Interconnections. a. The proposed plant would be interconnected via newly constructed pipelines to allow the final products to be delivered to the market. The proposed new cryogenic plant facility will consist of the following components: • One (1) Slug Catcher sized for 200 MMscfd total gas rate and 250 BBL liquid hold-up capacity. • Stabilization System (1 x 250 bbl) • Inlet Separation and Filtration • Amine Treating for CO2 Removal • TEG Dehydration for H2O Removal • Thermal Oxidizer • Molecular Sieve Dehydration • GSP (or similar) Cryogenic Gas Plant • Residue Compression • NGL Booster and Pipeline Pumps • Flare and closed drain system • Water Supply, Drain Systems, Waste Water • Utilities (fuel, instrument air, R.O. water) • Plant roads, fencing, and security cameras • Control room/warehouse building EXHIBIT 4
Appears in 2 contracts
Interconnections. a. b. The proposed plant would be interconnected via newly constructed pipelines to allow the final products to be delivered to the market. The proposed new cryogenic plant facility will consist of the following components: • One (1) Slug Catcher sized for 200 MMscfd total gas rate and 250 BBL liquid hold-up capacity. • Stabilization System (1 x 250 bbl) • Inlet Separation and Filtration • Amine Treating for CO2 Removal • TEG Dehydration for H2O Removal • Thermal Oxidizer • Molecular Sieve Dehydration • GSP (or similar) Cryogenic Gas Plant • Residue Compression • NGL Booster and Pipeline Pumps • Flare and closed drain system • Water Supply, Drain Systems, Waste Water • Utilities (fuel, instrument air, R.O. water) • Plant roads, fencing, and security cameras • Control room/warehouse building EXHIBIT 4cameras
Appears in 2 contracts