Indirect Cost Rate3 Sample Clauses

Indirect Cost Rate3. The total indirect costs applicable to this Agreement shall not exceed 15 percent of gross costs (minus the administrative indirect costs) or, if applicable, the indirect cost rate set forth by the Federal Government through the Non-Profit Rate Agreement that is effective on or before the effective date of this Agreement, whichever is higher.
AutoNDA by SimpleDocs

Related to Indirect Cost Rate3

  • Indirect Cost Rates The System Agency may acknowledge an indirect cost rate for Grantees that is utilized for all applicable contracts. Grantee will provide the necessary financial documents to determine the indirect cost rate in accordance with the Uniform Grant Guidance (UGG) and Uniform Grant Management Standards (UGMS).

  • Indirect Cost Except as otherwise authorized by this contract, no indirect costs shall be reimbursed.

  • Indirect Costs If indirect costs are charged, the Subrecipient will develop an indirect cost allocation plan for determining the appropriate Grantee share of administrative costs and shall submit such plan to the Grantee for approval.

  • Direct Costs Insert the major cost elements. For each element, consider the application of the paragraph entitled “Costs Requiring Prior Approval” on page 1 of these instructions.

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Monthly Billing The electric service charge shall be computed in accordance with the monthly billing in the applicable standard service tariff. Customers receiving electric service under residential and small nonresidential schedules 1, 2, 3, 15, 23 or 23B shall be financially credited for such net energy with a cumulative kilowatt-hour credit. The credit will be deducted from the customer’s kilowatt-hour usage on the customer’s next monthly bill thus offsetting the customer’s next monthly bill at the full retail rate of the customer’s rate schedule. Customers receiving electric service under large nonresidential schedules 6, 6A, 6B, 8 or 10 must elect a compensation method to receive cumulative credits for the upcoming annualized billing period from one of the following options (large nonresidential customers must initial desired credit election): an average energy price, a seasonally differentiated energy price, or an average retail rate.

  • Mileage Rates The mileage rate shall be the maximum allowed by the Internal Revenue Service. If the IRS rate should change during the term of the contract, the contract rate shall change also on the date specified by the IRS.

  • GMP Cost Limitation The Guaranteed Maximum Price shall not be in excess of the GMP Cost Limitation.