Extra Services. During the course of the project the Trustees may elect to seek additional work beyond that required to be provided by Section 2.0, Architect/Engineer’s Basic Services. Such work shall be considered Extra Services. Extra Services require pre-authorization in writing by the Trustees and countersignature acceptance by the Architect/Engineer. When Extra Services are authorized and accepted, they shall be provided by the Architect/Engineer and shall be paid for by the Trustees as provided in Section 4.2, Compensation, Extra Services. The following services are not covered by Section 2, Architect/Engineer's Basic Services, of this Agreement and are considered extra services: a.) Providing feasibility and or programming studies necessary to define scope for a Schematic Design. b.) Providing civil surveys, site evaluations, or comparative studies of prospective sites. c.) Making measured drawings of existing construction, as required for planning renovation work, if adequate Record Drawings are not available. As a part of basic services, the Architect/Engineer shall confirm the accuracy of available information and shall make themselves familiar with readily observable site and existing building conditions. d.) Revising previously approved work. There shall be no extra services for changes by the Architect/Engineer, required by code, or as a result of Architect/Engineer’s errors or omissions. e.) Providing additional design assessments and remedial documentation for the replacement of work during construction damaged by fire or other causes not the fault of the Architect/Engineer. f.) Providing additional professional services made necessary through no fault of the Architect/Engineer, but by the fault of the contractor or Trustees in the performance of the construction contract, including failure to complete the project on time. No extra services will be authorized in connection with change order preparation arising out of Architect/Engineer's misinterpretations, errors or omissions. g.) Providing additional professional services made necessary to affect a material change of Project Program requested by the Trustees. h.) Providing consulting and engineering services additional to Normal Consulting and Engineering Services (See Section 1.20, Definitions). i.) Providing special delineations or renderings, other than that required in Section 2.0. Architect/Engineer’s Basic Services. j.) Providing professional services to select, design, and/or incorporate Group II furnishings, fixtures or equipment not incorporated in the Project Construction Budget. Coordination with interior design information supplied in a timely manner by the Trustees shall be provided a part of basic services.
Appears in 3 contracts
Samples: Project Architect/Engineer Agreement, Project Architect/Engineer Agreement, Project Architect/Engineer Agreement
Extra Services. During Contractor shall perform the course following Extra Services, only when authorized by a written amendment to this Agreement. The cost for each Extra Service shall be determined before, and no work related to any Extra Service shall be performed until, an amendment is made to this Agreement. In no event shall AOC be responsible for compensating Contractor in excess of the project the Trustees may elect to seek additional work beyond that required to be provided by Section 2.0Contract Amount, Architect/Engineer’s Basic Services. Such work shall be considered Extra Services. Extra Services require pre-authorization in writing unless there is a written amendment executed by the Trustees AOC that specifically increases the Contract Amount. Revisions to Accepted Construction Documents or Design Development documents to accommodate changes (excluding corrections of inconsistencies, errors and countersignature acceptance omissions by Contractor) when so directed by the Architect/EngineerAOC. When Extra Services are authorized and accepted, they shall be provided Preparation of change order documents as requested by the Architect/Engineer AOC (excluding corrections of inconsistencies, errors and shall be paid for omissions by Contractor) after a construction contract has been awarded. Preparation of drawings or change orders as required due to those actions of the Trustees as provided in Section 4.2, Compensation, Extra ServicesAOC that are beyond the scope of the Contractor’s responsibilities. The following services are not covered by Section 2, Architect/Engineer's Basic Services, Preparation of this Agreement and are considered extra services:
a.) Providing feasibility and or programming studies necessary to define scope for a Schematic Design.
b.) Providing civil surveys, site evaluations, or comparative studies of prospective sites.
c.) Making measured drawings of existing construction, structures except as required for planning renovation workthe design services. Selection of moveable furniture, if adequate Record Drawings equipment, or other articles that are not availableincluded in the construction contract unless otherwise specified in this Agreement. As a part Services necessary to supervise correction of basic servicesdefects or damage to the Project (excluding corrections arising from inconsistencies, the Architect/Engineer shall confirm the accuracy errors and omissions of available information and shall make themselves familiar with readily observable site and existing building conditions.
d.) Revising previously approved workContractor). There shall be no extra services for changes Services necessitated by the Architect/Engineer, required by code, delinquency or as a result of Architect/Engineer’s errors or omissions.
e.) Providing additional design assessments and remedial documentation for the replacement of work during construction damaged by fire or other causes not the fault insolvency of the Architect/Engineer.
f.) Providing additional professional services made CM at Risk during or after the guarantee period. Preparation of such alternates to be included in the Construction Documents as may be deemed necessary through no fault of the Architect/Engineer, but by the fault of AOC. Joining with and assisting the contractor AOC in defending any claim or Trustees in the performance of the construction contract, including failure action related to complete the project on time. No extra services will be authorized in connection with change order preparation or arising out of Architect/Engineerthe Contractor's misinterpretationsdesign (not attributable to inconsistencies, errors or omissions.
g.omissions on the part of the Contractor) Providing additional professional services made of the Project. Additional rendering and/or models as may be deemed necessary to affect a material change of Project Program requested by the Trustees.
h.) Providing consulting and engineering services additional to Normal Consulting and Engineering Services (See Section 1.20, Definitions).
i.) Providing special delineations or renderings, other than that required AOC beyond those included in Section 2.0. Architect/Engineer’s the Basic Services.
j.) Providing professional services , will be an Extra Service. The hourly rates which include direct costs, indirect costs, overhead, administrative costs, and profit, to selectbe utilized in arriving at a negotiated fee for Extra Services, designare set forth in Exhibit D. Payment for Extra Services will be either on a time and materials basis or a firm fixed price, and/or incorporate Group II furnishings, fixtures or equipment not incorporated in the Project Construction Budget. Coordination with interior design information supplied in a timely manner as determined by the Trustees shall be provided a part of basic AOC. For projects that extend over multiple fiscal years the AOC may consider, in its sole discretion, increases to hourly rates, for extra services.
Appears in 2 contracts
Samples: Standard Agreement, Standard Agreement
Extra Services. During the course of the project the Trustees may elect to seek additional work beyond that required to be provided by Section 2.0, Architect/Engineer’s Basic Services. Such work shall be considered Extra Services. Extra Services require pre-authorization in writing by the Trustees and countersignature acceptance by the Architect/Engineer. When Extra Services are authorized and accepted, they shall be provided by the Architect/Engineer and shall will be paid for by the Trustees as provided in per Section 4.2, Compensation, Extra Services. The following services are not covered by Section 22.0, Architect/Engineer's Basic Services, of this Agreement and are considered extra servicesExtra Services:
a.) Providing feasibility Feasibility and or programming studies necessary to define scope for a Schematic Design.
b.) Providing civil Civil surveys, or site evaluations, or comparative studies of prospective sitesutilities location verification.
c.) Making measured Documents or drawings of existing construction, as required for planning renovation work, if adequate Record Drawings are not available. As a part of basic servicesBasic Services, the Architect/Engineer shall confirm assess the accuracy of available as built information and shall make themselves familiar with readily observable site and existing building conditions.
d.) Revising previously approved work. There shall be no extra services Extra Services for changes by the Architect/Engineer, required by code, or as a result of Architect/Engineer’s errors or omissions.
e.) Providing additional design Design assessments and remedial documentation for the replacement of work during construction damaged by fire or other causes not the fault of the Architect/Engineer.
f.) Providing additional professional services made necessary through no fault of due to the Architect/Engineer, but by the fault actions of the contractor or Trustees in the performance of the construction contract, including failure to complete construction durations exceeding the project on timeoriginal specified duration. No extra services Extra Services will not be authorized in connection with change order preparation orders arising out of Architect/Engineer's misinterpretations, errors or omissions.
g.) Providing additional professional services made necessary to affect a material change of Project Program requested by the Trustees.
h.) Providing consulting and engineering services additional to Normal Consulting and Engineering Services (See Section 1.20, Definitions)Services.
i.h.) Providing special delineations Delineations or renderings, other than that required in Section 2.0. Architect/Engineer’s Basic Services2.6.
j.i.) Providing professional Professional services to select, design, and/or incorporate Group II (furnishings, fixtures or equipment and equipment) not incorporated in the Project Construction Budget. Coordination with interior design information supplied in a timely manner by the Trustees shall be provided a part of basic servicesBasic Services.
j.) Providing additional project site visits or additional construction administration phase reporting requested by Trustees.
k.) Providing services specific to LEED documentation and project certification.
l.) Providing BIM model data revisions/reductions for usability by Facilities Management and Operations.
Appears in 2 contracts
Samples: Small Project Architect/Engineer Agreement, Small Project Architect/Engineer Agreement
Extra Services. During the course of the project the Trustees may elect to seek additional work beyond that required to be provided by Section 2.0, Architect/Engineer’s Basic Services. Such work shall be considered Extra Services. Extra Services require pre-authorization in writing by the Trustees and countersignature acceptance by the Architect/Engineer. When Extra Services are authorized and accepted, they shall be provided by the Architect/Engineer and shall will be paid for by the Trustees as provided in per Section 4.2, Compensation, Extra Services. The following services are not covered by Section 22.0, Architect/Engineer's Basic Services, of this Agreement and are considered extra servicesExtra Services:
a.) Providing feasibility Feasibility and or programming studies necessary to define scope for a Schematic Design.
b.) Providing civil Civil surveys, or site evaluations, or comparative studies of prospective sitesutilities location verification.
c.) Making measured Measured drawings of existing construction, as required for planning renovation work, if adequate Record Drawings are not available. As a part of basic servicesBasic Services, the Architect/Engineer shall confirm the accuracy of available as built information and shall make themselves familiar with readily observable site and existing building conditions.
d.) Revising previously approved work. There shall be no extra services Extra Services for changes by the Architect/Engineer, required by code, or as a result of Architect/Engineer’s errors or omissions.
e.) Providing additional design Design assessments and remedial documentation for the replacement of work during construction damaged by fire or other causes not the fault of the Architect/Engineer.
f.) Providing additional professional services made necessary through no fault of due to the Architect/Engineer, but by the fault actions of the contractor or Trustees in the performance of the construction contract, including failure to complete construction durations exceeding the project on timeoriginal specified duration. No extra services Extra Services will not be authorized in connection with change order preparation orders arising out of Architect/Engineer's misinterpretations, errors or omissions.
g.) Providing additional professional services made necessary to affect a material change of Project Program requested by the Trustees.
h.) Providing consulting and engineering services additional to Normal Consulting and Engineering Services (See Section 1.20, Definitions)Services.
i.h.) Providing special delineations Delineations or renderings, other than that required in Section 2.0. Architect/Engineer’s Basic Services2.6.
j.i.) Providing professional Professional services to select, design, and/or incorporate Group II (furnishings, fixtures or equipment and equipment) not incorporated in the Project Construction Budget. Coordination with interior design information supplied in a timely manner by the Trustees shall be provided a part of basic servicesBasic Services.
j.) Providing additional project site visits or additional construction administration phase reporting requested by Trustees.
k.) Providing services specific to LEED documentation and project certification.
l.) Providing BIM model data revisions/reductions for usability by Facilities Management and Operations.
Appears in 2 contracts
Samples: Small Project Architect/Engineer Agreement, Small Project Architect/Engineer Agreement
Extra Services. During the course of the project the Trustees may elect to seek additional work beyond that required to be provided by Section 2.0, Architect/EngineerDesign-Builder’s Basic Services. Such work shall be considered Extra Services. Extra Services services require pre-authorization in writing by the Trustees and countersignature acceptance by the Architect/EngineerDesign-Builder. When Extra Services extra services are authorized and accepted, they shall be provided by the Architect/Engineer Design-Builder and shall be paid for by the Trustees as provided in Section 4.2, Compensation, Extra Services. The following services are not covered by Section 2, Architect/Engineer's Design-Builder’s Basic Services, of this Agreement and are considered extra services:
a.) a. Providing feasibility and or programming studies necessary to define scope for a Schematic Design.
b.) b. Providing civil surveys, site evaluations, or comparative studies of prospective sites.
c.) c. Making measured drawings of existing construction, as required for planning renovation work, if adequate Record Drawings are not available. As a part of basic services, the Architect/Engineer Design-Builder shall confirm the accuracy of available information and shall make themselves familiar with readily observable site and existing building conditions.
d.) d. Revising previously approved work. There shall be no extra services for changes by the Architect/EngineerDesign-Builder, required by code, or as a result of Architect/EngineerDesign-Builder’s errors or omissions.
e.) e. Providing additional design assessments and remedial documentation for the replacement of work during construction damaged by fire or other causes not the fault of the Architect/EngineerDesign-Builder.
f.) f. Providing additional professional services made necessary through no fault of the Architect/EngineerDesign-Builder, but by the fault of the contractor or Trustees in the performance of the construction contract, including failure to complete the project on time. No extra services will be authorized in connection with change order preparation arising out of Architect/Engineer's Design-Builder’s misinterpretations, errors or omissions.
g.) g. Providing additional professional services made necessary to affect a material change of Project Program requested by the Trustees.
h.) h. Providing consulting and engineering services additional to Normal Consulting and Engineering Services (See Section 1.20, Definitions).
i.) i. Providing special delineations or renderings, other than that required in Section 2.0. Architect/Engineer’s Basic Services.
j.) Providing professional services to select, design, and/or incorporate Group II furnishings, fixtures or equipment not incorporated in the Project Construction Budget. Coordination with interior design information supplied in a timely manner by the Trustees shall be provided a part of basic services.
Appears in 2 contracts
Extra Services. During the course of the project the Trustees may elect to seek additional work beyond that required to be provided by Section 2.0, Architect/Engineer’s Basic Services. Such work shall be considered Extra Services. Extra Services services require pre-authorization in writing by the Trustees and countersignature acceptance by the Architect/Engineer. When Extra Services extra services are authorized and accepted, they shall be provided by the Architect/Engineer and shall be paid for by the Trustees as provided in Section 4.2, Compensation, Extra Services. The following services are not covered by Section 2, Architect/Engineer's Basic Services, of this Agreement and are considered extra services:
a.) Providing feasibility and or programming studies necessary to define scope for a Schematic Design.
b.) Providing civil surveys, site evaluations, or comparative studies of prospective sites.
c.) Making measured drawings of existing construction, as required for planning renovation work, if adequate Record Drawings are not available. As a part of basic services, the Architect/Engineer shall confirm the accuracy of available information and shall make themselves familiar with readily observable site and existing building conditions.
d.) Revising previously approved work. There shall be no extra services for changes by the Architect/Engineer, required by code, or as a result of Architect/Engineer’s errors or omissions.
e.) Providing additional design assessments and remedial documentation for the replacement of work during construction damaged by fire or other causes not the fault of the Architect/Engineer.
f.) Providing additional professional services made necessary through no fault of the Architect/Engineer, but by the fault of the contractor or Trustees in the performance of the construction contract, including failure to complete the project on time. No extra services will be authorized in connection with change order preparation arising out of Architect/Engineer's misinterpretations, errors or omissions.
g.) Providing additional professional services made necessary to affect a material change of Project Program requested by the Trustees.
h.) Providing consulting and engineering services additional to Normal Consulting and Engineering Services (See Section 1.20, Definitions).
i.) Providing special delineations or renderings, other than that required in Section 2.0. Architect/Engineer’s Basic Services.
j.) Providing professional services to select, design, and/or incorporate Group II furnishings, fixtures or equipment not incorporated in the Project Construction Budget. Coordination with interior design information supplied in a timely manner by the Trustees shall be provided a part of basic services.
k.) Providing additional project site visits or additional construction administration phase reporting requested by Trustees.
Appears in 2 contracts
Samples: Project Architect/Engineer Agreement, Project Architect/Engineer Agreement
Extra Services. During the course of the project the Trustees may elect to seek additional work beyond that required to be provided by Section 2.0, Architect/Engineer’s Basic Services. Such work shall be considered Extra Services. Extra Services services require pre-authorization in writing by the Trustees and countersignature acceptance by the Architect/Engineer. When Extra Services extra services are authorized and accepted, they shall be provided by the Architect/Engineer and shall be paid for by the Trustees as provided in Section 4.2, Compensation, Extra Services. The following services are not covered by Section 2, Architect/Engineer's Basic Services, of this Agreement and are considered extra services:
a.) Providing feasibility and or programming studies necessary to define scope for a Schematic Design.
b.) Providing civil surveys, site evaluations, or comparative studies of prospective sites.
c.) Making measured drawings of existing construction, as required for planning renovation work, if adequate Record Drawings are not available. As a part of basic services, the Architect/Engineer shall confirm the accuracy of available information and shall make themselves familiar with readily observable site and existing building conditions.
d.) Revising previously approved work. There shall be no extra services for changes by the Architect/Engineer, required by code, or as a result of Architect/Engineer’s errors or omissions.
e.) Providing additional design assessments and remedial documentation for the replacement of work during construction damaged by fire or other causes not the fault of the Architect/Engineer.
f.) Providing additional professional services made necessary through no fault of the Architect/Engineer, but by the fault of the contractor or Trustees in the performance of the construction contract, including failure to complete the project on time. No extra services will be authorized in connection with change order preparation arising out of Architect/Engineer's misinterpretations, errors or omissions.
g.) Providing additional professional services made necessary to affect a material change of Project Program requested by the Trustees.
h.) Providing consulting and engineering services additional to Normal Consulting and Engineering Services (See Section 1.20, Definitions).
i.) Providing special delineations or renderings, other than that required in Section 2.0. Architect/Engineer’s Basic Services.
j.) Providing professional services to select, design, and/or incorporate Group II furnishings, fixtures or equipment not incorporated in the Project Construction Budget. Coordination with interior design information supplied in a timely manner by the Trustees shall be provided a part of basic services.
k.) Providing additional project site visits or additional construction administration phase reporting requested by Trustees.
Appears in 1 contract
Samples: Project Architect/Engineer Agreement