Error estimation Sample Clauses

Error estimation. ‌ To determine the correct error in the diffusion constants and the fraction size dis- tributions we used bootstrapping. Each dataset was build up from all the observed molecules found in 40-200 individual cells. From the total dataset 30 random sub- sets were chosen. These resampled sub-sets were subsequently analyzed as describe before, yielding 60 different diffusion constants (2 for each dataset) and 30 fast frac- tion sizes. The standard deviation of these distributions was taken as an accurate representation of the biological variance among cells and as error estimates for the data obtained on the full data set. A Trailing edge Leading edge t0 C Leading edge Trailing edge cdf (r2) 0.8 0.8 0.6 0.6 0.4 0.4 0.2 0.2 0.0 1st timelag 0.0 5th timelag 10-4 10-3 10-2 10-1 r2(μm2) 10-4 10-3 10-2 10-1 r2(μm2) D 1.0 B 220cnt/pix 0 1µm 1.0 t0 , t1 r E 0.06 0.05 MSD(μm ) 2 0.04 0.01 0.00 Fast fraction size 0.6 0.5 0.4 0.3 0.2 0.1 0.2 0.3 tlag(sec)
AutoNDA by SimpleDocs

Related to Error estimation

  • Cost Estimating The Model may be used to develop cost estimates based on the approximate data provided and conceptual estimating techniques (e.g., volume and quantity of elements or type of system selected).

  • Cost Estimates If this Agreement pertains to the design of a public works project, CONSULTANT shall submit estimates of probable construction costs at each phase of design submittal. If the total estimated construction cost at any submittal exceeds ten percent (10%) of CITY’s stated construction budget, CONSULTANT shall make recommendations to CITY for aligning the PROJECT design with the budget, incorporate CITY approved recommendations, and revise the design to meet the Project budget, at no additional cost to CITY.

  • Cost Estimate An estimate of the total project cost including but not limited to direct expenses, indirect expenses, land cost, and capital expenses.

  • Volume Estimate The estimated volumes of timber by species designated for cutting under B2.3 and expected to be cut under Utilization Standards are listed in A2. If Sale Area Map indicates that there are incom- pletely Marked subdivisions, the objective of Forest Ser- vice shall be to designate for cutting in such subdivisions sufficient timber so that Sale Area shall yield the ap- proximate estimated volume by species or species groups stated in A2. However, the estimated volumes stated in A2 are not to be construed as guarantees or limitations of the timber volumes to be designated for cut- ting under the terms of this contract. Volume adjustments shall not be made under this Section after there is modification for Catastrophic Dam- age under B8.32.

  • Estimates and Reconciliation of Estimates Where estimated expenditures are used to determine the amount of the drawdown, the State will indicate in the terms of the State unique funding technique how the estimated amount is determined and when and how the State will reconcile the difference between the estimate and the State's actual expenditures.

  • Estimating (2) Marketing and sales:

  • Estimate The Engineer shall independently develop and report quantities necessary to construct the contract in standard State bid format at the specified milestones and Final PS&E submittals. The Engineer shall prepare each construction cost estimates using Estimator or any approved method. The estimate shall be provided at each milestone submittal or in DCIS format at the 95% and Final PS&E submittals per State’s District requirement.

  • Estimates User shall pay to Tenant, in advance on a monthly basis, an amount equal to the estimated Rent for each year of the Use Period or part thereof divided by the number of months therein. Attached as Exhibit B is an budget for the Project prepared by Tenant and approved by User, which reflects a good faith estimate of Rent. Based on Exhibit B, the parties have agreed that User will pay to Tenant the monthly sum allocated to User on Exhibit B, in advance, as Tenant’s initial estimate of Rent. From time to time, Tenant may estimate and re-estimate the amount of Rent to be due and deliver a copy of the estimate or re-estimate to User. Thereafter, the monthly installments of Rent shall be appropriately adjusted in accordance with the estimations so that, by the end of the calendar year in question, User shall have paid all of Rent estimated by Tenant for such calendar year. Any amounts paid based on such an estimate shall be subject to adjustment as herein provided when the actual amount of Rent is available for each calendar year or fraction thereof (in the instance of any partial calendar year).

  • Acceptable Estimating System The Contractor shall maintain the acceptable status of their Estimating System and submit updates to the current status, if applicable

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).