Excavation and Preparation of Foundation for Concrete Sample Clauses

Excavation and Preparation of Foundation for Concrete. Excavation shall include removal of all materials of whatever nature at all depths and whether wet or dry necessary for the construction foundation and sub-structure (including mass excavation for underground reservoir where applicable) exactly in accordance with lines, levels, grades and curves shown in the drawings or as directed by the Employer/Architects. The bottoms of excavation shall be leveled both longitudinally and transversely or sloped as directed by the Employer/Architects. Should the Contractor excavate to a greater depth or width than shown on the drawings or as directed by the Employer/Architects he shall at his own expense fill the extra depth or width in cement concrete in proportion as extra cost. The Contractor shall report to Employer/Architects when the excavations are ready to receive concrete. No concrete shall be placed in foundations until the Contractor has obtained Employer/Architects' approval. In case, the excavation is done through different strata of soil and if the same is payable as per provision in the Schedule of Quantities the Contractors shall get the dimensions of the strata decided by the Employer/Architects for payment. If no specific provision is made in the Schedule of Quantities it will be presumed that excavation shall be in all type of soil and Contractor's rate shall cover for the same. After the excavation is passed by the Employer/Architects and before laying the concrete, the Contractor shall get the depth and dimensions of excavation and levels (and nature of strata as applicable as per Schedule of Quantities like hard rock, soft rock etc.) and measurements recorded from the Employer/Architects.
AutoNDA by SimpleDocs

Related to Excavation and Preparation of Foundation for Concrete

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • COMPENSATION FOR CONSTRUCTION PHASE SERVICES 5.1 For the Construction Manager’s performance of the Work as described in Section 2.3, the Owner shall pay the Construction Manager the Contract Sum in current funds. The Contract Sum is the Cost of the Work as defined in Section 6.1.1 plus the Construction Manager’s Fee.

  • Allocation and use of scarce resources Any procedures for the allocation and use of scarce resources, including frequencies, numbers and rights of way, will be carried out in an objective, timely, transparent and non-discriminatory manner. The current state of allocated frequency bands will be made publicly available, but detailed identification of frequencies allocated for specific government uses is not required.

  • Preparation of Agreement This Agreement shall not be construed more strongly against any party regardless of who is responsible for its preparation. The parties acknowledge each contributed and is equally responsible for its preparation.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Implementation of Agreement Each Party must promptly execute all documents and do all such acts and things as is necessary or desirable to implement and give full effect to the provisions of this Agreement.

  • Examination of Implementation 1. Without prejudice to the procedures set out in Article 188 (Compensation), once the period of time set out in paragraph 3 of Article 186 (Implementation of the Report) has expired, and there is disagreement between the disputing Parties as to the existence or consistency of the measures taken to comply with the Panel report, such dispute shall be referred to the original Panel wherever possible. If not possible, the procedure pursuant to Article 179 (Panel Selection) shall be followed to appoint a new Panel, in which event the periods set out thereof shall be reduced by half (22). 2. This Panel shall issue its report on the matter within 60 days after the date of the referral of the matter to it. When the Panel considers that it cannot provide its report within this timeframe, it shall inform the Parties in writing of the reasons for the delay together with an estimate of the period within which it will submit its report. Any delay shall not exceed a further period of 30 days unless the Parties otherwise agree.

  • COMPLETION OF AGREEMENT The District and the Union agree that this contract is complete. There shall be no additions to or deletions from the content of any Articles and there shall be no Articles added except by mutual agreement by the Board and the Union. In addition, there shall be no further negotiations on any matter that is within or comes within the scope of representation for the duration of the contract except by mutual agreement.

  • OPERATION OF AGREEMENT This Agreement will be effective and binding immediately upon its execution, but, anything in this Agreement to the contrary notwithstanding, this Agreement will not be operative unless and until a Change in Control occurs. Upon the occurrence of a Change in Control at any time during the Term, without further action, this Agreement shall become immediately operative.

  • Application and Operation of Agreement Clause No. Title

Time is Money Join Law Insider Premium to draft better contracts faster.