Global Service Degradation Sample Clauses

Global Service Degradation. Global Service Degradation is deemed to have occurred when 30% or more of the User Sites fail to meet the specified SLA levels. Because of the effort involved in establishing the fact that certain performance parameters have not been attained for all or the majority of User Sites, identifying the existence of performance problems for the percentage of User Sites specified above is considered to be sufficient proof that these performance problems are experienced by all User Sites. When 30% or more of the User Sites do not meet the agreed service levels, it is deemed that the whole Network experiences this degradation and the rebate calculation for performance degradation at individual User Sites will be applied to all User Sites for that period during which Global Network Degradation has taken place.
AutoNDA by SimpleDocs

Related to Global Service Degradation

  • Attachment A, Scope of Services The scope of services is amended as follows:

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Authorized User’s Statement of Work A competitive Mini-Bid is required for every transaction under this Centralized Contract. An Authorized User must prepare a detailed Statement of Work using Appendix F, Attachment 1, Mini-Bid Template. The Authorized User must distribute the Mini-Bid to all qualified Vendors per Lot(s) (unless a Vendor has removed itself from consideration via the Appendix F, Attachment 5, Mini-Bid Participation Interest Template). Contact information, organized by Lot, will be available on the OGS website for this Contract. An Authorized User shall conduct its Mini-Bid in accordance with the requirements set forth in Appendix F, Attachment 2, How to Use this Contract. The following terms and conditions shall apply to each Mini-Bid issued by an Authorized User:  An Authorized User may require the execution of unique forms, such as Confidentiality Non- Disclosure agreements; and  An Authorized User is required to make tentative award and non-award notifications to each Contractor who submitted a response to the Mini-Bid. Additionally, the minimum time, excluding the date of release, between issuance of the Mini-Bid by the Authorized User to the Mini-Bid Opening is as follows:  Xxx 0 Xxxx-Xxxx: Xxxx (0) Xxxxxxxx Xxxx  Xxx 0 Mini-Bids: Ten (10) Business Days

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.

  • Network Resource Interconnection Service (check if selected)

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

Time is Money Join Law Insider Premium to draft better contracts faster.