Inspection of metering equipment. a) The inspection and testing of metering equipment or the confirmation of the metering equipment’s accuracy must comply with regulations on electricity metering and must be performed by a competent or authorized organization. The testing should be conducted before the first use of metering equipment to record the purchased and sold electricity power of the plant. All metering equipment must be lead-sealed and locked after the inspection and the Electricity Purchaser has the right to witness this process. b) All metering equipment for electricity trading of the power plant must be tested annually in accordance with the regulations on electricity metering. Inspection costs shall be paid by the Electricity Seller. Where necessary, a Party may propose to verify the accuracy of any metering equipment, the costs of testing shall be paid by the proposed Party. The inspection results of metering equipment must be sent to the other Party upon request. In case the metering equipment has error greater than the level allowed in the regulations on electricity metering, the Electricity Seller is responsible for correction or replacement and returning the excess amount of payment to the Electricity Purchaser together with the interest of this amount - calculated at the basic interest rate - plus the cost of testing the metering equipment. Either party shall be notified in advance by other Party and has the right to appoint personnel to participate in the process of seal removal, inspection, testing and lead-sealing of the meter. In case one party assumes that the meter is broken or does not function properly, that Party shall promptly notify the other Party, the meter must be checked and repaired by its owner.
Appears in 2 contracts
Inspection of metering equipment. a) The testing and inspection and testing of metering equipment or the confirmation of precision of metering equipment shall be done under the metering equipment’s accuracy must comply with regulations on electricity power metering and must be performed by a the competent or authorized organization. The testing should Inspection shall be conducted carried out before using metering equipment for the first use of metering equipment time to record electrical engineer for sale generated by the purchased and sold electricity power of the plant. All metering equipment must shall be lead-sealed with lead and locked after the inspection and the Electricity Purchaser Buyer has the right to witness this process.
b) All metering equipment for electricity trading of the sale power of power plant must shall be tested inspected annually in accordance with the regulations regulation on electricity metering. Inspection In case of necessity, either party can recommend the inspection of precision of any metering equipment and the inspection costs shall be paid by the Electricity Seller. Where necessary, a Party may propose to verify the accuracy of any metering equipment, the costs of testing shall be paid by the proposed Partyrecommending party. The result of inspection results of metering equipment must shall be sent informed to the other Party party upon requestrequirement. In case Where the metering equipment has the error greater than the level allowed permitted limit in the regulations on electricity meteringmetering regulations, the Electricity Seller is responsible for correction shall correct or replacement replace and returning return the excess excessive paid amount of payment to the Electricity Purchaser together with Buyer plus the interest of this the excessive paid amount - calculated at based on the basic interest rate - plus the and cost of testing the metering equipmentinspection of power metering. Either Each party shall be notified informed in advance by other Party and has the right to shall appoint personnel its employee to participate in the process of unsealing and inspection and seal removal, inspection, testing and lead-sealing of with lead the meter. In case Where one party assumes that the meter is broken down or does is not function properlyactive, that Party such party shall promptly notify inform the other Party, party immediately and the party having the meter must be checked shall test and repaired by its ownerrepair it.
Appears in 2 contracts