GAS TURBINE TESTS AND INSPECTIONS Sample Clauses

GAS TURBINE TESTS AND INSPECTIONS. 11.8.1.1 ROTOR FINAL BALANCE (OBSERVE) - OPTIONAL THE CUSTOMER REPRESENTATIVE IS INVITED TO OBSERVE THE NORMAL PRODUCTION OPERATION OF FINAL ROTOR BALANCE AT THE APPROPRIATE POINT DURING THE MANUFACTURING CYCLE OF THE CUSTOMER'S UNIT. WHILE GE CAN NOT GUARANTEE THE ROTOR WILL ACTUALLY BE USED IN THE CUSTOMER'S UNIT DUE TO SHIPMENT PRIORITIES, GE WILL MAKE EVERY ATTEMPT TO HAVE THE DESIGNATED ROTOR BE BALANCED. THE COMPLETED ROTOR IS SET UP IN THE BALANCE MACHINE AND STABILIZED. UNBALANCE READINGS ARE TAKEN IN TWO PLANES AT LOW SPEED (300 TO 500 RPM) AND BALANCE CORRECTION IS APPLIED TO ONE OR MORE PLANES BY WEIGHT ADDITION OR REMOVAL. FINAL BALANCE READINGS AND MATHEMATICAL CHECKS ARE PERFORMED TO ASSURE AN ACCEPTABLE ROTOR. Final rotor balance is a single operation on the entire unit for MS6001B, MS6001F, MS7001F, MS9001F gas turbine models (two bearing designs). The MS7001E and MS9001E models, (three bearing designs), have separate balance operations for the compressor section rotor and the turbine section rotor. Manufacturing methods and priorities are such that the customer should plan on separate visits where multiple balancing operations are to be observed. Since GT rotors are considered rigid and are made up of individually balanced, geometrically-controlled components, the low speed balancing operation adequately ensures low vibration levels in the operation unit.
AutoNDA by SimpleDocs

Related to GAS TURBINE TESTS AND INSPECTIONS

  • Tests and Inspections § 15.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Design-Build Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public authorities. Unless otherwise provided, the Design-Builder shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Design-Builder shall give the Owner timely notice of when and where tests and inspections are to be made so that the Owner may be present for such procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or applicable laws or regulations prohibit the Owner from delegating their cost to the Design-Builder. § 15.5.2 If the Owner determines that portions of the Work require additional testing, inspection or approval not included under Section 15.5.1, the Owner will instruct the Design-Builder to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Design-Builder shall give timely notice to the Owner of when and where tests and inspections are to be made so that the Owner may be present for such procedures. Such costs, except as provided in Section 15.5.3, shall be at the Owner’s expense. § 15.5.3 If such procedures for testing, inspection or approval under Sections 15.5.1 and 15.5.2 reveal failure of the portions of the Work to comply with requirements established by the Design-Build Documents, all costs made necessary by such failure shall be at the Design-Builder’s expense. § 15.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Design-Build Documents, be secured by the Design-Builder and promptly delivered to the Owner. § 15.5.5 If the Owner is to observe tests, inspections or approvals required by the Design-Build Documents, the Owner will do so promptly and, where practicable, at the normal place of testing. § 15.5.6 Tests or inspections conducted pursuant to the Design-Build Documents shall be made promptly to avoid unreasonable delay in the Work.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • Maintenance and Inspection Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

  • TESTING AND INSPECTION 6.1 Pre-Commercial Operation Date Testing and Modifications.

  • Visits and Inspections Permit representatives of the Administrative Agent or any Lender, from time to time upon reasonable prior notice to visit and inspect its properties; inspect and make extracts from its books, records and files, including, but not limited to, management letters prepared by independent accountants; and discuss with its principal officers, and its independent accountants, its business, assets, liabilities, financial condition, results of operations and business prospects.

  • Maintaining Records; Access to Properties and Inspections Maintain financial records in accordance with GAAP and, upon reasonable notice, permit any representatives designated by the Administrative Agent or any Lender to visit and inspect the financial records and the properties of the Borrower or any Significant Subsidiary during normal business hours and to discuss the affairs, finances and condition of the Borrower or any Significant Subsidiary with the officers thereof and independent accountants therefor.

  • Audits and Inspections At any time during normal business hours and as often as the City may deem necessary, Service Provider shall make available to the City for the City’s examination all of Service Provider’s records and documents with respect to all matters covered by this Agreement and, furthermore, Service Provider will permit the City to audit, examine and make copies, excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Property Inspections The Servicer shall conduct property inspections in accordance with the milestones of the repair and rehabilitation plan for such Mortgaged Property and prepare Property Inspection Reports on any Mortgaged Property involving property damage over $15,000. The Servicer shall furnish a copy of the repair and rehabilitation plan for such Mortgaged Property to the Master Servicer upon request.

  • Goods Inspection The Commissioner of DAS, in consultation with the Client Agency, shall determine the manner and prescribe the inspection of all Goods and the tests of all samples submitted to determine whether they comply with all of the specifications in the Contract. If any Goods fail in any way to meet the specifications in the Contract, the Client Agency or the Commissioner of DAS may, in its sole discretion, either reject it and owe nothing or accept it and pay for it on an adjusted price basis, depending on the degree to which the Goods meet the specifications. Any decision pertaining to any such failure or rejection shall be final and binding.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!