Entrances. Entrances shall be graded concurrently with the Roadway with which they intersect. Once an entrance has been disturbed, it shall be completed as soon as is practicable, including placing the required Base and Surface Course or stabilization. If the entrance must be constructed in stages, such as when there is a substantial change in the elevation of the Roadway with which it intersects, the surface shall be covered with a temporary aggregate stabilization course or other suitable salvaged material until the entrance can be completed and the required Base and Surface or stabilization Course can be placed.
Appears in 2 contracts
Samples: Lump Sum Design Build Agreement, Lump Sum Design Build Agreement
Entrances. Entrances shall be graded concurrently with the Roadway roadway with which they intersect. Once an entrance has been disturbed, it shall be completed as soon as is practicable, including placing the required Base base and Surface Course surface course or stabilization. If the entrance must be constructed in stages, such as when there is a substantial change in the elevation of the Roadway roadway with which it intersects, the surface shall be covered with a temporary aggregate stabilization course or other suitable salvaged material until the entrance can be completed and the required Base base and Surface surface or stabilization Course course can be placed.
Appears in 2 contracts
Samples: Lump Sum Design Build Agreement, Lump Sum Design Build Agreement
Entrances. Entrances shall be graded concurrently with the Roadway Roadwayroadway with which they intersect. Once an entrance has been disturbed, it shall be completed as soon as is practicable, including placing the required Base Basebase and Surface Course Coursesurface course or stabilization. If the entrance must be constructed in stages, such as when there is a substantial change in the elevation of the Roadway Roadwayroadway with which it intersects, the surface shall be covered with a temporary aggregate stabilization course or other suitable salvaged material until the entrance can be completed and the required Base Basebase and Surface Surfacesurface or stabilization Course Coursecourse can be placed.
Appears in 1 contract
Samples: Lump Sum Design Build Agreement