Events Beyond Our Control If an Event Beyond Our Control occurs and prevents Us from performing any of Our obligations under this Contract to any extent, then We are not required to perform that obligation to the extent and for as long as We are prevented by that Event Beyond Our Control. If such an Event Beyond Our Control occurs and We consider it appropriate to do so, We may notify You of the Event Beyond Our Control by any reasonable means, including by a public announcement.
Procurement from UN Agencies Goods estimated to cost less than $50,000 equivalent per contract may be procured directly from Inter-Agency Procurement Services Agency in accordance with the provisions of paragraphs 3.1 and 3.9 of the Procurement Guidelines.
EVENTS OUTSIDE OUR CONTROL 7.1 We will not be liable or responsible for any failure to perform, or delay in performance of, any of Our obligations under these Terms that is caused by an Event Outside Our Control.
Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.
Factors Beyond the HSP’s Control Despite the foregoing, if the Funder, acting reasonably, determines that the Performance Factor is, in whole or in part, a Factor Beyond the HSP’s Control:
GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.
Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.
Modified Indemnity Where Agreement Involves Design Professional Services Notwithstanding the forgoing, if the services provided under this Agreement are design professional services, as defined by California Civil Code section 2782.8, as may be amended from time to time, the defense and indemnity obligation under Section 1, above, shall be limited to the extent required by California Civil Code section 2782.8.
Special Permit from Relevant Ministerial/ Government Agencies and Foreign Capital Ownership Limitation Raw Material for Explosives (Ammonium Nitrate) with maximum foreign equity ownership of 49% and a special permit from the Minister of Defense (ISIC 2411) Industry of explosive materials and its components for industry need with maximum foreign equity ownership of 49% and a special permit from the Minister of Defense (ISIC 2429) Sugar Industry (Xxxxx Xxxxxxx Sugar, Refined Crystal Sugar and Raw Crystal Sugar) with maximum foreign equity ownership of 95% and a special permit from the Minister of Industry and the Minister of Agriculture, and it has to be integrated with the sugar plantation. The manufacturing of raw crystal sugar is required for any sugar manufacturer with sugarcane input capacity exceeding 8000 tons per day (ISIC 1542) Processing of plantation product industry (similar capacity or exceeding a certain capacity, according to Regulation of Minister of Agriculture Number 26 of 2007 with maximum foreign capital ownership of 95% with a special permit from Minister of Agriculture. - Fiber and Seed Cotton Industry (ISIC1514, 1711) - Crude oil industry (edible oil) from vegetable and animal, coconut oil industry, palm oil industry, rubber to be sheet, thick latex, crumb rubber industry, raw castor oil industry, sugar, sugar cane and sugar cane residue industry, black tea/green tea industry, dry tobacco leaves industry, Copra, Fiber, Coconut Charcoal, Dust, Nata de coco industry, Coffee sorting, cleaning and peeling industry, Cocoa cleaning, peeling and drying industry, cleaning and peeling seed other than coffee and cacao industry, cashew to be dry seed cashew and Cashew Nut Shell Liquid (CNSL) Industry, Peppercorn to be dry white pepper and dry black pepper industry (ISIC 1514, 2429, 1542, 1549, 1600, 2519, 1531)
Erosion Prevention and Control Purchaser’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. Purchaser shall adjust the kinds and intensity of erosion control work done to ground and weather condi- tions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding ex- pected seasonal periods of precipitation or runoff. If Purchaser fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Purchaser shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits under B4.218.