Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.
Manufacturing (a) The Supplier shall without limitation be responsible, at no additional cost to the Purchaser, for: sourcing and procuring all raw materials for the Products; obtaining all necessary approvals, permits and licenses for the manufacturing of the Products; providing sufficient qualified staff and workers to perform the obligations under this Purchase Agreement; implementing and maintaining effective inventory and production control procedures with respect to the Products; and handling other matters as reasonably requested by the Purchaser from time to time. (b) The Supplier shall not change any process, material, component, packaging or manufacturing location without the Purchaser’s express prior written approval.
Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following; a) the proposed change(s), and a description of the difference to the existing contract requirements; b) a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Procuring Entity may incur in implementing the value engineering proposal; and c) a description of any effect(s) of the change on performance/functionality.
Laboratory a. Drug tests shall be conducted by laboratories licensed and approved by SAMSHA which comply with the American Occupational Medical Association (AOMA) ethical standards. Upon advance notice, the parties retain the right to inspect the laboratory to determine conformity with the standards described in this policy. The laboratory will only test for drugs identified in this policy. The City shall bear the cost of all required testing unless otherwise specified herein. b. Tests for all controlled substances, except alcohol, shall be by oral fluid testing and shall consist of two procedures, a screen test and, if that is positive, a confirmation test. c. To be considered positive for reporting by the laboratory to the City, both samples must be tested separately in separate batches and must also show positive results on the confirmatory test. d. In the event of a positive test, the testing laboratory will perform an automatic confirmation test on the original specimen at no cost to the Covered Employee. In addition, the testing laboratory shall preserve a sufficient specimen to permit an independent re-testing at the Covered Employee’s request and expense. The same, or any other, approved laboratory may conduct re-tests. The laboratory shall endeavor to notify the designated MRO of positive drug, alcohol, or adulterant tests results within five (5) working days after receipt of the specimen.
Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.
Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.
Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.
Design XXX XXX XXXXX Plan and Aligned Budget
SAMPLE (If applicable and the project has specifications, insert the specifications into this section.)
Fabrication Making up data or results and recording or reporting them.