Indian Oil Corporation Sample Clauses

Indian Oil Corporation. Limited (IOC) During the year 2013-14 IOC - R&D made significant progress in the demonstration and commercialization of some of the technologies developed in-house. The IndMax technology developed in-house is being actively considered by refineries of other Oil Companies besides the 4.17 million tonnes per annum IndMax unit at its own upcoming Paradip Refinery. IOC’s R&D Centre developed a process “OCTAMAX” for up-gradation of C4 hydrocarbons from refinery LPG stream to high-octane gasoline blending stock. IOC R&D’s Bio-Energy Research Centre signed an agreement with M/s Lanzatech, USA to develop a micro-algae technology that entails development of CO2 to acetate to lipid pathway. IOC’s continuous research efforts in Lubricant technology lead to development of new formulations of low-viscosity and energy-efficient lubricants which in turn helped in expanding its OEM approval. IOC developed 130 new lubricant formulations during the year and obtained 48 product approvals from Original Equipment Manufacturers (OEM)/Customers /Defense. During the year 54 patent applications were filed (25 Indian and 29 Foreign) and 11 patents (1 Indian and 10 foreign) granted. With this, IOC has 292 active patents in its name as on 1st April 2014 including65 registered in US.
AutoNDA by SimpleDocs

Related to Indian Oil Corporation

  • Mitsui Iron Ore Corporation Pty Ltd. to vary the Iron Ore (Marillana Creek) Agreement;

  • Natural Resources Protecting America’s great outdoors and natural resources.

  • Indiana There is no Mortgage Loan that was originated on or after January 1, 2005, which is a "high cost home loan" as defined under the Indiana Home Loan Practices Act (I.C. 24-9).

  • Washtenaw Community College Eastern Michigan University Xxxxxx Xxxxxxxxxx College of Engineering & Technology Student Services BE 214 xxx_xxxxxxxx@xxxxx.xxx; 734.487.8659 734.973.3398

  • Arkansas CANCELLATION section is amended as follows: A ten percent (10%) penalty per month shall be applied to refunds not paid or credited within forty-five (45) days of receipt of returned Service Agreement.

  • Corporation A. For any Concessionaire that presents itself or represents itself as a corporation operating or doing business in the State of New Jersey, all papers of incorporation, including authorized agents for receipt of legal documents, shall be provided to Department, along with renewals, changes, or any other documents that in any way affect the current or future status of Concessionaire as a legal corporation.

  • Pacific Gas and Electric Company “PG&E”), San Diego Gas & Electric Company (“SDG&E”), and Southern California Edison Company (“Edison”) (each a Participating TO) are entering into this agreement transferring Operational Control of their transmission facilities in reliance upon California Public Utilities Code Sections 367, 368, 375, 376, and 379 enacted as part of AB 1890 which contain assurances and schedules with respect to recovery of transition costs.

  • Missouri CANCELLATION section is amended as follows: A ten percent (10%) penalty per month shall be applied to refunds not paid or credited within forty-five (45) days of receipt of returned Service Agreement.

  • Energy 1. Cooperation shall take place within the principles of the market economy and the European Energy Charter, against a background of the progressive integration of the energy markets in Europe.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

Time is Money Join Law Insider Premium to draft better contracts faster.