High Impact Gypsum Board Sample Clauses

High Impact Gypsum Board has been provided per the locations indicated on the Exhibit 4.01.04.
AutoNDA by SimpleDocs

Related to High Impact Gypsum Board

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Technical Advisory Committee (TAC The goal of this subtask is to create an advisory committee for this Agreement. The TAC should be composed of diverse professionals. The composition will vary depending on interest, availability, and need. TAC members will serve at the CAM’s discretion. The purpose of the TAC is to: • Provide guidance in project direction. The guidance may include scope and methodologies, timing, and coordination with other projects. The guidance may be based on: o Technical area expertise; o Knowledge of market applications; or o Linkages between the agreement work and other past, present, or future projects (both public and private sectors) that TAC members are aware of in a particular area. • Review products and provide recommendations for needed product adjustments, refinements, or enhancements. • Evaluate the tangible benefits of the project to the state of California, and provide recommendations as needed to enhance the benefits. • Provide recommendations regarding information dissemination, market pathways, or commercialization strategies relevant to the project products. The TAC may be composed of qualified professionals spanning the following types of disciplines: • Researchers knowledgeable about the project subject matter; • Members of trades that will apply the results of the project (e.g., designers, engineers, architects, contractors, and trade representatives); • Public interest market transformation implementers; • Product developers relevant to the project; • U.S. Department of Energy research managers, or experts from other federal or state agencies relevant to the project; • Public interest environmental groups; • Utility representatives; • Air district staff; and • Members of relevant technical society committees. • Prepare a List of Potential TAC Members that includes the names, companies, physical and electronic addresses, and phone numbers of potential members. The list will be discussed at the Kick-off meeting, and a schedule for recruiting members and holding the first TAC meeting will be developed. • Recruit TAC members. Ensure that each individual understands member obligations and the TAC meeting schedule developed in subtask 1.11. • Prepare a List of TAC Members once all TAC members have committed to serving on the TAC. • Submit Documentation of TAC Member Commitment (such as Letters of Acceptance) from each TAC member. • List of Potential TAC Members • List of TAC Members • Documentation of TAC Member Commitment

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Technical Committee 1. The Technical Committee shall comprise: (a) nine experts representing different regions of the Agreement Area, in accordance with a balanced geographical distribution; (b) one representative from the International Union for Conservation of Nature and Natural Resources (IUCN), one from the International Waterfowl and Wetlands Research Bureau (IWRB) and one from the International Council for Game and Wildlife Conservation (CIC); and (c) one expert from each of the following fields: rural economics, game management, and environmental law. The procedure for the appointment of the experts, the term of their appointment and the procedure for designation of the Chairman of the Technical Committee shall be determined by the Meeting of the Parties. The Chairman may admit a maximum of four observers from specialized international inter- governmental and non-governmental organizations. 2. Unless the Meeting of the Parties decides otherwise, meetings of the Technical Committee shall be convened by the Agreement secretariat in conjunction with each ordinary session of the Meeting of the Parties and at least once between ordinary sessions of the Meeting of the Parties. 3. The Technical Committee shall: (a) provide scientific and technical advice and information to the Meeting of the Parties and, through the Agreement secretariat, to Parties; (b) make recommendations to the Meeting of the Parties concerning the Action Plan, implementation of the Agreement and further research to be carried out; (c) prepare for each ordinary session of the Meeting of the Parties a report on its activities, which shall be submitted to the Agreement secretariat not less than one hundred and twenty days before the session of the Meeting of the Parties, and copies shall be circulated forthwith by the Agreement secretariat to the Parties; and (d) carry out any other tasks referred to it by the Meeting of the Parties. 4. Where in the opinion of the Technical Committee there has arisen an emergency which requires the adoption of immediate measures to avoid deterioration of the conservation status of one or more migratory waterbird species, the Technical Committee may request the Agreement secretariat to convene urgently a meeting of the Parties concerned. These Parties shall meet as soon as possible thereafter to establish rapidly a mechanism to give protection to the species identified as being subject to particularly adverse threat. Where a recommendation has been adopted at such a meeting, the Parties concerned shall inform each other and the Agreement secretariat of measures they have taken to implement it, or of the reasons why the recommendation could not be implemented. 5. The Technical Committee may establish such working groups as may be necessary to deal with specific tasks.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • MINISTRY/SCHOOL BOARD INITIATIVES ETFO will be an active participant in the consultation process to develop a Ministry of Education PPM regarding Ministry/School Board Initiatives.

  • First Source Hiring Program Contractor must comply with all of the provisions of the First Source Hiring Program, Chapter 83 of the San Francisco Administrative Code, that apply to this Agreement, and Contractor is subject to the enforcement and penalty provisions in Chapter 83.

  • Hospital-Association Committee (a) There shall be a Hospital-Union Committee comprised of representatives of the Hospital, one of whom shall be the Chief Nursing Officer or designate and of the Union, one of whom shall be the Bargaining Unit President or designate. The number of representatives is set out in the Appendix of Local Provisions and the membership of the Committee may be expanded by mutual agreement. (b) The Committee shall meet every two (2) months unless otherwise agreed and as required under Article 8.01 (a) (iv). The duties of chair and secretary shall alternate between the parties. Where possible, agenda items will be exchanged in writing at least five (5) calendar days prior to the meeting. A record shall be maintained of matters referred to the Committee and the recommended disposition, if any, unless agreed to the contrary. Copies of the record shall be provided to Committee members. (c) The purpose of the Committee includes: i) promoting and providing effective and meaningful communication of information and ideas, including but not limited to workload measurement tools and the promotion of best practices. Such communication may include discussion of nursing workload measurement and patient acuity systems. The Hospital will provide, upon request, information on workload measurement systems applicable to nursing currently used by the Hospital, and evaluations completed by the Hospital of such systems. ii) reviewing professional responsibility complaints with a view to identifying trends and sharing organizational successes and solutions, making joint recommendations on matters of concern including the quality and quantity of nursing care and discussing the development and implementation of quality initiatives; iii) making joint recommendations to the Chief Nursing Officer on matters of concern regarding recurring workload issues including the development of staffing guidelines, the use of agency nurses and use of overtime; iv) dealing with complaints referred to it in accordance with the provisions of Article 8, Professional Responsibility; v) discussing and reviewing matters relating to orientation and in- service programs; vi) promote the creation of full-time positions for nurses, and discuss the effect of such changes on the employment status of the nurses. This may include the impact, if any, on part-time and full-time, job sharing and retention and recruitment. (d) The Hospital agrees to pay for time spent during regular working hours for representatives of the Union attending at such meetings. (e) Where a Committee representative designated by the Union attends Committee meetings outside of her or his regularly scheduled hours, she or he will be paid for all time spent in attendance at such meetings at her or his regular straight time hourly rate of pay. Such payment shall be limited to two (2) Committee representatives per meeting.

  • EPP session-­‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a session command plus the reception of the EPP response for only one EPP session command. For the login command it will include packets needed for starting the TCP session. For the logout command it will include packets needed for closing the TCP session. EPP session commands are those described in section 2.9.1 of EPP RFC 5730. If the RTT is 5 times or more the corresponding SLR, the RTT will be considered undefined.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!