Hoist and Crane Erection, Jumping, etc Sample Clauses

Hoist and Crane Erection, Jumping, etc. Cranes and passenger/materials lifts may be erected, raised (jumped) and/or dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant site safety plan. However, all installations, alterations, servicing and/or jumping activities on any dual twin hoist cars on single mast configuration must be carried out whilst both hoist cars are locked off and under the control of the contractor performing works.
AutoNDA by SimpleDocs
Hoist and Crane Erection, Jumping, etc. Cranes and passenger/materials lifts may be erected, raised (jumped) and/or dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant site safety plan.

Related to Hoist and Crane Erection, Jumping, etc

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Metode Penelitian Penelitian ini bersifat deskriptif. Jenis penelitian yang digunakan adalah hukum normatif. Sumber data yang dipergunakan pada penelitian ini adalah data sekunder yang terdiri dari :

  • SUBLOOPS 45.1. Sprint will offer unbundled access to copper subloops and subloops for access to multiunit premises wiring. Sprint will consider all requests for access to subloops through the ICB process due to the wide variety of interconnections available and the lack of standards. A written response will be provided to CLEC covering the interconnection time intervals, prices and other information based on the ICB process as set forth in this Agreement.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

Time is Money Join Law Insider Premium to draft better contracts faster.