Interim Drainage Facilities Prior to 50% Development Sample Clauses

Interim Drainage Facilities Prior to 50% Development. Until grading permits or improvement plans are approved or final small lot maps are recorded for more than 50% of the developable area within a drainage shed, if the downstream Permanent Drainage Facilities that would be required for Developer’s proposed development of the Property, or any portion thereof, cannot feasibly be constructed due to either the amount of additional Permanent Drainage Facilities that would be required, the ability to obtain necessary right of way and/or any other reasons that County determines would make construction of such downstream Permanent Drainage Facilities impracticable, County may approve the construction of a combination of Permanent Drainage Facilities within and near the Property and other interim drainage facilities, which may consist of temporary detention basins and/or temporary channel improvements (“Interim Drainage Facilities”). Prior to approving any such Interim Drainage Facilities, Developer shall prepare a supplemental drainage report that identifies the reasons why the necessary downstream Permanent Drainage Facilities cannot feasibly be constructed, alternative interim drainage facilities proposed to serve the Property and the interrelationship between the Interim and Permanent Drainage Facilities. The supplemental drainage report shall be subject to the review and approval by the County and may require additional environmental analysis and review and may also require approval by the Other Approval Agencies.
AutoNDA by SimpleDocs

Related to Interim Drainage Facilities Prior to 50% Development

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • PUBLIC FACILITIES Supplier’s employees may be required to perform work at government- owned facilities, including schools. Supplier’s employees and agents must conduct themselves in a professional manner while on the premises, and in accordance with Participating Entity policies and procedures, and all applicable laws.

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to ICG.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Banking Facilities Schedule 3.25 sets forth a complete and correct list of: (a) each bank, savings and loan or similar financial institution in which the Company or any of its Subsidiaries has an account or safety deposit box and the numbers of such accounts or safety deposit boxes maintained thereat; and (b) the names of all persons authorized to draw on each such account or to have access to any such safety deposit box, together with a description of the authority (and conditions thereto, if any) of each person with respect thereto.

  • Toilet Facilities The Employer provides the Contractor access to toilet facilities. Temporary chemical toilets are provided by the Contractor where deemed necessary.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.