Installation of Facilities. D2.1. Developer shall be responsible for installing, at its own expense, all auxiliary and interconnecting equipment on Developer's side of the Interconnection Point, including but not limited to, the equipment required for the Interconnection Facilities and transmission line connections to the Utility’s SampleName Substation. These shall include but not be limited to: Power transformer; current & potential transformers; Circuit breaker (to be resolved with completion of design); disconnect switches and grounding system, Busbars and/or cable bus and/or interconnecting wiring, all as necessary.