Common use of Excavation to Subgrade Clause in Contracts

Excavation to Subgrade. If, upon inspection of the existing gravel base course, the Engineer decided that it is a suitable base, the Contractor shall grade the existing base course to provide for surface drainage. The pitch of the sidewalk shall meet the existing grade or a grade of ¼ inch per foot towards the street. If the existing base is inadequate, the Contractor shall excavate this material to the required depth and place a gravel base at a 6-inch depth under 4-inch sidewalks and 12-inch depth under 6-inch sidewalks at driveways and 9” of gravel under 6” sidewalks and handicap ramps, and pitch the sidewalk to achieve proper drainage to the street. Gravel shall be placed as specified in Item 4. Forms. Side forms and transverse forms for sidewalks shall be clean, smooth, free from warp, of sufficient strength to resist springing out of shape, and of a depth to conform to the thickness of the proposed walk. The forms shall be well staked and thoroughly braced and set to the established lines. All forms shall be oiled before placing concrete. Forms shall not be removed for 12 hours after the concrete has been placed, or long if directed.

Appears in 4 contracts

Samples: Agreement, Agreement, Elevator Constructors

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.