IDC PSS/E Base Case Sample Clauses

IDC PSS/E Base Case. (no transmission outages – offline study) For those situations where one or more CAs are being, or have been incorporated into an Operating Entity’s footprint after the freeze date, there will be a generator analysis performed to determine which Flowgates impacted by those CAs will be included in the list of Coordinated Flowgates. In order to confirm the IDC analysis, and to provide a better confidence that the Operating Entity has effectively captured the subset of Flowgates upon which its generators have a significant impact, an offline study utilizing MUST capabilities will be conducted. The Operating Entity will perform off-line studies (using the IDC PSS/E base case) to confirm the IDC analysis. Study 1 and Study 2 are separate studies. There is no requirement that a Flowgate must pass both studies in order to be coordinated.
AutoNDA by SimpleDocs
IDC PSS/E Base Case. (transmission outage - offline study) For those situations where one or more CAs are being, or have been incorporated into an Operating Entity’s footprint after the freeze date, there will be a Flowgate analysis performed to determine which Flowgates impacted by those CAs will be included in the list of Coordinated Flowgates. The Operating Entity, in consultation with affected operating authorities, will perform a prior outage analysis, including both internal and external outages. The Flowgates determined using Study 2 or 4 that have a 3% to 5% distribution factor will be analyzed against prior outage conditions. This study will be performed offline utilizing MUST capabilities. If any Flowgates with a 3% to 5% distribution factor from Study 2 or 4 are impacted by 5% or more from a prior outage condition (Line Outage Distribution Factor LODF) from this method, the Flowgate will be added to the list of Coordinated Flowgates.
IDC PSS/E Base Case. GLDF (transmission outage - offline study) Upon request by an Operating Entity, the Operating Entity to which the request is made will perform a Flowgate analysis to determine which Flowgates impacted by those CAs will be included in the list of Coordinated Flowgates. The Flowgates determined using Study 2 above or Study 4 below that have a 3% to 5% distribution factor will be analyzed in this Study 3 against prior outage conditions. The Operating Entity will perform off-line studies using the IDC PSS/E base case utilizing MUST or other industry- accepted software with similar capabilities. The Operating Entity, in consultation with affected operating authorities, will perform a prior outage analysis, including both internal and external outages, by applying one of the following:
IDC PSS/E Base Case. ‌ (transmission outage - offline study) In order to determine outage conditions (if any) that may cause the Operating Entity’s Control Zones/areas to have a significant impact on Flowgates, the Operating Entity will perform 2nd contingency (n-2) analysis, including both internal and external outages. This study will be performed offline utilizing MUST capabilities. If any additional Flowgates are found using this method, and they represent a 3% or greater impact when reexamined under Study 1 or 4, they will be added to the list of Coordinated Flowgates.

Related to IDC PSS/E Base Case

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Overall Project Schedule The Construction Progress Schedule that is approved by the Owner.

  • Utilization Scale STATE shall scale logs or portions of logs that are broken, wasted, or not removed by PURCHASER due to: (1) improper felling or bucking of the logs; (2) failure to remove the logs prior to deterioration; and (3) logs remaining on the timber sale area after completion of logging, provided the logs were merchantable prior to breakage or wastage. Material used to meet down material requirements in the section titled, "Reserved Timber," shall not be considered for utilization scale. PURCHASER shall pay for the logs at the contract price designated in Section 44. STATE shall notify PURCHASER of the volume of logs so scaled. Payment shall be considered due on such volume as if the logs were removed on the date of said notification. In the event PURCHASER disagrees with the findings made by STATE under this section, PURCHASER may furnish scaling by a third-party scaling organization acceptable to STATE. Costs and expenses of such third party shall be paid for by PURCHASER, and the findings of the third party shall be final.

  • Approved Budget (a) Subject to subsection (b) and subsection (c) below, none of the Credit Parties shall pay any obligations or expenses (including, without limitation, bonus payments or other compensation to senior management personnel, but excluding legal fees and expenses) except to the extent expressly contemplated and permitted in the Current Period of the Approved Budget applicable at the time of such payment. On or before the Wednesday prior to the first Monday of each Fiscal Month of the Borrower, commencing with the Wednesday prior to the first Monday of October 2010, the Borrower shall deliver an updated budget (for the period of 13 weeks commencing with the first day of such Fiscal Month) (each, a “Proposed Budget”) to Agent. Each such Proposed Budget shall be accompanied by a variance report setting forth actual cash receipts and disbursements from the Petition Date through the last day of the preceding month and all variances, on an aggregate basis and, with respect to Specified Budget Line Items, on a line-item basis, for such period from the amounts set forth for the corresponding period in the preceding Approved Budgets (including explanations for each such material variance), certified by the Chief Restructuring Officer as being prepared in good faith and fairly presenting in all material respects the information set forth therein. Each Proposed Budget provided to Agent shall be of no force and effect unless and until it is approved in writing by the Requisite Lenders, and until such approval is given the prior Approved Budget shall remain in effect and no Credit Party may pay any obligations or expenses (excluding legal fees and expenses) other than as permitted (subject to subsection (b) below) in the Current Period of such prior Approved Budget. The Requisite Lenders shall approve or reject each Proposed Budget within four Business Days after delivery by the Borrower to Agent as set forth above, provided that any failure to approve a Proposed Budget shall constitute a rejection of such Proposed Budget. Any such Proposed Budget, upon the written approval of the Requisite Lenders shall become, as of the date of such approval and for the period of time covered thereby, the Approved Budget, and shall prospectively replace any prior Approved Budget.

  • Table 7b - Other milestones and targets Reference Number Select stage of the lifecycle Please select target type from the drop-down menu Description (500 characters maximum) Is this a collaborative target? Baseline year Baseline data Yearly milestones (numeric where possible, however you may use text) Commentary on your milestones/targets or textual description where numerical description is not appropriate (500 characters maximum)

  • INDIVIDUAL CASE BASIS PRICING 42.1. Individual Case Basis (ICB) pricing will be provided by Sprint upon request from the CLEC for customer specific rates or terms for network services and features for UNEs that are not otherwise provided for in this Agreement.

  • Selection Under a Fixed Budget Services for assignments which the Association agrees meet the requirements of paragraph 3.5 of the Consultant Guidelines may be procured under contracts awarded on the basis of a Fixed Budget in accordance with the provisions of paragraphs 3.1 and 3.5 of the Consultant Guidelines.

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

Time is Money Join Law Insider Premium to draft better contracts faster.