Industry control / automation Sample Clauses

Industry control / automation. Industrial networks have stringent requirements because they require fast machine-to-machine communication and ultra-reliable connectivity. A system failure could mean loss of equipment, production, or even loss of life. Time-critical process optimization is a key requirement for factories-of-the-future [5G- PPP FoF]. The need for wireless ultra-reliability and virtual zero latency will be driven by uses that include instant optimization based on real-time monitoring of sensors and the performance of components, collaboration between a new generation of robots, and the introduction of wireless connected wearables and augmented reality on the shop floor. Machines can receive, analyse and execute tasks much more quickly than humans. Therefore, machine-to- machine communication requires extremely low latency, for example closed-loop control applications for industry automation require less than 1 ms latency. Indoor traffic control and indoor mobility control of shop floor equipment typically have cycle times around 1-10ms. The highest demands are from actuators and sensors requiring cycle times of less than 1ms with a jitter of less than 1μs. While today’s wired systems meet these requirements, 5G will create a unified platform that addresses a wide range of needs from the company supply chain, to inter-enterprise communication, to the control of actuators/sensors on the factory floor. This will reduce administrative costs compared to maintaining multiple systems, eliminate the cost to install wiring and increase flexibility to change production flow in the factory.
AutoNDA by SimpleDocs

Related to Industry control / automation

  • Control Area An electric power system or combination of electric power systems to which a common automatic generation control scheme is applied in order to:

  • Control Area Notification At least three months before Initial Synchronization Date, Interconnection Customer shall notify Distribution Provider in writing of the Control Area in which the Generating Facility will be located. If Interconnection Customer elects to locate the Generating Facility in a Control Area other than the Control Area in which the Generating Facility is physically located, and if permitted to do so by the relevant transmission tariffs, all necessary arrangements, including but not limited to those set forth in Article 7 and Article 8 of this GIA, and remote Control Area generator interchange agreements, if applicable, and the appropriate measures under such agreements, shall be executed and implemented prior to the placement of the Generating Facility in the other Control Area.

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

  • Data Integrity Control Personal Data will remain intact, complete and current during processing activities.

  • Data Input Control It will be possible to retrospectively examine and establish whether and by whom Personal Data have been entered, modified or removed from SAP data processing systems. Measures: • SAP only allows authorized personnel to access Personal Data as required in the course of their duty. • SAP has implemented a logging system for input, modification and deletion, or blocking of Personal Data by SAP or its subprocessors within the Cloud Service to the extent technically possible.

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • Patch Management All workstations, laptops and other systems that process and/or 20 store PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or 21 transmits on behalf of COUNTY must have critical security patches applied, with system reboot if 22 necessary. There must be a documented patch management process which determines installation 23 timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable 24 patches must be installed within thirty (30) calendar or business days of vendor release. Applications 25 and systems that cannot be patched due to operational reasons must have compensatory controls 26 implemented to minimize risk, where possible.

Time is Money Join Law Insider Premium to draft better contracts faster.