Electrical Power Required For Operations Sample Clauses

Electrical Power Required For Operations. As of the Contract Date, insufficient electricity is available to the Sites to operate the Raw Water Pump Station, Plant, and transmission mains. SRWA shall apply to and make arrangements with TID for TID to extend and install regular electrical service and related improvements to the Raw Water Pump Station Site and Plant Site (the “TID Utility System Improvements”) and to provide sufficient electricity for the operation of the Raw Water Pump Station, Plant, and transmission mains. SRWA shall bear all costs associated with work performed by or on behalf of TID for the extension and installation of the TID Utility System Improvements to the extent such costs are not borne by TID, and the Company shall have no responsibility with respect such costs to extend a permanent electricity supply to the Raw Water Pump Station or Plant. However, the Company shall cooperate with and assist TID with its installation of the TID Utility System Improvements, including (i) providing timely (i.e., in sufficient time so as to accommodate TID’s planning and construction schedule) and accurate information to TID regarding the electricity capacity needs of the Raw Water Pump Station and Plant, (ii) providing a construction schedule to TID with information about when the Company will need regular TID electrical service to complete the Design-Build Work, and (iii) coordinating with and accommodating the TID construction crew or contractor in performing the TID Utility System Improvements work on the Sites. In the event that the TID Utility System Improvements are not constructed with sufficient capacity to provide electricity to operate the Raw Water Pump Station and Plant by the dates required for the Company to conduct pre-Acceptance testing of the Regional Water Facilities or perform the Acceptance Test, the Company shall be entitled to Uncontrollable Circumstance relief as provided in Section 8.3 (Uncontrollable Circumstances - Entitlement to Relief), to the extent such delay materially and adversely affects the Company's ability to perform such Design-Build Work. All costs related to the supply of electrical power to operate the Regional Water Facilities after the Acceptance Date shall be borne by SRWA.
AutoNDA by SimpleDocs

Related to Electrical Power Required For Operations

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Federal Medicaid System Security Requirements Compliance Party shall provide a security plan, risk assessment, and security controls review document within three months of the start date of this Agreement (and update it annually thereafter) in order to support audit compliance with 45 CFR 95.621 subpart F, ADP System Security Requirements and Review Process.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Trunking Requirements 7.2.2.9.1 The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.