Estimated EQR Calculation Sample Clauses

Estimated EQR Calculation. Because the Property will be served by a septic-xxxxx field for sanitary sewer services, the wastewater treatment will be approximately three times more consumptive (15%) than if wastewater was treated through Gypsum’s sanitary sewer plant. Therefore, the designated demand equals 1.5 EQR for a single-family dwelling not exceeding 3,000 square feet with no more than 2,500 square feet of irrigation. Gypsum and Developer agree that the one lot has an estimated EQR of 1.5 EQR, resulting in a total EQR calculation for the Property of
AutoNDA by SimpleDocs

Related to Estimated EQR Calculation

  • Calculation Any figure or percentage referred to in this Agreement shall be carried to seven decimal places.

  • Payment Calculation District shall pay Contractor at a rate of $ per . OR District shall pay Contractor as described in attached Exhibit A

  • Overtime Calculation For the purpose of overtime calculation only, approved or scheduled time off work will be considered the same as time worked.

  • INTEREST CALCULATION COSTS 10.1 As set forth in 31 CFR 205.27, interest calculation costs are defined as those costs necessary for the actual calculation of interest, including the cost of developing and maintaining clearance patterns in support of the interest calculations. Interest calculation costs do not include expenses for normal disbursing services, such as processing of checks or maintaining records for accounting and reconciliation of cash balances, or expenses for upgrading or modernizing accounting systems. Interest calculation costs in excess of $50,000 in any year are not eligible for reimbursement, unless the State provides justification with the annual report.

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).

  • Cost Estimates If this Agreement pertains to the design of a public works project, CONSULTANT shall submit estimates of probable construction costs at each phase of design submittal. If the total estimated construction cost at any submittal exceeds ten percent (10%) of CITY’s stated construction budget, CONSULTANT shall make recommendations to CITY for aligning the PROJECT design with the budget, incorporate CITY approved recommendations, and revise the design to meet the Project budget, at no additional cost to CITY.

  • Interest Calculation Interest on the outstanding principal balance of the Loan shall be calculated by multiplying (a) the actual number of days elapsed in the period for which the calculation is being made by (b) a daily rate based on a three hundred sixty (360) day year by (c) the outstanding principal balance.

  • Cost Estimating The Model may be used to develop cost estimates based on the approximate data provided and conceptual estimating techniques (e.g., volume and quantity of elements or type of system selected).

  • Cost Estimate An estimate of the total project cost including but not limited to direct expenses, indirect expenses, land cost, and capital expenses.

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

Time is Money Join Law Insider Premium to draft better contracts faster.