers, interconnecting transmission lines, auxiliary transformers and other distribution facilities. 2.1.3 For determination of Electrical Output, the Net Electrical Output of the plant shall be measured at either of the following locations at Contractor's option: 1. At the electric power revenue metering equipment which the Owner shall provide at the high side of the main step-up transformers, Owner shall be responsible for calibration of the power revenue metering equipment and shall provide Contractor with calibration data sheets prior to testing. 2. At the high side of each of the main step-up transformers, located on the plant site, with corrections forward to the utility interface using calculated transmission losses
Electrical Output. Subcontractor shall provide the income-eligible property owner(s) or tenant(s) with: 3.1 100 percent of the PV System’s electrical output as specified in Attachment C, at no- cost. If the DCSEU approves a Project(s) over 5 kW in Attachment C, Subcontractor must provide 100 percent of the electrical output from the Project(s) regardless of the level of DCSEU incentive; 3.2 Any credits on the property owner’s or tenant’s electric bill that materializes from generating excess electrical output; and 3.3 A minimum performance guarantee level of 90 percent of the Weather-Adjusted expected output on an annual per-home schedule as specified in the “Performance Guarantee” section below. Subcontractor shall provide the above benefits to the income-eligible property owner(s) or tenant(s) for a minimum of 20 years from the Commercial Operation Date.
Electrical Output. Subcontractor shall provide the income-eligible property owner or tenant with: 2.1 100 percent of the PV System’s electrical output as specified in each work order, at no- cost; 2.2 Any credits on the property owner’s or tenant’s electric bill that materializes from generating excess electrical output; and 2.3 A minimum performance guarantee level of 90 percent of the Weather-Adjusted expected output, on an annual per-home true-up schedule as specified in the “Performance Guarantee” section below. Subcontractor shall provide the above benefits for a minimum of 20 years from the date Subcontractor receives the PTO for the PV System from PEPCO.

Related to Electrical Output

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Pressure The System user is not entitled to deliver natural gas to Gas Connect Austria at the Entry Point Xxxxxxxxxx WAG at a pressure of below 49 bar. Normal cubic meter (Nm³) is a cubic meter of natural gas at 273.15 K (= 0°C) and 101,325 kPa (=1.01325 bara). The natural gas delivered by the System User at the Entry Point Xxxxxxxxxx WAG for transportation must be in line with the following chemical and physical specifications:

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Electricity 14.01 Tenant shall obtain electricity for the Demised Premises on a direct meter basis, Tenant shall be responsible for and pay to the applicable utility all charges for electricity as measured by such meter. Landlord shall not in any way be liable or responsible to Tenant for any loss or damage or expense which Tenant may sustain or incur if either the quantity or character of electric service is changed or is no longer available or suitable for Tenant’s requirements. Any additional riser or risers to supply Tenant’s electrical requirements, upon written request to Tenant, will be installed by Landlord, at the sole cost and expense of Tenant, unless, in Landlord’s reasonable judgment, the same will cause permanent damage or injury to the Building or the Demised Premises or cause or create a dangerous or hazardous condition or interfere with or disturb other tenants or occupants. In addition to the installation of such riser or risers, Landlord will also at the sole cost and expense of Tenant, install all other equipment proper and necessary in connection therewith subject to the aforesaid terms and conditions. Tenant covenants and agrees that at all times its use of electric current shall never exceed the capacity of the feeders to the Building or the risers or wiring installation which Landlord represents is sufficient for ordinary office use. It is further covenanted and agreed by the Tenant that all the aforesaid costs and expenses are chargeable and collectible as Additional Rent and shall be paid by the Tenant to the Landlord within ten (10) days after the rendering of any xxxx or statement to the Tenant therefor. Tenant shall make no alterations or additions to the electric equipment and/or appliances without the prior written consent of Landlord in each instance, which consent shall not be unreasonably withheld, conditioned or delayed. Notwithstanding anything to the contrary herein, should electric service be interrupted for a period of more than five (5) consecutive business days through the sole fault of Landlord so as to prevent Tenant from using at least seventy-five (75%) percent of the Demised Premises, Fixed Rent shall xxxxx until such service resumes and Tenant is able to resume the use of at least seventy-five (75%) percent of the Demised Premises. Should such service interruption prevent Tenant from using at least seventy-five (75%) of the Demised Premises for more than sixty (60) days and be due to the sole fault of Landlord, Tenant shall have the right to terminate this Lease by giving written notice to Landlord no later than the seventieth (70th) consecutive day and vacating no later than the ninetieth (90th) consecutive day. TIME BEING OF THE ESSENCE for Tenant as to both dates. 14.02 Tenant agrees not to connect any additional electrical equipment of any type to the Building electric distribution system, beyond that on Tenant’s approved plans for initial occupancy, other than lamps, computers and other small office machines which consume comparable amounts of electricity, without Landlord’s prior written consent, not to be unreasonably withheld, conditioned or delayed, in each instance. In no event shall Tenant use or install any fixtures, equipment or machines the use of which in conjunction with other fixtures, equipment and machines in the Demised Premises would result in an overload of the electrical circuits servicing the Demised Premises or the Building.