ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.
MATERIAL SAFETY DATA SHEETS Contractor is required to ensure Material Safety Data Sheets (“MSDS”) are available, employees are trained in the use of MSDS, and MSDS are in a readily accessible place at the Site. This requirement applies to all materials with an associated MSDS per the federal “Hazard Communication” standard or employees’ Right-to-Know laws. Contractor is also required to ensure proper labeling and training on any substance brought onto the Site and that any person working with the material (or who is subject to possible exposure by use of the material or contact with the material), is informed of the possible and/or real hazards of the substance, and follows proper handling and protection procedures.
Safety Data Sheets If specified by City in the solicitation or otherwise required by this Contract, Contractor must send with each shipment one (1) copy of the Safety Data Sheet (SDS) for each item shipped. Failure to comply with this procedure will be cause for immediate termination of the Contract for violation of safety procedures.
Load Shedding The Distributor may carry out Load Shedding in the following circumstances:
Material Safety Data Sheet Seller shall provide to Buyer with each delivery any Material Safety Data Sheet applicable to the work in conformance with and containing such information as required by the Occupational Safety and Health Act of 1970 and regulations promulgated thereunder or its State approved counterpart.
Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.
List of Operator’s Subprocessors [Box 26] [Box 27] [Box 28] [Box 29]
Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.
Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.
Reference Materials The Board agrees to continue to make available to employees the reference materials maintained by the district. Principals are encouraged to provide additional reference materials of high use in schools where feasible.