Common use of Formwork Clause in Contracts

Formwork. Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re- use. Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks. 7 Bases m3 0.3 8 Making and testing set of three 150x150x150mm concrete strength test cubes (Provisional). No 1 REINFORCEMENT High tensile steel reinforcement to structural concrete work: 9 12mm Diameter bars. t 0.10 PLUMBING AND DRAINAGE (PROVISIONAL) Galvanised steel Pipe 10 65mm Mild steel galvanised pipes fixed to elevated tank stand. m 20 Extra over for pipe fittings. 11 Bend No 12 ELEVATED POLYETHYLENE WATER TANK 12 Supply and Erect Galvanised Mild Steel Water Tank Stand to support 1 x 10 000 litre and 1 x 5 000 litre Polyethylene Water Tanks (elsewhere measured) at 4000mm height above natural ground level. t 1.00 13 Supply and Install 1 x 10 000 litre Polyethylene water tank complete with all control valves, fittings, holding down ties or straps etc and install to Elevated tank stand (elsewhere measured) at 4 000mm height from natural ground level. No 1 Carried to Collection R Supply and fit complete to manufacturer's standards the following to downpipes and tanks to prevent blocking and intrusion of mosquitoes and pests to tanks. 14 Leaf eater rain heads No 1 15 Screen filter No 1 16 First flush diverters No 1

Appears in 19 contracts

Samples: Principal Building Agreement, Principal Building Agreement, Principal Building Agreement

AutoNDA by SimpleDocs

Formwork. Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re- use. Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks. 7 Bases m3 0.3 8 Making and testing set of three 150x150x150mm concrete strength test cubes (Provisional). No 1 REINFORCEMENT High tensile steel reinforcement to structural concrete work: 9 12mm Diameter bars. t 0.10 PLUMBING AND DRAINAGE (PROVISIONAL) Galvanised steel Pipe 10 65mm Mild steel galvanised pipes fixed to elevated tank stand. m 20 Extra over for pipe fittings. 11 Bend No 12 ELEVATED POLYETHYLENE WATER TANK 12 Supply and Erect Galvanised Mild Steel Water Tank Stand to support 1 x 10 000 litre and 1 x 5 000 litre Polyethylene Water Tanks (elsewhere measured) at 4000mm height above natural ground level. t 1.00 1.50 13 Supply and Install 1 x 10 000 litre Polyethylene water tank complete with all control valves, fittings, holding down ties or straps etc and install to Elevated tank stand (elsewhere measured) at 4 000mm height from natural ground level. No 1 14 Supply and Install 1 x 5 000 litre Polyethylene water tank complete with all control valves, fittings, holding down ties or straps etc and install to Elevated tank stand (elsewhere measured) at 4 000mm height from natural ground level. No 1 Carried to Collection R Supply and fit complete to manufacturer's standards the following to downpipes and tanks to prevent blocking and intrusion of mosquitoes and pests to tanks. 14 15 Leaf eater rain heads No 1 15 16 Screen filter No 1 16 17 First flush diverters No 11 18 Allow for clearing site for the width of 1 000 mm where fencing is to be erected including removing trees, shrubs etc. not exceeding 200 mm girth, grubbing up roots and roughly levelling. m2 100

Appears in 4 contracts

Samples: Principal Building Agreement, Principal Building Agreement, Principal Building Agreement

AutoNDA by SimpleDocs

Formwork. Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re- use. Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks. 7 Bases m3 0.3 8 Making and testing set of three 150x150x150mm concrete strength test cubes (Provisional). No 1 REINFORCEMENT High tensile steel reinforcement to structural concrete work: 9 12mm Diameter bars. t 0.10 PLUMBING AND DRAINAGE (PROVISIONAL) Galvanised steel Pipe 10 65mm Mild steel galvanised pipes fixed to elevated tank stand. m 20 Extra over for pipe fittings. 11 Bend No 12 ELEVATED POLYETHYLENE WATER TANK 12 Supply and Erect Galvanised Mild Steel Water Tank Stand to support 1 2 x 10 000 litre and 1 x 5 000 litre Polyethylene Water Tanks (elsewhere measured) at 4000mm height above natural ground level. t 1.00 2.00 13 Supply and Install 1 2 x 10 000 litre Polyethylene water tank tanks complete with all control valves, fittings, holding down ties or straps etc and install to Elevated tank stand (elsewhere measured) at 4 000mm height from natural ground level. No 1 2 Carried to Collection R Supply and fit complete to manufacturer's standards the following to downpipes and tanks to prevent blocking and intrusion of mosquitoes and pests to tanks. 14 Leaf eater rain heads No 1 15 Screen filter No 1 16 First flush diverters No 1

Appears in 1 contract

Samples: Principal Building Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!