Land Use and Resource Management Plan Consistency Sample Clauses

Land Use and Resource Management Plan Consistency. The LURMP of the Delta Protection Commission applies to projects in the Primary Zone of the Delta.2 While the LURMP emphasizes that Primary Zone lands are generally to be used for agriculture, it does not prohibit all non-agricultural uses and, in fact, can be read to encourage habitat restoration (including conservation and mitigation banks) on a limited basis. [See, e.g., Natural Resources Policies 5, 6, 7, and 9.] Consequently, the project appears consistent with the LURMP and the Delta Protection Act.
AutoNDA by SimpleDocs

Related to Land Use and Resource Management Plan Consistency

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Management and Control Systems Grantee will: 1. maintain an appropriate contract administration system to ensure that all terms, conditions, and specifications are met during the term of the contract through the completion of the closeout procedures. 2. develop, implement, and maintain financial management and control systems that meet or exceed the requirements of Uniform Statewide Accounting System (UGMS). Those requirements and procedures include, at a minimum, the following: i. Financial planning, including the development of budgets that adequately reflect all functions and resources necessary to carry out authorized activities and the adequate determination of costs; ii. Financial management systems that include accurate accounting records that are accessible and identify the source and application of funds provided under each Contract of this Contract, and original source documentation substantiating that costs are specifically and solely allocable to a Contract and its Contract and are traceable from the transaction to the general ledger; iii. Effective internal and budgetary controls; iv. Comparison of actual costs to budget; determination of reasonableness, allowableness, and allocability of costs; v. Timely and appropriate audits and resolution of any findings; vi. Billing and collection policies; and vii. Mechanism capable of billing and making reasonable efforts to collect from clients and third parties.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Mineral Reserves and Resources The estimated proven and probable mineral reserves and estimated indicated, measured and inferred mineral resources disclosed in the Company Public Documents since December 31, 2006 have been prepared and disclosed in all material respects in accordance with accepted engineering practices and all applicable Laws. There has been no material reduction in the aggregate amount of estimated mineral reserves, estimated mineral resources or mineralized material of the Company and the Company Subsidiaries, taken as a whole, from the amounts disclosed in the Company Public Documents since December 31, 2006.

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Clinical Management for Behavioral Health Services (CMBHS) System 1. request access to CMBHS via the CMBHS Helpline at (000) 000-0000. 2. use the CMBHS time frames specified by System Agency. 3. use System Agency-specified functionality of the CMBHS in its entirety. 4. submit all bills and reports to System Agency through the CMBHS, unless otherwise instructed.

  • Surgery Services This plan covers surgery services to treat a disease or injury when: • the operation is not experimental or investigational, or cosmetic in nature; • the operation is being performed at the appropriate place of service; and • the physician is licensed to perform the surgery. This plan covers reconstructive surgery and procedures when the services are performed to relieve pain, or to correct or improve bodily function that is impaired as a result of: • a birth defect; • an accidental injury; • a disease; or • a previous covered surgical procedure. Functional indications for surgical correction do not include psychological, psychiatric or emotional reasons. This plan covers the procedures listed below to treat functional impairments. • abdominal wall surgery including panniculectomy (other than an abdominoplasty); • blepharoplasty and ptosis repair; • gastric bypass or gastric banding; • nasal reconstruction and septorhinoplasty; • orthognathic surgery including mandibular and maxillary osteotomy; • reduction mammoplasty; • removal of breast implants; • removal or treatment of proliferative vascular lesions and hemangiomas; • treatment of varicose veins; or • gynecomastia.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Trunk Group Architecture and Traffic Routing 5.2.1 The Parties shall jointly establish Access Toll Connecting Trunks between CLEC and CBT by which they will jointly provide Tandem-transported Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic from and to CLEC's Customers. 5.2.2 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access and non-translated Toll Free traffic (e.g., 800/888) to allow CLEC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier that is connected to the CBT access Tandem. 5.2.3 The Access Toll Connecting Trunks shall be one-way or two-way trunks, as mutually agreed, connecting an End Office Switch that CLEC utilizes to provide Telephone Exchange Service and Switched Exchange Access Service in the given LATA to an access Tandem Switch CBT utilizes to provide Exchange Access in the LATA.