Fuel Oil Loading, Unloading, Storage and Handling Procedures Sample Clauses

Fuel Oil Loading, Unloading, Storage and Handling Procedures. Project Company may maintain and provide to MAEM, from time to time, Fuel operations, safety and handling standards and procedures to be followed by Project Company, MAEM and their contractors, agents, employees and suppliers to the Morgantown Station. MAEM shall provide such standards to their contractors, agents and suppliers.
AutoNDA by SimpleDocs
Fuel Oil Loading, Unloading, Storage and Handling Procedures. Mirant Canal may maintain and provide to MAEM, from time to time, Fuel operations, safety and handling standards and procedures to be followed by Mirant Canal, MAEM and their contractors, agents, employees and suppliers to the Canal Station. MAEM shall provide such standards to their contractors, agents and suppliers.
Fuel Oil Loading, Unloading, Storage and Handling Procedures. Mirant Bowline may maintain and provide to MAEM, from time to time, Fuel operations, safety and handling standards and procedures to be followed by Mirant Bowline, MAEM and their contractors, agents, employees and suppliers to the Bowline Station. MAEM shall provide such standards to their contractors, agents and suppliers.

Related to Fuel Oil Loading, Unloading, Storage and Handling Procedures

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Billing Procedures The Supporting Party will xxxx the Protecting Party for actual costs incurred for Assistance by Hire. Reimbursements will be limited to the provisions of the Agreement and the applicable OP, regardless of whether or not it is authorized on the Resource Order or other documentation produced by the incident. Reimbursable costs may include transportation, salary, overtime, per diem and other approved expenses of Supporting agency personnel. Rates and conditions of use for the equipment and personnel are documented in the OP. Parties shall submit a xxxx within 90 days of the incident. Parties must use their own invoice form for billing under this Agreement to avoid any confusion with other services that may have been ordered under other agreements. Invoices must identify Supporting Party’s name, address, and Taxpayer Identification Number (Department only), fire name, order and request number, and xxxx number and amount. Invoice supporting documentation must include description of services performed, period of services performed, and any applicable cost share agreements. Supporting documentation will itemize details of billing, listing personnel, equipment, travel and per diem, aircraft, supplies and purchases as approved in the attached AOP. It will also include itemized deductions for maintenance and repair of equipment. Department invoices will include “Record of Activities” (FSLA-5) and U.S. Forest Service invoices will include transaction register. Invoices for services under this agreement must be sent to: Name: Xxxx Xxxxxx-Xxxxx, ECC Manager Address: 0000 Xxxxxxxxx Xxxxx Xxxx, Xxxxx, Xxx: Xxxxxxxxxx, XX 00000 Telephone: (000) 000-0000 FAX: (000) 000-0000 Email: xxxxxxxxxxxx@xx.xxx.xx Name: Spalding Community Service District Address: 000-000 Xxxxxxxx Xxx Xxxx, Xxxxx, Xxx: Xxxxxxxxxx, XX 00000 Telephone: (000) 000-0000 FAX: (000) 000-0000 Email: xxxxxxxxxxxxx@xxxxxxx.xxx All bills will have a payment due date 30 days upon receipt. Contested Xxxxxxxx: Written notice that a xxxx is contested will be mailed to the Party within 30 days of receipt of the invoice and will fully explain the contested items. Contested items should be resolved no later than 60 days following receipt of the written notice. Parties are responsible for facilitating resolution of contested xxxxxxxx. Billing requirements and rates are documented in the attached OP.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.