Electricity Generation Project Sample Clauses

Electricity Generation Project 
AutoNDA by SimpleDocs

Related to Electricity Generation Project

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Electricity 14.01 Tenant shall obtain electricity for the Demised Premises on a direct meter basis, Tenant shall be responsible for and pay to the applicable utility all charges for electricity as measured by such meter. Landlord shall not in any way be liable or responsible to Tenant for any loss or damage or expense which Tenant may sustain or incur if either the quantity or character of electric service is changed or is no longer available or suitable for Tenant’s requirements. Any additional riser or risers to supply Tenant’s electrical requirements, upon written request to Tenant, will be installed by Landlord, at the sole cost and expense of Tenant, unless, in Landlord’s reasonable judgment, the same will cause permanent damage or injury to the Building or the Demised Premises or cause or create a dangerous or hazardous condition or interfere with or disturb other tenants or occupants. In addition to the installation of such riser or risers, Landlord will also at the sole cost and expense of Tenant, install all other equipment proper and necessary in connection therewith subject to the aforesaid terms and conditions. Tenant covenants and agrees that at all times its use of electric current shall never exceed the capacity of the feeders to the Building or the risers or wiring installation which Landlord represents is sufficient for ordinary office use. It is further covenanted and agreed by the Tenant that all the aforesaid costs and expenses are chargeable and collectible as Additional Rent and shall be paid by the Tenant to the Landlord within ten (10) days after the rendering of any xxxx or statement to the Tenant therefor. Tenant shall make no alterations or additions to the electric equipment and/or appliances without the prior written consent of Landlord in each instance, which consent shall not be unreasonably withheld, conditioned or delayed. Notwithstanding anything to the contrary herein, should electric service be interrupted for a period of more than five (5) consecutive business days through the sole fault of Landlord so as to prevent Tenant from using at least seventy-five (75%) percent of the Demised Premises, Fixed Rent shall xxxxx until such service resumes and Tenant is able to resume the use of at least seventy-five (75%) percent of the Demised Premises. Should such service interruption prevent Tenant from using at least seventy-five (75%) of the Demised Premises for more than sixty (60) days and be due to the sole fault of Landlord, Tenant shall have the right to terminate this Lease by giving written notice to Landlord no later than the seventieth (70th) consecutive day and vacating no later than the ninetieth (90th) consecutive day. TIME BEING OF THE ESSENCE for Tenant as to both dates. 14.02 Tenant agrees not to connect any additional electrical equipment of any type to the Building electric distribution system, beyond that on Tenant’s approved plans for initial occupancy, other than lamps, computers and other small office machines which consume comparable amounts of electricity, without Landlord’s prior written consent, not to be unreasonably withheld, conditioned or delayed, in each instance. In no event shall Tenant use or install any fixtures, equipment or machines the use of which in conjunction with other fixtures, equipment and machines in the Demised Premises would result in an overload of the electrical circuits servicing the Demised Premises or the Building.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.