Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Use Table 1000-1 to determine the maximum allowable water- cementitious material (cement + fly ash) ratio for the classes of concrete listed. the table. 4 100 90- 000 00- 00 0-00 - 0-5 - - - - - A Asphalt Plant Mix 467M 000 00- 000 - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 5 - 100 90- 000 00- 00 0-00 0-5 - - - - - A AST, Sediment Control Stone 57M - 000 00- 000 - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- 000 00- 00 0-00 0-8 - - - - A AST 67 - - 000 00- 000 - 20- 55 0-10 0-5 - - - A AST, Str. Concrete, Asphalt Plant Mix 78M - - - 100 98- 100 75- 000 00- 00 0-00 - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 9 - - - - - 100 85- 000 00- 00 - 0-10 - A AST ABC - 000 00- 00 - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - 000 00- 000 - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization 65

Appears in 2 contracts

Samples: Construction Contract, Contract/Agreement

AutoNDA by SimpleDocs

Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Use Table 1000-1 to determine the maximum allowable water- cementitious material (cement + fly ash) ratio for the classes of concrete listed. the table. 4 100 90- 000 00- 00 0-00 - 0-5 - - - - - A Asphalt Plant Mix 467M 000 00- 000 - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 5 - 100 90- 000 00- 00 0-00 0-5 - - - - - A AST, Sediment Control Stone 57M - 000 00- 000 - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- 000 00- 00 0-00 0-8 - - - - A AST 67 - - 000 00- 000 - 20- 55 0-10 0-5 - - - A AST, Str. Concrete, Asphalt Plant Mix 78M - - - 100 98- 100 75- 000 00- 00 0-00 - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 14M - - - - - 000 00- 00 0-00 - 0-8 - A Asphalt Plant Mix, AST, Weep Hole Drains, Str. Concrete 9 - - - - - 100 85- 000 00- 00 - 0-10 - A AST ABC - 000 00- 00 - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - 000 00- 000 - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization 65Light- weightC - - - - 100 80- 100 5- 40 0-20 - 0-10 - 0-2.5 AST C203778 I-5727 & I-5842 Xxxxxx County with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-40, Tables 1018-1 and 1018-2, PIEDMONT, WESTERN AND COASTAL AREA CRITERIA FOR ACCEPTANCE OF BORROW MATERIAL, under second column in both tables, replace second row with the following: CONCRETE, replace with the following: Page 10-47, Subarticle 1024-3(B), Approved Sources, lines 16-18, replace the second sentence of the second paragraph with the following: Page 10-115, Subarticle 1074-7(B), Gray Iron Castings, lines 10-11, replace the first two sentences with the following: TABLE 1078-1 REQUIREMENTS FOR CONCRETE Property 28 Day Design Compressive Strength 6,000 psi or less 28 Day Design Compressive Strength greater than 6,000 psi Page 10-151, Article 1080-4, INSPECTION AND SAMPLING, lines 18-22, replace (B), (C)

Appears in 1 contract

Samples: Roadway & Structure Contract

AutoNDA by SimpleDocs

Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Use Table 1000-1 to determine the maximum allowable water- cementitious material (cement + fly ash) ratio for the classes of concrete listed. the table. 4 100 90- 000 00- 00 0-00 - 0-5 - - - - - A Asphalt Plant Mix 467M 000 00- 000 - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 5 - 100 90- 000 00- 00 0-00 0-5 - - - - - A AST, Sediment Control Stone 57M - 000 00- 000 - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- 000 00- 00 0-00 0-8 - - - - A AST 67 - - 000 00- 000 - 20- 55 0-10 0-5 - - - A AST, Str. Concrete, Asphalt Plant Mix 78M - - - 100 98- 100 75- 000 00- 00 0-00 - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 14M - - - - - 000 00- 00 0-00 - 0-8 - A Asphalt Plant Mix, AST, Weep Hole Drains, Str. Concrete 9 - - - - - 100 85- 000 00- 00 - 0-10 - A AST ABC - 000 00- 00 - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - 000 00- 000 - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization 65DN00377 SS-4914BQ following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-40, Tables 1018-1 and 1018-2, PIEDMONT, WESTERN AND COASTAL AREA CRITERIA FOR ACCEPTANCE OF BORROW MATERIAL, under second column in both tables, replace second row with the following: Page 10-47, Subarticle 1024-3(B), Approved Sources, lines 16-18, replace the second sentence of the second paragraph with the following: Page 10-73, Article 1056-1, DESCRIPTION, lines 7-8, delete the first sentence of the second paragraph and replace with the following: Page 10-73, Article 1056-2, HANDLING AND STORING, line 17, replace “mechanically stabilized earth (MSE) wall faces” with “temporary wall faces”. Page 10-73, Article 1056-4, GEOTEXTILES, line 33, add the following after the first sentence in the second paragraph: Property Requirement Test Method A. Minimum roll width of 36" required.

Appears in 1 contract

Samples: Contract