Full Width Road Construction Sample Clauses

Full Width Road Construction. (Rural Cluster) The full width construction of the roads listed below is required including all other ancillary work to make this construction effective: Road Name: Formation: (Footpath/ Carriageway/ Footpath) (m) Private Road 1 Road Type: Standard Drawing 42 3m/ 8m/ 3m (14m) Pavement Design: Rural (Standard Drawing 42) Private Road 2 Road Type: Standard Drawing 42 2m/ 0.75m/ 6.5m/ 0.75m/ 2m (12m) Pavement Design: Rural (Standard Drawing 42) Private Road 1 and 2 are delineated from one another on the approved subdivision plan. This is one road, with two different formations at different locations either side of the bend fronting lot 5. The concept plan prepared by GDS (Revision G) notes it as a single road numbered one consistent with this intent. At trapped low points, for blind (dead end) roads or where a table drain is required in line with the notes included with Standard Drawing 42 a tail-out drain/s to dissipate runoff from the private road/ table drain must be provided clear of building platforms and sensitive areas. Where a piped outlet/ headwall is proposed the piped outlet must be extended into the affected lot/s to a point beyond the building platform to protect this future dwelling/s from flooding impacts associated with this road runoff. The design of this private road needs to address the following, with respect to the two such outlets identified on the concept plan prepared by GDS (Revision G):  At the trapped low point at chainage 165 fronting lot 7, the pipe must be extended beyond the headwall location currently shown within this lot to the fire trail. It must then run south along the fire trail through lots 6 and 7 to the mapped natural watercourse within the community association lot at the rear boundary of lots 5 and 6.  At the trapped low point at the end of the road/ cul-de-sac, the pipe must be extended beyond the headwall location currently shown within lot 4 to the back of the fire trail within lot 5 adjacent. It must then run north along the fire trail through lot 5 to the same mapped natural watercourse within the community association lot at the rear boundary of lots 5 and 6 referred to above. Where the private road intersects with a public road the crossing needs to delineate the public road from the private road through the inclusion of a gutter crossing rather than a kerb return, pavement threshold treatment or similar. All private roads must include a second sign underneath which reads “private road”.
AutoNDA by SimpleDocs

Related to Full Width Road Construction

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Phased Construction The Construction Manager shall provide recommendations with regard to accelerated or fast-track scheduling, procurement, or phased construction. The Construction Manager shall take into consideration cost reductions, cost information, constructability, provisions for temporary facilities and procurement and construction scheduling issues.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply: